Loading...
PLAY SPACE SERVICES, INC.REQUEST FOR PROPOSALS RFP •R r 1 I 4� s' vNI i a ' 7z ✓� SUBMITTAL DATE: Friday, May 17, 2013 TIME: 10:00 AM CITY OF SOUTH MIAMI REQUEST FOR PROPOSAL DANTE FASCELL PARK POURED -IN -PLACE (PIP) JOGGING TRAIL PROJECT RFP #PR- DS2013 -01 Table of Contents Section Title Page(s) 1. Advertisement for Bids ............................................................... ..............................3 2. Instruction to Bidders ............................................................... ...........................4 -11 3. Contract ..................................................................................... ..........................12 -18 4. Bidder's Representation and Proposal /Bid Form ......... ............................... 19 -21 5. Supplementary Conditions ........................................................ .............................22 6. Specifications /Scope of Work ................................................... .............................23 7. Allowances ............................................................................... ............................... 25 8. Addendum Acknowledgement ................................................. .............................26 9. Anti- Kickback Affidavit ............................................................ ............................... 27 10. Non - Collusive Affidavit .............................................................. .............................28 11. Sworn Statement Public Entity ............................................... ..........................29 -31 12. Supplement Bid Tender ....................................................... ..........................32 -36 13. Performance Bond ................................................................... ..........................37 -38 14. Payment Bond .......................................................................... ..........................39 -41 15. Drug -free Workplace Form ....................................................... .............................42 16. Related Party Transaction ....................................................... ..........................43 -51 17. Contract General Condition .................................................... ..........................52 -79 18. Appendix A ................................................................................... .............................80 CITY OF SOUTH MIAMI REQUEST FOR PROPOSAL DANTE FASCELL PARK POURED -IN -PLACE (PIP) JOGGING TRAIL PROJECT RFP#iPR- DS2013 -01 The City of South Miami is requesting bids from qualified proposers to provide a Poured -In -Place (PIP) jogging trail for the City of South Miami at Dante Fascell Park located at 5900 SW 66 Street, South Miami, FL 33143. Interested proposers should visit the City's website at www.southmiamifl.gov to obtain the REQUEST FOR PROPOSAL package. Packages may also be picked up during normal business hours: City Clerk, City of South Miami 6130 Sunset Drive South Miami, Florida 33143 Sealed submittals including one (1) original and three (9) copies of the submittals plus a CD containing all documents submitted must be received no later than 10:00 AM on 10:00 P.M. on Friday, May 17, 2013 and be clearly marked on the outside, "RFP HPR- DS2013 -01; DANTE FASCELL (PIP) JOGGING TRAIL PROJECT ", Maria M. Menendez, City Clerk, CITY OF SOUTH MIAMI , 6130 Sunset Drive., South Miami , Florida, 33143. Late submittals and electronic submittals will not be accepted. A MANDATORY "pre -bid" meeting will be held on Tuesday, May 7, 2013 at 10:00 AM at Dante Fascell Park, 5900 SW 66 Street, South Miami, FL 33143. Pursuant to City Code, public notice is hereby given that a "Cone of Silence' is imposed concerning the City's competitive purchasing process, which generally prohibits communications concerning the RFP from the time of advertisement of the RFP until the City Commission meeting at which the Commission considers the City Manager's recommendation to the City Commission concerning the competitive purchase transaction. Please see the detailed specifications for the public solicitation for services for a statement fully disclosing the requirements of the "Cone of Silence ". Pursuant to the City Code, vendors of the City are required to disclose any campaign contributions to the City Clerk, and each vendor must do so prior to and as a condition of the award of any City contract to the vendor. Please see the detailed specifications of this solicitation for further details. The City of South Miami reserves the right to accept or reject and /or all proposals or parts of proposals, to workshop or negotiate any and all proposals, to waive irregularities, and to request re- proposals on the required materials or services, or take any other such actions that may be deemed in the best interest of the City. SECTION 2 INSTRUCTIONS TO BIDDERS 1.01. SEALED BIDS The City of South Miami (the "City "), a municipality located in Miami -Dade County, Florida, desires to receive sealed bids for furnishing all goods and services necessary to complete the Work specified in these documents. The City intends to execute an agreement with a selected Contractor to provide such services. 1.02 SCHEDULE OF EVENTS No. Event Date* Time* (EST) 1 Advertisement/ Distribution of RFP & Cone of silence 4/25/2013 5:00 PM begins Mandatory Pre -Bid Conference 2 Dante Fascell Park, 5900 SW 66 Street, South Miami, FL 5/7/2013 10:00 AM 33143 3 Deadline to Submit Questions 5/14/2013 10:00 AM 4 Deadline to City Responses to Questions 5/15/2013 10:00 AM 5 Deadline to Submit Bid- Response 5/17/2013 10:00 AM 6 Evaluation of Bid Responses 5/24/2013 10:00 AM 7 Announcement of Selected Contractors /Cone of Silence 5/31/2013 10:00 PM ends *The City reserves the right to change the scheduled dates and time. 1.03 DEFINITION OF TERMS Terms used in these Instructions to Proposers are defined and have the meaning assigned to them. The term "Proposer" means one who submits a proposal directly to the City as distinct from a Sub- Contractor, who submits a proposal to the Proposer. The term "Successful Proposer' means the best, qualified, responsible and responsive Proposer to whom the City (on the basis of City's evaluation as hereinafter provided) makes an award. The term "City" refers to the City of South Miami, a municipal corporation of the State of Florida. The term "Proposal Package" includes all items as listed and identified in Section IV. The term "Contractor" shall mean the individual(s) or firm to whom the award is made or also referred to as the Successful Proposer. The term "Contractor Administrator" shall mean the City Manager or his designee. Certain terms used in these documents are defined as follows: Bid \Proposal - The bid documents submitted by the Bidder. Bidder /Proposer - Any person, firm or corporation submitting a proposal for the Work covered by these specifications or his duly authorized representative. Owner -The City Commission of the CITY OF SOUTH MIAMI or the City Manager, if applicable. Contractor- The person, firm or corporation with whom the City has executed a contract for the Work. Days - Shall refer to calendar days. In order to be considered a "responsible' bidder, the Bidder must possess integrity as well as adequate equipment and personnel to do the Work within the time limits that are established and adequate financial status to meet the obligations to perform the Work. The firm must not have defaulted on a prior contract or been disbarred by any agency. Any person, firm or corporation submitting a Bid for the Work whose Bid form is complete and includes all required attachments and enclosures, free from exclusions or special conditions and has no alternative Bids for any items, unless alternatives are requested in the specifications. Work - The services required by the Contract Documents, including labor and materials. 1.04 DELIVERY OF BIDS All Bids, whether mailed or delivered in person, shall be submitted in a SEALED ENVELOPE bearing on the outside the following project information as well as the name of the Bidder and his address clearly marked: "DANTE FASCELL PARK POURED -IN PLACE (PIP) JOGGING TRAIL PROJECT." Addressed to: CITY OF SOUTH MIAMI Attn: Maria M. Menendez, City Clerk 6130 Sunset Drive South Miami, Florida 33143 All Bids must be received by the City no later than 10:00 AM on May 17, 2013. 1.05 BID GUARANTY A certified or cashier's check drawn on a national or state bank, or bid bond, in the amount of five percent (5%) of the bid, shall accompany each bid as a guarantee that the Bidder will, if award is made, execute an Agreement to do the Work for the amount proposed and furnish any required certificates of insurance and bond documents. The bid bond shall be from a surety with an A- rating or better under Best's Guidelines, made payable to: The City of South Miami. 1.06 BID FORMS The Bidder shall submit an original Bid on the bid forms attached to this RFP. The Bidder shall fill in all the blank spaces completely for each and every unit item for which a Bid is tendered. The Bidder shall state the price, typewritten or in ink, for which he proposes to do each item of Work. The Bid shall include: 1) Agreement /Contract; 2) Bid Forms; 3) Certificate or Evidence of Insurance; 4) Bid Guarantee; 5) Qualifications Statement; 6) Sworn Statement on Public Entity Crime Form; 7) Addenda acknowledgement, if applicable; 8) Anti - Kickback Affidavit; 9) Non - Collusive Affidavit; 10) Drug Free Workplace form; 11) Related Parties Transaction Verification Form; 12) Acknowledgement of Conformance to OSHA Standards; and 13) Corporate Resolution evidencing authorization to submit Bid, if applicable. 1.07 SIGNATURE ON BID The Bidder shall sign the Bid as follows: If the Bid is made by an individual, the Bidder's name and address shall be shown. If made by a firm or partnership, the name and address of each member of the firm or partnership shall be shown. If made by a corporation, the person signing the Bid shall show the name of the state under the laws of which the corporation is chartered, also the names and business addresses of its corporate officers. The Bid shall bear the seal of the corporation attested by the secretary. Anyone signing the Bid as agent shall include in the Bid legal evidence of his /her authority to do so. 1.08 COST OF BIDS All expenses involved with the preparation and submission of Bids to the City or any work performed in connection therewith, shall be borne by the Bidder(s). No payment shall be made for any responses received, nor for any other effort required of or made by the Bidder(s) prior to commencement of work as defined by the Agreement duly approved by the City Commission. 1.09 QUALIFICATION OF BIDDERS Each Bidder shall submit a completed Qualification Statement utilizing the form attached. 1.10 RIGHT TO REJECT BIDS The City of South Miami reserves the right to accept or reject any and /or all Bids or parts of Bids, to workshop or negotiate any and all Bids, to waive irregularities, and to request re -Bids on the required materials or services. 1.11 AWARD OF CONTRACT 1.11.1 The Award of the Agreement will be to the lowest Responsive and Responsible Bidder, whose qualifications indicate the Award will be in the best interest of the City and whose Bid complies with the requirements of these specifications. In no case will the Award be made until all necessary investigations have been made into the responsibility of the Bidder(s) and the City Manager is satisfied that the Bidder is qualified to do the Work and have the necessary organization, capital and equipment to carry out the Work in the specified timeframes. In evaluating responsibility, the City may also consider previous contracts with the City, past performance and experience with other contracts, compatibility of the project team with City personnel, and any other criteria deemed relevant by the City. 1.11.2 If the City accepts a Bid, the City will provide a written notice of Award to the lowest Responsive and Responsible Bidder, who meets the requirements of Section 1.10.1. 1,11.3 If the successful Bidder to whom an Agreement is awarded forfeits the Award by failing to meet the conditions of subsection 1.12, the City may, at the City's sole option, award the Agreement to the next lowest Responsive and Responsible Bidder or reject all Bids or re- advertise the Work. 1.11.4 The City, at its sole discretion, may consider the lowest and responsive bidder as the bidder who has the lowest bid amount for: DANTE FASCELL PARK (PIP) JOGGING TRAIL PROJECT. 1.12 RETURN OF THE BID GUARANTY All Bid Guarantees of unsuccessful Bidders will be returned after the Agreement is awarded and executed, if requested by unsuccessful bidder. 1.13 EXECUTION OF CONTRACT The successful Bidder(s) shall, within ten (10) days of receipt of a written notice of the Award of the Agreement, deliver to the City a fully executed Agreement and all requested certificates of insurance and bonds. 1.13.1 FORFEITURE OF BID GUARANTY FOR FAILURE TO EXECUTE CONTRACT The failure of the successful Bidder(s) to execute an Agreement and submit required insurance certificates and bonds as specified in subsection 1.12 from "Standard General Conditions of the Construction Contract" will result in forfeit of the Award. Each Bidder agrees in advance that the City will sustain certain damages too difficult to accurately ascertain. Accordingly, if the Award is forfeited under this Section, the amount of the Bid Guaranty of the forfeiting Bidder will be retained by the City, not as forfeiture or a penalty, but as liquidated damages. 1.14 TIME AND AWARD The Bidder agrees to abide by the overall and unit prices quoted in the Bid for up to ninety (90) days from the date of bid opening to allow for the City review, award, and execute the Agreement. 7 1.15 INTERPRETATION AND CLARIFICATION 1.16 All questions about the meaning or intent of the Bid Documents and specifications shall be directed in writing to Steven P. Kulick, Purchasing Manager at (305) 663 -6339 or Email:skulick@southmiamifl.Rov. All correspondences whether in writing or through e-mail must be titled "DANTE FASCELL PARK (PIP) JOGGING TRAIL PROJECT." Interpretation or Clarifications considered necessary by the City in response to such questions will be issued by means of addenda electronically mailed or delivered to all parties that are on record with the City Clerk as having requested and received the Bid Documents. Provided however that it is each Bidder's sole responsibility to be informed of any changes to the RFP in the form of written addenda and the City shall not be responsible for any Bidder's failure to receive same. The City has the right to rely on all Bids received and the submittal of a Bid shall represent the Bidder's acknowledgement that he has read and understood the RFP and any addenda thereto. Written questions must be received by May 14, 2013 at 10:00 AM. Only questions answered by written addenda shall be binding. Oral and other interpretation or clarifications shall be without legal effect. No modifications shall be submitted by Bidder or accepted by the City. 1.17 WITHDRAWAL OFA BID A Bidder may withdraw his Bid at any date and time prior to the time the Bids are scheduled to be opened. Notice of withdrawal should be made in writing to the Maria M. Menendez, City Clerk, City of South Miami, 6130 Sunset Drive., South Miami, Florida, 33143. 1.18 OPENING OF BIDS Bids will be publicly opened and read aloud at the appointed time and place stated in the Request for Proposals. Late Bids will not be considered. No responsibility will be attached to any City Staff for the premature opening of a Bid not properly addressed and identified. Bidders or their authorized agents are invited to be present at the bid opening, 1.19 PUBLIC ENTITY CRIMES ACT In accordance with the Public Entity Crimes Act, (Section 287.133, Florida Statutes) a person or affiliate who is a contractor, who had been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases or real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with the City in excess of the threshold amount provided in Section 287.917, Florida Statutes, for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by the Contractor shall result in rejection of the Bid, termination of the contract, and may cause Contractor debarment. 1.20 CITY LICENSES, PERMITS AND FEES In accordance with the Public Bid Disclosure Act, 218.80, Florida Statutes, each license, permit, or fee a Contractor will have to pay the City before or during the Work or the percentage method or unit method of 8 all licenses, permits and fees required by the City and payable to the City by virtue of the Work as part of the Agreement are as follows: 1.20.1 Contractor shall have and maintain during the term of the Agreement all appropriate City licenses, and fees for which shall be paid in full in accordance with the City's Fee structure for such licenses. THERE WILL NOT BE ANY PERCENTAGE REDUCTION OR WAIVING OF CITY LICENSE FEES, 1.20.2 During the performance of the Agreement there may be times when the Contractor will be required to obtain a City permit for the Work. It is the responsibility of the Contractor to insure that he or she has the appropriate City permits to perform such Work as may become necessary during the performance of the Agreement. Any fees related to City required permits in connection with the Agreement will be the responsibility of the Contractor and will not be reimbursed by the City. Licenses, permits, and fees that may be required by County, State or Federal entities are not included in the above list. 1.21 INSURANCE The Bidder shall be required to provide and maintain insurance coverage of such types and amounts as specified in Article 5 -Bond and Insurance. The Bidder shall include with his or her Bid either Certificates of Insurance evidencing same or documentation from his or her insurer evidencing the insurability of the Bidder to meet the insurance requirements. 1.22 BONDS A Performance and a Payment Bond for the entire base bid amount shall be required in connection with this contract. 1.23 FAMILIARITY WITH LAWS The Bidder is assumed to be familiar with all applicable Federal, State, and local laws, ordinances, rules, and regulations that may in any manner affect the Work. 1.24 EXAMINATION OF BIDDER'S FACILITIES The City, as part of its evaluation may perform an examination of the Bidder's facilities. The City Manager or designee, as part of the evaluation, may perform this examination. The term facilities as used in this solicitation shall include, but shall not be limited to, all properties operated by the Bidder, all equipment used in the performance of business by Bidder, and /or any other evidence, tangible or intangible, that the City may deem necessary to substantiate the technical and other qualifications, and the abilities of the Bidder to perform the Work. The examination shall include, but shall not be limited to, appearance and cleanliness of facilities, appearance and cleanliness of equipment, "road worthiness" of vehicles, appearance and visibility of all signage on vehicles, and possession and distribution of mandatory equipment. Vehicles shall be examined for compliance with State of Florida Statutes, as well as applicable County and City Ordinances. Additionally, examination may include verification of some of the (physical) minimum requirements for Bidders. Additionally, the City reserves the right to perform such examinations on the successful Bidder as often as it deems necessary, to ensure proper performance of the proposed Agreement. 9 1.25 ALLOWANCES Included in the contract sum is an allocation account for unforeseen conditions, potential construction changes and quantity adjustments, and additional work or materials that the City may deem necessary if ordered and authorized by the City in accordance with the Contract Documents. 1.26 CAMPAIGN FINANCE RESTRICTIONS ON VENDORS Pursuant to the City Code, vendors of the City are required to disclose any campaign contributions to the City Clerk, and each vendor must do so prior to and as a condition of the award of any City contract to the vendor. Vendors' Campaign Contribution Disclosure: 1. General requirements: A) Any vendor required to disclose campaign contributions pursuant to the City of South Miami Code of Ordinances as may be amended, shall file a written disclosure with the City Clerk, stating all contributions made that were accepted by an elected official of the City, the official to whom they were made and the date they were made. The City Clerk may develop a form to be used by vendors for such disclosure. B) The disclosure shall be filed prior to and as a condition of the award of any City contract to the Vendor. C) The City Clerk shall inform the Commission of any disclosures which were made in relation to any items before the Commission prior to the hearing on the item or prior to the award of the contract. D) If an existing vendor makes a contribution the vendor must report the same to the clerk within ten days of its acceptance or prior to being awarded any additional contract or renewal, whichever occurs first. E) The City Clerk shall file a quarterly report with the Commission, which lists all the vendor disclosures in the quarter. 2. Disqualification: A) As per the City Charter, if a vendor of products or services who directly or through a member of the person's immediate family or through a political action committee or through any other person makes a campaign contribution to a City candidate and fails to disclose it then he /she /it shall be barred from selling any product or service to the City for a period of two years following the swearing in of the subject elected official. 1.27 CONE OF SILENCE Notwithstanding any other provision of these specifications, the provisions of City "Cone of Silence" are applicable to this transaction. The entirety of these provisions can be found in the City's Purchasing Ordinance. The "Cone of Silence," as used herein, means a prohibition on any communication regarding a particular Request for Proposal ( "UP "), Request for Qualification ( "RFQ ") or bid, between: 10 1. A potential vendor, service provider, proposer, bidder, lobbyist, or consultant; and 2. The City Commission, City's professional staff including, but not limited to, the City Manager and his or her staff, any member of the City's selection or evaluation committee. The Cone of Silence shall be imposed upon each RFC, RFP and bid after the advertisement of said RFQ, RFP, or bid. The Cone of Silence shall terminate at the beginning of the City Commission meeting at which time the City Manager makes his or her written recommendation to the City Commission. However, if the City Commission refers the Manager's recommendation back to the Manager or staff for further review, the Cone of Silence shall be re- imposed until such time as the Manager makes a subsequent written recommendation. The Cone of Silence shall not apply to: a. Oral communications at pre -bid conferences; b. Oral presentations before selection or evaluation committees; c. Public presentations made to the City Commission during any duly noticed public meeting; d. Communication in writing at any time with any City employee, unless specifically prohibited by the applicable RFQ, RFP or bid documents. The bidder or proposer shall file a copy of any written communication with the City Clerk. The City Clerk shall make copies available to any person upon request; e. Communications regarding a particular RFQ RFP or bid between a potential vendor, service provider, proposer, bidder, lobbyist or consultant and the City's Purchasing Agent or City employee designated responsible for administering the procurement process for such RFQ RFP or bid, provided the communication is limited strictly to matters of process or procedure already contained in the corresponding solicitation document; f. Communications with the City Attorney and his or her staff; g. Duly noticed site visits to determine the competency of bidders regarding a particular bid during the time period between the opening of bids and the time the City Manager makes his or her written recommendation; h. Any emergency procurement of goods or services pursuant to City Code; i. Responses to the City's request for clarification or additional information; j. Contract negotiations during any duly noticed public meeting; k. Communications to enable City staff to seek and obtain industry comment or perform market research, provided all communications related thereto between a potential vendor, service provider, proposer, bidder, lobbyist, or consultant and any member of the City's professional staff including, but not limited to, the City Manager and his or her staff are in writing or are made at a duly noticed public meeting. 1.28 LOBBYIST REGISTRATION Proposers must also comply with all City Charter sections and Code provisions that pertain to lobbyists, Please contact the City Clerk at for additional information. 1.29 PROTEST PROCEDURES With respect to a protest of the terms, conditions, and specifications contained in a solicitation (RFP, RFQ, or Bid), including any provisions governing the methods for ranking bids, proposals, or replies, awarding contracts, reserving rights of further negotiation, or modifying or amending any contract, the notice of protest shall be filed in accordance with City Ordinance. [END OF SECTION] SECTION 3 CONTRACT BETWEEN OWNER AND CONTRACTOR THIS CONTRACT is dated as of the _ day of in the year 2013 (which shall be the Effective Date of the Contract) by and between the CITY OF SOUTH MIAMI (hereinafter called "OWNER" or "CITY ") and (hereinafter called "CONTRACTOR "). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: DANTE FASCELL PARK POURED -IN -PLACE JOGGING TRAIL PROJECT The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: CITY OF SOUTH MIAMI DANTE FASCELL PARK POURED -IN -PLACE JOGGING TRAIL PROJECT Article 2. CONSULTANT. The Project's construction, design and inspection services will be provided Owner's representative or by the following; Who is hereinafter called "CONSULTANT" and who will assume all duties and responsibilities and will have the rights and authority assigned to CONSULTANT in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. Article 3. CONTRACT TIME. 3.1 If awarded the Base Bid Work, the contractor may not mobilize prior to . The Work will be substantially completed by and within 90 calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 120 calendar days after the date when the Contract Time commences to run, after such time liquidated damages begin. 3.2 If awarded the Base Bid, the contractor may not mobilize for the Base Bid Work prior to . The Base Bid Work will be substantially completed by and the Base Bid Work will be substantially completed within calendar days after the date when the Contract Time commences upon receiving Notice to Proceed as provided in the General Conditions, and completed and ready for final payment in accordance with the General Conditions within calendar days after the date when the Contract Time commences to run. 3.3 LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Contract and that OWNER will suffer financial loss and other damages if the Work is not substantially or finally complete within the time specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the expense and difficulties 12 involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially or finally complete on time. CONTRACTOR acknowledges and agrees that the actual delay damages which OWNER will suffer in the event of delay in achieving Substantial Completion or Final Completion of the Work are difficult, if not impossible, to determine and that the liquidated damages described herein are a fair and reasonable estimate of the delay damages which the OWNER is expected to suffer in the event of such delay. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree, that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER Five Hundred and 00 /100 dollars ($500.00) for each day that expires after the time specified in Paragraph 3.1 for Substantial Completion until the Work is substantially complete. Liquidated damages shall be deducted from the CONTRACTOR's Applications for Payment. However, if at the time of the CONTRACTOR's Final Application for Payment, CONTRACTOR is owed insufficient amounts to fully cover the deduction for liquidated damages, then CONTRACTOR shall pay any amount due within 10 days of written demand by OWNER. Article 4. CONTRACT PRICE. 4.1 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents and the Schedule of Values provided for payment request purposes in current funds as follows: Contract Price Contract Price (in words) 4.2 Included in the Agreement Sum is an allowance account of for the Base Bid Form for unforeseen conditions, potential construction changes and quantity adjustments, and additional work or materials that the City may deem necessary if ordered and authorized by the City Manager in accordance with the Contract Documents. Money may only be taken from this account at the prior approval of the CONSULTANT and pursuant to any procedures outlined by the City Manager. Article S. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by CONSULTANT as provided in the General Conditions. 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Applications for Payment as recommended by CONSULTANT, on or before the 28th day of each month during construction as provided below. The Application for Payment shall be in AIA format or other City approved format. All progress payments will be on the basis of the progress of the Work measured by the Schedule of Values provided within 10 days of Notice of Award as required under Article 14 of the General Conditions. 5.1.1 Prior to Substantial Completion, progress payments will be in an amount equal to: 90% of the Work completed and 90% of materials and equipment not incorporated in the Work but delivered and suitably stored, less in each case the aggregate of payments previously made. 5.1.2 Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as CONSULTANT shall determine in accordance Article 14 of the General Conditions. 13 5.2. FINAL PAYMENT. Upon Final Completion and acceptance of the Work in accordance with paragraph 14.07.13.1 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by CONSULTANT as provided in Article 14 of the General Conditions. Article 6. INTEREST. Not Applicable Article 7. CONTRACTOR'S REPRESENTATIONS. 7.1. In order to induce OWNER to enter into the Contract, CONTRACTOR makes the following representations: CONTRACTOR has thoroughly and to its full satisfaction familiarized himself with the nature and extent of the Contract Documents, Work, locality, and with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress or performance of the Work. CONTRACTOR has: (a) examined the Contract Documents, Project Specifications and Drawings thoroughly to its full satisfaction and has undertaken the responsibility to determine, within the scope of CONTRACTOR's competence as a licensed General Contractor, that the Project Specifications and Drawings are fit and proper for the performance of the Work and to the best of CONTRACTOR's knowledge are: (i) free from material errors, omissions, and /or inconsistencies; and (ii) are in compliance with applicable laws, statutes, building codes, ordinances, rules and regulations, recognizing however, that CONTRACTOR is not responsible for the design of the Project; (b) visited the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work; (c) examined the Project Site to its full satisfaction, including any existing work or improvements in place, and has determined that the same are fit and proper to receive the Work in their present condition and CONTRACTOR waives all claims that same are not in accordance with all data and information with respect to the Project as specified in the Drawings and Project Specifications and /or as provided by OWNER and CONSULTANT; (d) familiarized himself with federal, state and local laws, ordinances, rules, policies, and regulations that may in any manner affect cost, progress or performance of the Work; (e) studied and carefully correlated CONTRACTOR's observations with the Contract Documents; and (f) at CONTRACTOR's own expense, made or obtained any additional examinations, investigations, explorations, tests and studies, and obtained any additional information and data which pertain to the physical conditions (surface, sub - surface and underground facilities) at or contiguous to the Project or otherwise which may affect cost, progress, performance or furnishing of the Work and which CONTRACTOR deems necessary to determine its Contract Price for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents. 7.2. CONTRACTOR has studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Work which were relied upon by CONSULTANT in the preparation of the Drawings and Specifications. 7.3. CONTRACTOR has made or caused to be made examinations, investigations and tests and studies of such reports and related data in addition to those referred to in paragraph 7.2 as he deems necessary for the performance of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, tests, reports or similar data are or will be required by CONTRACTOR for such purposes. 7.4. CONTRACTOR has correlated and considered the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents and in reaching the Contract Price and Contract Time. 14 7.5. CONTRACTOR has given CONSULTANT written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by CONSULTANT is acceptable to CONTRACTOR. CONTRACTOR shall not rely on any conflicts, errors or discrepancies that CONTRACTOR knew or should have known exist in the Contract Documents as a basis for a claim for an extra to the Contract Price or Contract Time. Article 8. CONTRACT DOCUMENTS. The Contract Documents that comprise the entire Contract between OWNER and CONTRACTOR are attached to this Contract, made a part hereof and consist of the items listed in the general conditions and the following: 8.1. This Contract 8.2. Request for Proposal 8.3. Bid Form 8.4. Standard General Conditions 8.5. Supplementary Conditions (if applicable) 8.6. Detailed Specifications as included in this package and as referenced 8.7. Cone of Silence /Campaign Contribution Ordinance /Lobbyist Registration Requirements 8.8. Addendum Acknowledgement 8.9. Anti- Kickback Affidavit 8.10. Non - Collusive Affidavit 8.11. Sworn Statement 8.12. Qualification Statement 8.13. Performance Bond 8.14. Payment Bond 8.15. Drug -Free Work Place Form 8.16. Related Transaction Verification Form 8.17. Acknowledgement of Conformance with OSHA Standards 8.18. Construction Plans titled — "DANTE FASCELL PARK PIP JOGGING TRAIL" 8.19. Compliance with Federal, State and Local Codes 8.20. Any Modifications, including Work Authorizations, duly delivered after execution of the Contract. There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be altered, amended or repealed by a Modification (as defined in Section 1 of the General Conditions). Article 9. MISCELLANEOUS 9.1. Terms used in this Contract which are defined in Article 1 of the General Conditions shall have the meanings indicated in the General Conditions. 15 9.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.3. OWNER and CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other party hereto, his partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 9.4. This Contract may be executed in counterparts. 9.5 The OWNER shall retain the ownership of all shop drawings and design drawings once payment therefore is made. 9.6 OWNER and CONTRACTOR hereby knowingly, irrevocably, voluntarily and intentionally waive any right either may have to a trial by jury in respect to any action or proceeding based upon the contract documents or arising out of, under, or in connection with the work or the project. 9.7 The law of the State of Florida shall govern the contract between the City of South Miami and the successful bidder and any action shall be brought in Miami -Dade County, Florida. In the event of litigation to settle issues arising hereunder, the prevailing party in such litigation shall be entitled to recover against the other party its costs and expenses, including reasonable attorney fees, which shall include any fees and costs attributable to appellate proceedings arising on and of such litigation. 918 INDEMNIFICATION. The parties agree that 1% of the total compensation paid to the Contractor for the performance of this agreement shall represent the specific consideration for the Contractor's indemnification of the City as set forth in this Section and in the Terms and Conditions. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless the City and their consultants, agents and employees from and against all claims, damages, losses and expenses, direct, indirect or consequential (including but not limited to fees and charges of attorneys and other professionals and court costs) arising out of or resulting from the performance of the work, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting there from and (b) is caused in whole or in part by any willful and wanton or negligent or gross negligent acts or omission of Contractor, any subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder or arises by or is imposed by Law and Regulations regardless of the negligence of any such party. In any and all claims against the City or any of their consultants, agents or employees by any employee of Contractor, any Subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the work or anyone for whose acts any of them may be liable, the indemnification obligation under the above paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any such Subcontractor or other person or organization under workers or workman's compensation acts, disability benefit acts or other employee benefit acts. 16 It is the specific intent of the parties hereto that the foregoing indemnification complies with Florida Statute 725.06 (Chapter 725). It is further the specific intent and agreement of the parties that all of the Contract Documents on this project are hereby amended to include the foregoing indemnification and the "Specific Consideration" therefore. The official title of the City is "CITY OF SOUTH MIAMI ". This official title shall be used in all insurance, or other legal documentation. City of South Miami is to be included as "Additional Insured" with respect to liability arising out of operations performed for City of South Miami by or on behalf of Contractor or acts or omissions of Contractor in connection with such operation. 9.9 WARRANTIES OF CONTRACTOR. The CONTRACTOR hereby warrants and represents that at all times during the term of this Agreement it shall maintain in good standing all required licenses, certifications and permits required under Federal, State and local laws necessary to perform the Specified Services. 9.10 DEFAULT /FAILURE TO PERFORM. The City shall be the sole judge of nonperformance, which shall include any failure on the part of the successful bidder to accept the award, to furnish required documents, and /or to fulfill any portion of this contract within the time stipulated. Upon default by the successful bidder to meet any terms of this agreement, the City will notify the bidder three (3) days (weekends and holidays excluded) to remedy the default. Failure on the contractor's part to correct the default within the required three (3) days shall result in the contract being terminated and upon the City notifying in writing the contractor of its intentions and the effective date of the termination. The following shall constitute default: A) Failure to perform the work required under the contract and /or within the time required or failing to use the subcontractors, entities and personnel as identified and set forth, and to the degree specified in the contract. B) Failure to begin the work under this contract within the time specified. C) Failure to perform the work with sufficient workers and equipment or with sufficient materials to ensure timely completion. D) Neglecting or refusing to remove materials or perform new work where prior work has been rejected as non conforming with the terms of the contract. E) Becoming insolvent, being declared bankrupt, or committing act of bankruptcy or insolvency, or making an assignment renders the successful bidder incapable of performing the work in accordance with and as required by the contract. F) Failure to comply with any of the terms of the contract in any material respect. In the event of litigation or arbitration arising from a default by the contractor, the contractor shall also be liable for all damages caused by its default which damages may include but not be limited to any and all costs incurred by the City in completing the project, and damages arising out of the contractor's failure to adhere to the contract requirements and all attorney's fees and costs incurred by the City in seeking legal relief for the default. 9.11 OTHER CAUSES FOR TERMINATION. The CITY OF SOUTH MIAMI reserves the right to cancel this contract by written notice to the contractor effective the date specified in the notice should any of the following apply: A) The City has determined that such cancellation will be in the best interest of the City to cancel the contract for its own convenience. In the event the contract is terminated for the City's 17 SECTION 4 BIDDER'S REPRESENTATION Proposal of (Name) to furnish all materials; equipment, and labor and to perform all work in accordance with the Contract Documents for: "DANTE FASCELL PARK (PIP) JOGGING TRAIL PROJECT" ( "THE PROJECT ") TO: CITY OF SOUTH MIAMI Attn: City Clerk 6139 Sunset Drive South Miami, Florida 33143 The undersigned, as Bidder, hereby declares that the only person or persons interested in the Bid, as principal or principals, is or are named herein and that no other person than herein mentioned has any interests in the Bid of the Agreement to which the Work pertains; that this Bid is made without connection or arrangement with any other person, company, or parties making Bids or Proposals and that the Bid is in all respects fair and made in good faith without collusion or fraud. The Bidder further declares that he or she has examined the geographic location and sites of the Work; that he has made sufficient investigations to fully satisfy himself that such sites are suitable for this Work; and he assumes full responsibility therefore; that he has examined the specifications for the Work and from his own experience or from professional advice that the specifications are sufficient for the Work to be done and he has examined the other Contract Documents relating thereto, including the Instructions to Bidders, the Agreement, Bid, Detailed Scope of Work /Specifications, Qualification Statement, Public Entity Crime Form, and Insurance requirements and he has read all addenda prior to the opening of Bids, and that he has satisfied himself fully, relative to all matters and conditions with respect to the Work to which this Bid pertains. The Bidder proposes and agrees, if this Bid is accepted, to timely execute the Agreement with the City in the form attached and to furnish all necessary materials, all equipment, all necessary machinery, tools, apparatus, means of transportation, and labor necessary to complete the Work specified in the Bid and the Agreement, and called for by the specifications and in the manner specified and to timely submit all required bonds and insurance certificates. NOTE, THIS SCHEDULE OF BID ITEMS IS MERELY ILLUSTRATIVE OF THE MINIMUM AMOUNT /QUANTITY OF WORK TO BE PERFORMED UNDER THE CONTRACT. IN THE CASE OF ANY CONFLICT BETWEEN THIS 19 convenience the contractor will be paid for all labor and materials provided as of the termination date. No consideration will be given for anticipated lost revenue, overhead, mobilization or demobilization or the canceled portions of the contract. B) Funds are not available to cover the cost of the services. The City's obligation is contingent upon the availability of appropriate funds. 9.12 ANTI - DISCRIMINATION. The bidder certifies compliance with the non - discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin. Furthermore the bidder shall comply with all other State and local laws and policies that prohibit discrimination. 9.13 If any provision of this Contract or any Authorization under this Contract or the application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of the is Contract, and the application of such provisions to persons or situations other than those as to which it shall have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest extent permitted by law. 9.14 Whenever either party desires to give notice to the other, it must be given by hand delivery or written notice, sent by certified United States mail, with return receipt requested or a nationally recognized private mail delivery service, addressed to the party for whom it is intended, at the place last specified. 9.15 Contractor shall abide by the applicable provisions of Chapter 119, Florida Statutes (Public Records). IN WITNESS WHEREOF, the parties hereto have signed 6 copies of this Contract. At least one counterpart each has been delivered to OWNER, CONTRACTOR, and CONSULTANT. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or by CONSULTANTon OWNER'S behalf. OWNER CITY OF SOUTH MIAMI ADDRESS 6130 Sunset Drive South Miami, Florida 33143 M, Steven Alexander, City Manager WITNESS [CORPORATE SEAL] CONTRACTOR ADDRESS STREET CITY, STATE & ZIP CODE BY: TITLE - COMPANY WITNESS [CORPORATE SEAL] [END OF SECTION] 18 SECTION 6 SPECIFICATIONS /SCOPE OF WORK Contractor shall provide all labor, parts, materials, and equipment necessary for the installation of EPDM /Poured- in -Place (PIP) playground surface/ jogging trail at the City of South Miami's Dante Fascell Park. (Refer to Exhibit #1 'Aerial View, Dante Fascell Park." The Exhibit depicts the suggested route and placement of the jogging trail. 1. Material and Workmanship • Material and workmanship shall comply with the following: • Performance requirements for impact attenuation and Head Injury Criteria as per U.S. Consumer Product Safety Commission. • Adjust thickness to meet varying critical fall heights within the repair areas of the jogging trail. Minimum 1/2" to maximum 5/8" as per line items. • Surface shall consist of two layers. The base coat is recycled tire 100% wire free and a minimum of 1/2" EPDM rubber installed on compacted crusted stone, concrete or asphalt. Color mixture of the EPDM wear cap shall be 50% Standard color/ 50% Black. • Mix proportions by weight - o Basemat 14% polyurethane 86% rubber. • Top Surface 18% polyurethane, 82% rubber. 2. Dimensions of Jogging Trail Note: Dimensions are approximate and are provided for planning purposes only and should not be considered as a firm commitment. Contractor shall be responsible for exact measurements. The jogging trail shall, at a minimum, consist of 2" thick PIP rubber material and, is approximately 1,375 ft long and 6' wide. Contractor shall be responsible to: • Clear and grub area for the jogging trail. • Grade and compact subgrade to allow for the installation of 4" of limerock. • Install 4" limerock base and compact as required. • Install 2" thick rubber surface. Upon completion of the project, a final inspection shall be made by the Contract Administrator or a City designee. 3. COMPLIANCE WITH FEDERAL, STATE AND LOCAL LAWS AND CODES 23 SCHEDULE OF BID ITEMS AND THE DETAILED SPECIFICATIONS, THE DETAILED SPECIFICATIONS WILL PREVAIL. The Bidder further proposes and agrees to comply in all respects with the time limits for commencement and completion of the Work as stated in the Agreement. The Bidder agrees to execute the Agreement and furnish the executed Agreement, all required bonds, insurance certificates, and other required information to City within ten (10) ten calendar days after written notice of the Award of contract. Failure on the part of the Bidder to timely comply with this provision shall give City all rights and remedies set forth in the Instructions to Bidders. The undersigned agrees to accept as full compensation therefore the total of the lump sum prices and extended unit prices items named in the following schedule. It is understood that the unit prices quoted or established for a particular item are to be used for computing the amount to be paid to the Contractor, based on the Work actually performed as determined by the Agreement and the City. However, in utilizing the schedule, the Bidder agrees that in no event shall compensation paid to the Bidder under the Agreement exceed the dollar amount of the Bidder's Bid amount, asset forth in the attached Bid. It is intended that all Work to be performed under this Bid shall commence approximately thirty (30) days after Agreement execution. In no event shall City be obligated to pay � for Work not performed or materials not furnished. Bidder's Certificate of Competency NoUyr\ Bidder's Occupational License N WI NESS: CB ' �y S nature q Lhorized Agent [SEAL] 20 SECTION 5 [SPACE LEFT INTENTIONALLY BLANK] [END OF SECTION] 22 BID FORM The following is a Lump Sum Bid Proposal is presented to the City. The Bid Amounts includes all items described in the Bid Documents (Detailed Specifications). Upon receiving a Notice of Award contractor shall submit a detail schedule of Values. Payment shall be made on the basis of Work actually performed and completed. The Base Bid Amount includes all material and labor for the construction of the project entitled "DANTE FASCELL PARK (PIP) JOGGING TRAIL PROJECT." LUMP SUM BASE BIDAMOUNT $ tS lc- t LUMP SUM BASE BID AMOUNT (IN WORDS)0 1 \ `t."f- C(C as '� �, j �,\X� -, Taxpayer Identification ►1, (Company Name) ature of Authorized (Printed Name and Title) � y r <7 3 (Company Address )\ p v 1 (Company Phone Number) [END OF SECTION] 21 Contractor must strictly comply with Federal, State and local building safety codes. Must meet all State and Federal safety regulations. Certified Test Data that's safety Surfacing meets or exceeds the following: A. American Society for Testing and Materials (ASTM): ASTM -F1292 Standards- Method for Testing various surfacing materials to determine their "critical height" (the fall height below which a life threatening head injury would not be expected to occur). Copies may be obtained from: American Society for Testing Materials 100 Barr Harbor Drive West Conshohocken, PA 19428 B. Consumer Product Safety Commission (CPSC) - Printed Handbook for Public Playground Safety (Latest edition). Copies may be obtained from: US Consumer Product Safety Commission 4330 East West Highway Bethesda, MD 20814 (301) 504 -4973 C. National Playground Safety Institute (NPSI)- identification of 12 leading causes of injuries on playgrounds. Copies may be obtained from: National Recreation and Park Association 22377 Belmont Ridge Road Ashburn, VA 20148 -4150 D. Current Americans with Disabilities Act Guidelines (ADAG). Contractors certify that all products (materials, equipment, processes, age appropriate signage, or other items supplied in response to this bid) contained in its bid meet all Federal and State requirements, upon completion of installation of playground surfacing, contractor shall furnish the City of South Miami a certificate so stating the surfacing and its installation meet Federal and State requirements as outlined in the publications. 4. CLEAN -UP Contractor shall: A. Be responsible for protection of finished surfaces until completion of construction and sign off. B. Not leave adhesive on adjacent surface or play equipment. Spills of excess adhesive shall be promptly cleaned. C. Properly dispose of all material and packing waste before leaving the job site. D. Be responsible for supplying a dumpster at job site for all waste associated with installation of the safety surface. All removal and disposal fees are to be included as part of the rate per square foot as bid. [END OF SECTION) 24 SECTION 7 ALLOWANCES [SPACE LEFT INTENTIONALLY BLANK] 25 SECTION 8 ADDENDUM ACKNOWLEDGEMENT FORM Addendum NDate Received i (Printed Name & Title) [END OF SECTION] 26 STATE OF FLORIDA SS: COUNTY OF MIAMI -DADE SECTION 9 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn, depose and say that no port to any employees of the CITY OF SOUTH MIAMI, its elected officials, and A its design consultants, as a commission, kickback, reward or gift, directly or firm or by an officer of the corporation. Sworn and subscribed before this dayofi UTAI 2013 Notary Public, State of Flo (Printed Name) My commission expires:2l ` \ Mary f bft SP3to of Florida Tamara L 01912 My Cawwlislan EE023501 Expltes 0910912014 [END OF SECTION] 27 n herein bid will be paid or me or any member of my SECTION 10 NON- COLLUSIVE AFFIDAVIT State of `v'c } } SS: County of, ) LKZ(mo %n�wf ' Q -C(} -- being first duly sworn, deposes and says that: a) He /she is the rE C (Owner, Partner, Officer, Representative or Agent) — ` the Bidder that has submitted the attached Proposal; b) He /she is fully informed respecting the preparation and contents of the attached Proposal and of all pertinent circumstances respecting such Proposal; c) Such Proposal is genuine and is not collusive or a sham Proposal; d) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Proposal in connection with the Work for which the attached Proposal has been submitted; or to refrain from proposing in connection with such work; or have in any manner, directly or indirectly, sought by person to fix the price or prices in the attached Proposal or of any other Bidder, or to fix any overhead, profit, or cost elements of the Proposal price or the Proposal price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed work; e) The price or prices quoted in the attached Proposal are fair and proper and/are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of th Bidder q f any other of its agents, representatives, owners, employees or parties in interest, including this ally nj. I gned, sealed and delivered the presen e of: 3 art - By Witness `v ) 1 Witness r \ (Pripted fame) State of `�'O\Of � Vc _ ) SS; Count of ) (Title) Y (� BEFORE ME, the undersigned authority, personally appeared car ot\- 0'< _ to me well known and known by me to be the person cl spribed erein and who executed the foregoing Affidavit and acknowledged to and before me that � (,cxy ) � ZA, Z executed said Affidavit for the purpose therein expressed. } WITNESS, my hand and o icial seal this day of V `G� My Commissi n Expires: ° °x °,� o84 Notary Public State of Florida a Lar e ' oFr °` [END OF SEC 28 \1_,2013. Mlotary Public r State of Florida Tamara L Ortiz My Commission EE023581 Expires 0910912.014 SECTION 11 SWORN STATEMENT ON PUBLIC ENTITY CRIMES SECTION 287.133(3)(a), FLORIDA STATUTES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to the_CITY OF SOUTH MIAMI by for whose business address is [print individual's name and [print name of entity submitting sworn statement] 3,4 and (if applicable) its Federal Employer Identification Number (FEIN) isC`1} 1,Cp #t i (If the entity has no FEIN, include the Social Security Number of the individual signing this sworn statement: M "' 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)98), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or the United States, including, but not limited to, any bid or contract for goods and services to be provided to any public entity or an agency or political subdivision of any other state or of the United States involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation, 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction or a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contendere. 4. 1 understand than an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person 29 controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. 1 understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an entity. 6. Based on information and belief, the statement that I have marked below is true in relation to the entity submitting this sworn statement. [Indicate which statement applies.] Neither the entity submitting this sworn statement, nor any officers, directors, executives, partners, sharehold rs, employees, members, or agents who are active in the management of the entity, not any affiliate of the entity, has been charged with and convicted of a public entity crime subsequent to July 1, 1989. This entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. [attach a copy of the final order] I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND HAT 1 AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA �TATUT FOR CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. / Signature ofXntit jSubmitting Sworn Statement Sworn to and subscribed before me this, day of M , , 2013. Personally known � e,h2(mo l '`y�Tl` L' L n OR produced id tification Notary Public — Stat G -' '' oa°'Y Pae� Notary Public SfAla pi Florida 30 � ': Tamara I. Urtiz '� � � o° My Commission e�p$3k61 �` or r�ae` Expire! g01g6 /ggY4 (type of identification) t rtiYl�.— My commission ez ' es (Printed, typed or stamped Commissioned N [END OF SECTION] 31 Notary Public State of Florida Tamara L Ortiz e v -Cl laalon EE0235BI SECTION 12 SUPPLEMENT TO BID /TENDER FORM THIS FORM MUST BE SUBMITTED WITH BID FOR BID TO BE DEEMED RESPONSIVE. QUALIFICATION STATEMENT The undersigned guarantees the truth and accuracy of all statements and the answers contained herein. 1. Please describe your company in detail. i> Q- C'E 2. The address of the principal) place of business is: 3. Company telephone number: 4. Number of employees: Y7�� 5. Number of employees assigned to this project: I 6. Company Identification numbers for the Internal Revenue Service: 7. Miami -Dade County and CITY OF SOUTH MIAMI Occupational License Number, if applicable, and expiration date. lS)C u5 '� -_, ({ Y e a 9 � �° ) 32 8. How many years has your organization been in business? 9. What similar engagements is your company presently working on? \ c G.c mil \ \ 'N' c 10. Have you ever failed to complete any work awarded to you? If so, where and why? C'(D 11. Give names, addresses and telephone numbers of three individuals, corporations, agencies, or institutions for which you have performed similar work both in scope and cost: 1.�(name) (address) (phone #) r- \ 12 S �i - K c `, (name) (address) (phone #) - <CUf\i ;`r' W (name) (address) (phone #) 12. List the following information concerning all contracts in progress as of the date of submission of this bid. (In case of co- venture, list the information for all co- ventures.) NAMEOF PROJECT OWNER TOTAL CONTRACT VALUE CONTRACTED DATE OF COMPLETION PERCENT OF COMPLETION TO DATE (Continue list on insert sheet, if necessary.) 33 13. Has the Bidder or his or her representative inspected the proposed project and does the Bidder have a complete plan for its performance? '�' �-Q -' 14. Will you subcontract any part of this work? If so, include a list of subcontractors and task performed by each subcontractor. The foregoing list of subcontractor(s) may not be amended after award of the contract without the prior written approval of the Contract Administrator, whose approval shall not be unreasonably withheld. 15. What equipment do you own that is \available for the work ?? 16. What equipment will you purchase for the proposed work? 17, What equipment will you rent for the proposed work? 18. State the name of your proposed project manager and give details of his or her qualifications and experience in managing similar work. r' C\tvck (-Q,—, ` R_� R �, ttc �, ��, QD'\ t` 19. State the true, exact, correct and complete name of the partnership, corporation or trade name under which you do business and the address of the place of business. (If a corporation, state the name of the president and secretary. If a partnership, state the names of all partners. If a trade name, state the names of the individuals who do business under the trade name.) 19.1 The correct name of the Bidder is: 19.2. The business is (Sole Proprietorship) (Partnership) (Corporation). 19.3. The names of the corporate officers, or partners, or individuals doing business under a trade name, are as follows: �Vr\ 19.4. List all organizations which were predecessors to Bidder or in which the principals or officers of the Bidder were principals or officers. �,)trA 19.5. List and describe all bankruptcy petitions (voluntary or involuntary) which have been filed by or against the Bidder, its parent or subsidiaries or predecessor organizations during the past five (5) years. Include in the description the disposition of each such petition. OV\ 19.6. List and describe all successful Bid, Performance or Payment Bond claims made to your surety(ies) during the last five (5) years. The list and descriptions should include claims against the bond of the Bidder and its predecessor organization(s). 35 19.7. List all claims, arbitrations, administrative hearings and lawsuits brought by or against the Bidder or its predecessor organization(s) during the last five (5) years. The list shall include all case names; case, arbitration or hearing identification numbers; the name of the project over which the dispute arose; and a description of the subject matter of the dispute. STATE OF FLORIDA ) )SS. COUNTY OF RDE ) T e forego ng instrument was acknowledged before me this day of 2013, by who is erp sonally _known to me or wh has produced as identification and who VW -4 not take an oath. WITNESS my hand and official seal, this V6 day of ` W 2013. a00gr "�q, NGfery t'uGhC t3(:rte pf G'IptlAu 'C4}ItYnnl � tJrili �nrr.��xp� €eOGilUgtk @iatl 5861 [NOTARY SEAL] (Signature of person [END OF SECTION] 36 Jarrod Pike, Construction Manager Jarrod has worked in the construction industry since 1997. He has experience in both residential and commercial projects as a construction manager. Starting in North Carolina, Jarrod managed construction projects for many multifamily dwellings and municipalities in the area. Since in Florida, he has worked as a crew member and has managed many commercial projects that included site work, foundation work and structural erection. Jarrod has 9 years of experience quoting and managing residential, commercial and government projects and has volunteered his leadership to city and local charity playground projects. Projects: Health First, Viera Hospital Valued at $375,000 As a Subcontractor, managed the site work to include grading, Irrigation, landscaping and lighting. Worked in conjunction with Bovis General Contractors and PAVCO to complete job on time without incident. Completed 2011. Vero Beach Elementary Valued at $165,000 As Construction Manager, coordinated operations on relocating and installing playgrounds and creating a safe environment in a public school setting. Worked with the School Board of Indian River County and Proctor Construction to complete project in a timely manner with no incident. Completed 2012. Slomin Family Center Valued at $55,000 As Construction Manager, worked with the architects of Ocampo & Associates and owner to create an interpretive nature trail for children's autistic learning center. Worked closely with all parties involved to remedy adverse site conditions and provide an aesthetically pleasing and functioning area. Project completed ahead of schedule in 2012. Health First Child Development Center Valued at $130,000 As Construction Manager, involved in planning and fulfillment of installation of four playground environments. Each playground to be completed on different schedules and to be done without any disruption to child careactivities. Project currently in Progress SECTION 13 PERFORMANCE BOND PROJECT TITLE: " DANTE FASCELL PARK (PIP) JOGGING TRAIL PROJECT." (the "Project ") CONTRACTOR: CONTRACT NO: CONTRACT DATED: STATE OF COUNTY OF KNOW ALL MEN BY THESE PRESENTS: That by this Bond, we, of the City of County of , and State of , as Principal, and , authorized, licensed and admitted to do business under the laws of the State of Florida to act as Surety on bonds, as Surety, are held and firmly bound unto The CITY OF SOUTH MIAMI, as Obligee, in the penal sum of Dollars ($ ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with Obligee, dated the _ day of 2013, for the construction of the Public Works Improvements (the "Contract "), which Agreement is by reference made a part of this Bond. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION, IS SUCH THAT, if the said Principal shall faithfully perform said Agreement and shall in all respects fully and faithfully observe and perform all and singular the covenants, conditions, warranties and agreements in and by said Agreement agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Agreement, then this obligation shall be void; otherwise it shall remain in full force and effect. Whenever Principal shall be declared by Obligee to be in default under the Agreement, Obligee having performed Obligee's obligations thereunder, the Surety shall promptly remedy the default, or shall promptly: (1) Complete the Agreement in accordance with its terms and conditions; or (2) Obtain a bid or bids for completion of the Agreement in accordance with its terms and conditions and upon determination by Surety of the lowest responsive, responsible bidder, or, if Obligee elects, upon determination by Obligee and the Surety jointly of the lowest responsive, responsible bidder, arrange for a contract between such bidder and Surety for completion of the Agreement in accordance with its terms and conditions, and make available as work progresses (even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract price; but not exceeding the amounts set forth in the first paragraph hereof. The term "balance of the Contract price" as used in this Bond, shall mean the total amount payable by Obligee to Principal under the Agreement and amendments thereto, less the amount paid by Obligee to Principal and less amounts withheld by Obligee pursuant to its rights under the Contract. 37 Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder and further agrees to all of the terms contained in the Agreement. No right of action shall accrue on this Bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, successors, executors or administrators of the Obligee. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this_ day of , 2013. Principal (Print) Address: Witness: Surety Nam Address: The name and address of the Resident Agent for service of process on Surety is: Nam [END OF SECTION] 38 (Print) PROJECT TITLE: CONTRACTOR: AGREEMENT NO: STATE OF COUNTY OF SECTION 14 PAYMENT BOND DANTE FASCELL PARK PIP JOGGING TRAIL the "Project" BY THIS BOND (the "Bond "), We as AGREEMENT DATED: called CONTRACTOR, and hereinafter called SURETY, are bound to CITY OF SOUTH MIAMI, FLORIDA, a Florida municipal corporation, hereinafter called City, in the amount of Dollars for payment of which CONTRACTOR and SURETY bind themselves, their heirs, personal representatives, executors, administrators, successors and assigns, jointly and severally, with reference to a written Agreement entered into by CONTRACTOR and City, for the following: Agreement Title: DANTE FASCELL PARK PIP JOGGING TRAIL (the "Project') THE CONDITION OF THIS BOND is that if the CONTRACTOR: Promptly makes payments to all claimants as defined in Section 255.05(1), Florida Statutes, supplying CONTRACTOR with labor, material, or supplies, used directly or indirectly by CONTRACTOR in the prosecution of the work provided for in the Agreement; THEN THIS BOND IS VOID, OTHERWISE, IT REMAINS IN FULL FORCE. Any changes in or under the Contract Documents and compliance or noncompliance with formalities, connected with the Agreement or with the changes, do not affect Surety's obligation under this bond. Surety hereby waives notice of any alteration or extension of time made by the City. Claimants must comply with notice requirements set forth in Section 255.05(2), Florida Statutes. No action shall be instituted against the CONTRACTOR or Surety under this bond after one (1) year from the performance of the labor or completion of the delivery of the materials or supplies. IN WITNESS WHEREOF, this instrument is executed this the day of 2013. WHEN THE PRINCIPAL IS AN INDIVIDUAL: Signed, sealed and delivered in the presence of: 39 (Witness) (Witness) (Individual Principal) Business Address WHEN THE PRINCIPAL OPERATES UNDER A TRADE NAME: Signed, sealed and delivered in the presence of: (Witness) (Witness) WHEN A PARTNERSHIP: Signed, sealed and delivered in the presence of: (Witness) (Witness) WHEN THE PRINCIPAL IS A CORPORATION: ATTEST: [Corporate Seal] Secretary ATTEST: [Surety Seal] Business Name and Address By: Signature of Individual Name ana Aacress or Partnersnlp (Partner) (Corporate PRINCIPAL Name) Business Address Bv: President (Corporate SURETY) Business Address 40 By: (Secretary) (Surety) Florida Resident Agent ATTORNEY -IN -FACT (Type) NOTE 1: Surety shall provide evidence of signature authority, i.e., a certified copy of Power of Attorney NOTE 2: If both the Principal and Surety are Corporations, the respective Corporate Seals shall be affixed and attached IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Florida. ATTACH a certified copy of Power -of- Attorney appointing individual Attorney -in -Fact for execution of Performance Bond on behalf of Surety. The Performance Bond and the Statutory Payment Bond and the covered amounts of each are separate and distinct from each other. [SPACE LEFT INTENTIONALLY BLANK] [END OF SECTION] 41 SECTION 15 DRUG -FREE WORKPLACE FORM ndersigned ve dor in accordance with Section 287.087, Florida Statutes, hereby certifies that kt N rn px rye 5 7 pry does: ( Aie of Business) 1) Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2) Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug -free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1). 4) In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. 5) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. 6) Make a good faith efff rt to continue to maintain a drug -free workplace through implementation of this sect!on. As the person auto4rized1to,�ign the statement, I certify that this firm complies fully with the above requirements. roposers [END OF SECTION] 42 [� N Date SECTION 16 RELATED PARTY TRANSACTION VERIFICATION FORM individually and on behalf of have read the Nity of South Miami ( "City ")'s Code of Ethics, Section 8A -1 of the City's Code of Ordinances and I hereby certify, under penalty of perjury that to the best of my knowledge, information and belief: (1) neither I nor the Firm have any conflict of interest (as defined in section 8A -1) with regard to the contract or business that 1, and /or the firm, am(are) about to perform for, orto transact with, the City, and (2) neither I nor any employees, officers, directors of the Firm, nor anyone who has a financial interest greater than 5% in the Firm, has any relative(s), as defined in section 8A -1, who is an employee of the City or who is(are) an appointed or elected official of the City, or who is(are) a member of any public body created by the City Commission, i.e., a board or committee of the City, and (3) neither I nor the Firm, nor anyone who has a financial interest greater than 5% in the Firm, nor any member of those persons' immediate family (i.e., spouse, parents, children, brothers and sisters) has transacted or entered into any contract(s) with the City or has a financial interest, direct or indirect, in any business being transacted with the city, or with any person or agency acting for the city, other than as follows: (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). (4) no elected and /or appointed official or employee of the City of Miami, or any of their immediate family members (i.e., spouse, parents, children, brothers and sisters) has a financially interest, directly or indirectly, in the contract between you and /or your Firm and the City other than the following individuals whose interest is set forth following their names: (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). The names of all City employees and that of all elected and /or appointed city officials or board members, who own, directly or indirectly, an interest of five percent (5 %) or more of the total assets of capital stock in the firm areas follows: -- (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). (5) 1 and the Firm further agree not to use or attempt to use any knowledge, property or resource which may come to us through our position of trust, or through our performance of our duties under the terms of the contract with the City, to secure a special privilege, benefit, or exemption for ourselves, or others. We agree that we may not disclose or use information, not available to members of the general public, for our personal gain or benefit or for the personal gain or benefit of any other person or business entity, outside of the normal gain or benefit anticipated through the performance of the contract. (6) 1 and the Firm hereby acknowledge that we have not contracted or transacted any business with the City or any person or agency acting for the City, and that we have not appeared in representation of any third party before any board, commission or agency of the City within the past two years other than as follows: (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). Neither I nor any 43 employees, officers, or directors of the Firm, nor any of their immediate family (i.e., as a spouse, son, daughter, parent, brother or sister) is related by blood or marriage to: (i) any member of the City Commission; (ii) any city employee; or (iii) any member of any board or agency of the City other than as follows: (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). (7) No Other Firm, nor any officers or directors of that Other Firm or anyone who has a financial interest greater than 5% in that Other Firm, nor any member of those persons' immediate family (i.e., spouse, parents, children, brothers and sisters) nor any of my immediate family members (hereinafter referred to as "Related Parties ") has responded to a solicitation by the City in which I or the Firm that I represent or anyone who has a financial interest greater than 5% in the Firm, or any member of those persons' immediate family (Le, spouse, parents, children, brothers and sisters) have also responded, other than the following: (use a separate sheet to supply additional information that will not fit on this line but make reference to the additional sheet which must be signed under oath). (8) 1 and the Firm agree that we are obligated to supplement this Verification Form and inform the City of any change in circumstances that would change our answers to this document. Specifically, afterthe opening of any responses to a solicitation, I and the Firm have an obligation to supplementthis Verification Form with the name of all Related Parties who have also responded to the same solicitation and to disclose the relationship of those parties to me and the Firm. (9) A violation of the City's Ethics Code, the giving of any false information or the failure to supplement this Verification Form, may subject me or the Firm to immediate termination of any agreement with the City, and the imposition of the maximum fine a cl'or any penalties allowed by law. Additionally, violations may be considered by and subject to action by the iami -Dade County Commission on Ethics. Under penalty of perjur , I dec are'hat I have made a diligent effort to investigate the matters to which I am attesting ereinabove n tha th statements made hereinabove are true and correct to the best of m g f. Y knowledge, informatio nd el' f. Print Name & Title* —(Nb \V`71 Date:�f ±\ 44 RELATED PARTY TRANSACTION VERIFICATION FORM We; :..1`�- tV�.<'4`a-- y'4_�, (Name of CONTRACTOR), hereby acknowledge and agree that as CONTRACT Rs for the DANTE FASCELL PARK PIP JOGGING TRAIL project as specified have the sole responsibility for compliance with all the requirements of the Federal Occupational Safety and Health Act of 1970, and all State and local safety and health regulations, and agree to indemnify and hold harmless the City and Consultant against any and all liability, claims, damages, losses and expenses they may incur due to the failure of (Sub - consultant's names): to comply with CONTRACTOR n. BY:� xZ arZ X J "Z AGE Name pp Title 45 Witness Section 8A -1 CODE OF ETHIC Sec. 8A -1. - Conflict of interest and code of ethics ordinance.:' (a) Designation. This section shall be designated and known as the "City of South Miami Conflict of Interest and Code of Ethics Ordinance." This section shall be applicable to all city personnel as defined below, and shall also constitute a standard of ethical conduct and behavior for all autonomous personnel, quasi - judicial personnel, advisory personnel and departmental personnel. The provisions of this section shall be applied in a cumulative manner. By way of example, and not as a limitation, subsections (c) and (d) may be applied to the same contract or transaction. (b) Definitions. For the purposes of this section the following definitions shall be effective: (1) The term "commission members" shall refer to the mayor and the members of the city commission. (2) The term "autonomous personnel" shall refer to the members of autonomous authorities, boards and agencies, such as the city community redevelopment agency and the health facilities authority. (3) The term "quasi- judicial personnel" shall refer to the members of the planning board, the environmental review and preservation board, the code enforcement board and such other individuals, boards and agencies of the city as perform quasi - judicial functions. (4) The term "advisory personnel" shall refer to the members of those city advisory boards and agencies whose sole or primary responsibility is to recommend legislation or give advice to the city commission. (5) The term "departmental personnel" shall refer to the city clerk, the city manager, department heads, the city attorney, and all assistants to the city clerk, city manager and city attorney, however titled. (6) The term "employees" shall refer to all other personnel employed by the city. (7) The term "compensation" shall refer to any money, gift, favor, thing of value or financial benefit conferred, or to be conferred, in return for services rendered or to be rendered. (8) The term "controlling financial interest" shall refer to ownership, directly or indirectly, of ten percent or more of the outstanding capital stock in any corporation or a direct or indirect interest of ten percent or more in a firm, partnership, or other business entity at the time of transacting business with the city. (9) The term "immediate family" shall refer to the spouse, parents, children, brothers and sisters of the person involved. (10) The term "transact any business" shall refer to the purchase or sale by the city of specific goods or services for consideration and to submitting a bid, a proposal in response to a RFP, a statement of qualifications in response to a request by the city, or entering into contract negotiations for the provision on any goods or services, whichever first occurs. (c) Prohibition on transacting business with the city. No person included in the terms defined in paragraphs (b)(1) through (6) and in paragraph (b)(9) shall enter into any contract or transact any business 46 in which that person or a member of the immediate family has a financial interest, direct or indirect with the city or any person or agency acting for the city, and any such contract, agreement or business engagement entered in violation of this subsection shall render the transaction voidable. Willful violation of this subsection shall constitute malfeasance in office and shall effect forfeiture of office or position. Nothing in this subsection shall prohibit or make illegal: (1) The payment of taxes, special assessments or fees for services provided by the city government; (2) The purchase of bonds, anticipation notes or other securities that may be issued by the city through underwriters or directly from time to time. Waiver of prohibition. The requirements of this subsection may be waived for a particular transaction only by four affirmative votes of the city commission after public hearing upon finding that: (1) An open -to -all sealed competitive proposal has been submitted by a city person as defined in paragraphs (b)(2), (3) and (4); (2) The proposal has been submitted by a person or firm offering services within the scope of the practice of architecture, professional engineering, or registered land surveying, as defined by the laws of the state and pursuant to the provisions of the Consultants' Competitive Negotiation Act, and when the proposal has been submitted by a city person defined in paragraphs (b)(2), (3) and (4); (3) The property or services to be involved in the proposed transaction are unique and the city cannot avail itself of such property or services without entering a transaction which would violate this subsection but for waiver of its requirements; and (4) That the proposed transaction will be in the best interest of the city. This subsection shall be applicable only to prospective transactions, and the city commission may in no case ratify a transaction entered in violation of this subsection. Provisions cumulative. This subsection shall be taken to be cumulative and shall not be construed to amend or repeal any other law pertaining to the same subject matter. (d) Further prohibition on transacting business with the city. No person included in the terms defined in paragraphs (b)(1) through (6) and in paragraph (b)(9) shall enter into any contract or transact any business through a firm, corporation, partnership or business entity in which that person or any member of the immediate family has a controlling financial interest, direct or indirect, with the city or any person or agency acting for the city, and any such contract, agreement or business engagement entered in violation of this subsection shall render the transaction voidable. The remaining provisions of subsection (c) will also be applicable to this subsection as though incorporated by recitation. Additionally, no person included in the term defined in paragraph (b)(1) shall vote on or participate in any way in any matter presented to the city commission if that person has any of the following relationships with any of the persons or entities which would be or might be directly or indirectly affected by any action of the city commission: (1) Officer, director, partner, of counsel, consultant, employee, fiduciary or beneficiary; or 47 (2) Stockholder, bondholder, debtor, or creditor, if in any instance the transaction or matter would affect the person defined in paragraph (b)(1) in a manner distinct from the manner in which it would affect the public generally. Any person included in the term defined in paragraph (b)(1) who has any of the specified relationships or who would or might, directly or indirectly, realize a profit by the action of the city commission shall not vote on or participate in anyway in the matter. (e) Gifts. (1) Definition. The term "gift" shall refer to the transfer of anything of economic value, whether in the form of money, service, loan, travel, entertainment, hospitality, item or promise, or in any other form, without adequate and lawful consideration. (2) Exceptions. The provisions of paragraph (e)(1) shall not apply to: a. Political contributions specifically authorized by state law; b. Gifts from relatives or members of one's household, unless the person is a conduit on behalf of a third partyto the delivery of a gift that is prohibited under paragraph (3); C. Awards for professional or civic achievement; d. Material such as books, reports, periodicals or pamphlets which are solely informational or of an advertising nature. (3) Prohibitions. A person described in paragraphs (b)(1) through (6) shall neither solicit nor demand any gift. It is also unlawful for any person or entity to offer, give or agree to give to any person included in the terms defined in paragraphs (b)(1) through (6), or for any person included in the terms defined in paragraphs (b)(1) through (6) to accept or agree to accept from another person or entity, any gift for or because of: a. An official public action taken, or to be taken, or which could be taken, or an omission or failure to take a public action; b. A legal duty performed or to be performed, or which could be performed, or an omission or failure to perform a legal duty; C. A legal duty violated or to be violated, or which could be violated by any person included in the term defined in paragraph (b)(1); or d. Attendance or absence from a public meeting at which official action is to be taken. (4) Disclosure. Any person included in the term defined in paragraphs (b)(1) through (6) shall disclose any gift, or series of gifts from any one person or entity, having a value in excess of $25.00. The disclosure shall be made by filing a copy of the disclosure form required by chapter 112, Florida Statutes, for "local officers" with the city clerk simultaneously with the filing of the form with the clerk of the county and with the Florida Secretary of State. (f) Compulsory disclosure by employees of firms doing business with the city. Should any person included in the terms defined in paragraphs (b)(1) through (6) be employed by a corporation, firm, partnership or business entity in which that person or the immediate family does not have a controlling financial interest, and should the corporation, firm, partnership or business entity have substantial business commitments to or from the city or any city agency, or be subject to direct regulation by the city or a city agency, then the person shall file a sworn statement disclosing such employment and interest with the clerk of the city. 48 (g) Exploitation of official position prohibited. No person included in the terms defined in paragraphs (b)(1) through (6) shall corruptly use or attempt to use an official position to secure special privileges or exemptions for that person or others. (h) Prohibition on use of confidential information. No person included in the terms defined in paragraphs (b)(1) through (6) shall accept employment or engage in any business or professional activity which one might reasonably expect would require or induce one to disclose confidential information acquired by reason of an official position, nor shall that person in fact ever disclose confidential information garnered or gained through an official position with the city, nor shall that person ever use such information, directly or indirectly, for personal gain or benefit. (i) Conflicting employment prohibited. No person included in the terms defined in paragraphs (b)(1) through (6) shall accept other employment which would impair independence of judgment in the performance of any public duties. (j) Prohibition on outside employment. (1) No person included in the terms defined in paragraphs (b)(6) shall receive any compensation for services as an officer or employee of the city from any source other than the city, except as may be permitted as follows: a. Generally prohibited. No full -time city employee shall accept outside employment, either incidental, occasional or otherwise, where city time, equipment or material is to be used or where such employment or any part thereof is to be performed on city time. b. When permitted. A full -time city employee may accept incidental or occasional outside employment so long as such employment is not contrary, detrimental or adverse to the interest of the city or any of its departments and the approval required in subparagraph c. is obtained. c. Approval of department head required. Any outside employment by any full - time city employee must first be approved in writing by the employee's department head who shall maintain a complete record of such employment. d. Penalty. Any person convicted of violating any provision of this subsection shall be punished as provided in section 1 -11 of the Code of Miami -Dade County and, in addition shall be subject to dismissal by the appointing authority. The city may also assess against a violator a fine not to exceed $500.00 and the costs of investigation incurred by the city. (2) All full -time city employees engaged in any outside employment for any person, firm, corporation or entity other than the city, or any of its agencies or instrumentalities, shall file, under oath, an annual report indicating the source of the outside employment, the nature of the work being done and any amount of money or other consideration received by the employee from the outside employment. City employee reports shall be filed with the city clerk. The reports shall be available at a reasonable time and place for inspection by the public. The city manager may require monthly reports from individual employees orgroups of employees for good cause. (k) Prohibited investments. No person included in the terms defined in paragraphs (b)(1) through (6) or a member of the immediate family shall have personal investments in any enterprise which will create a substantial conflict between private interests and the public interest. (1) Certain appearances and payment prohibited. 49 (1) No person included in the terms defined in paragraphs (b)(1), (5) and (6) shall appear before any city board or agency and make a presentation on behalf of a third person with respect to any matter, license, contract, certificate, ruling, decision, opinion, rate schedule, franchise, or other benefit sought by the third person. Nor shall the person receive any compensation or gift, directly or indirectly, for services rendered to a third person, who has applied for or is seeking some benefit from the city or a city agency, in connection with the particular benefit sought by the third person. Nor shall the person appear in any court or before any administrative tribunal as counselor legal advisor to a party who seeks legal relief from the city or a city agency through the suit in question. (2) No person included in the terms defined in paragraphs (b)(2), (3) and (4) shall appear before the city commission or agency on which the person serves, either directly or through an associate, and make a presentation on behalf of a third person with respect to any matter, license, contract, certificate, ruling, decision, opinion, rate schedule, franchise, or other benefit sought by the third person. Nor shall such person receive any compensation or gift, directly or indirectly, for services rendered to a third party who has applied for or is seeking some benefit from the city commission or agency on which the person serves in connection with the particular benefit sought by the third party. Nor shall the person appear in any court or before any administrative tribunal as counsel or legal advisor to a third party who seeks legal relief from the city commission or agency on which such person serves through the suit in question. (m) Actions prohibited when financial interests involved. No person included in the terms defined in paragraphs (b)(1) through (6) shall participate in any official action directly or indirectly affecting a business in which that person or any member of the immediate family has financial interest. A financial interest is defined in this subsection to include, but not be limited to, any direct or indirect interest in any investment, equity, or debt. (n) Acquiring financial interests. No person included in the terms defined in paragraphs (b)(1) through (6) shall acquire a financial interest in a project, business entity or property at a time when the person believes or has reason to believe that the financial interest may be directly affected by official actions or by official actions by the city or city agency of which the person is an official, officer or employee. (o) Recommending professional services. No person included in the terms defined in paragraphs (b)(1) through (4) may recommend the services of any lawyer or law firm, architect or architectural firm, public relations firm, or any other person or firm, professional or otherwise, to assist in any transaction involving the city or any of its agencies, provided that a recommendation may properly be made when required to be made by the duties of office and in advance at a public meeting attended by other city officials, officers or employees. (p) Continuing application after city service. (1) No person included in the terms defined in paragraphs (b)(1), (5) and (6) shall, for a period of two years after his or her city service or employment has ceased, lobby any city official [as defined in paragraphs (b)(1) through (6)) in connection with anyjudicial or other proceeding, application, RFP, RFQ, bid, request for ruling or other determination, contract, claim, controversy, charge, accusation, arrest or other particular subject matter 50 in which the city or one of its agencies is a party or has any interest whatever, whether direct or indirect. Nothing contained in this subsection shall prohibit any individual from submitting a routine administrative request or application to a city department or agency during the two -year period after his or her service has ceased. (2) The provisions of the subsection shall not apply to persons who become employed by governmental entities, 501(c)(3) non - profit entities or educational institutions or entities, and who lobby on behalf of those entities in their official capacities. (3) The provisions of this subsection shall apply to all persons described in paragraph (p)(1) whose city service or employment ceased after the effective date of the ordinance from which this section derives. (4) No person described in paragraph (p)(1) whose city service or employment ceased within two years prior to the effective date of this ordinance shall for a period of two years after his or her service or employment enter into a lobbying contract to lobby any city official in connection with any subject described in paragraph (p)(1) in which the city or one of its agencies is a party or has any direct and substantial interest; and in which he or she participated directly or indirectly through decision, approval, disapproval, recommendation, the rendering of advice, investigation; or otherwise, during his or her city service or employment. A person participated "directly' where he or she was substantially involved in the particular subject matter through decision, approval, disapproval, recommendation, the rendering of advice, investigation, or otherwise, during his or her city service or employment. A person participated "indirectly" where he or she knowingly participated in any way in the particular subject matter through decision, approval, disapproval, recommendation, the rendering of advice, investigation, or otherwise, during his or her city service or employment. All persons covered by this paragraph shall execute an affidavit on a form approved by the city attorney prior to lobbying any city official attesting that the requirements of this subsection do not preclude the person from lobbying city officials. (5) Any person who violates this subsection shall be subject to the penalties provided in section 8A -2(p). (q) City attorney to render opinions on request. Whenever any person included in the terms defined in paragraphs (b)(1) through (6) and paragraph (b)(9) is in doubt as to the proper interpretation or application of this conflict of interest and code of ethics ordinance, or whenever any person who renders services to the city is in doubt as to the applicability of the ordinance that person, may submit to the city attorney a full written statement of the facts and questions. The city attorney shall then render an opinion to such person and shall publish these opinions without use of the name of the person advised unless the person permits the use of a name. [END OF SECTION] 51 SECTION 17 CONTRACT GENERAL CONDITIONS ARTICLE 1— DEFINITIONS Whenever used in these General Conditions or in the other Contract Documents, the following terms shall have the meaning indicated. These definitions shall always apply when the section of the Contract specifically refers to this article for the purpose of interpreting a word or group of words in that section of the Contract Documents. However, when the section of the Contract, where the word to be defined is used, does not specifically refers to this article to define the word or group of words, these definitions shall not apply unless the word, in the context of its use in the Contract Document in question, is ambiguous and open for interpretation. In addition, these definitions shall also not apply to contradict a definition that is given in a specific provision of a Contract Document: Addenda: Written or graphic documents issued prior to the Bid Opening which modify or interpret the Contract Documents, Drawings and Specifications, by addition, deletions, clarifications or correction. Application for Payment: The form furnished by the CONSULTANT which is to be used by the CONTRACTOR in requesting progress payments. Bid: the offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. BIDDER: Any person, firm or corporation submitting a Bid for Work. Bonds: Bid, performance and payment bonds and other instruments of security, furnished by the CONTRACTOR and their surety in accordance with the Contract Documents and in accordance with the law of the State of Florida. Change Order: A written order to the CONTRACTOR signed by the City authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price of the Contract Time issued after execution of the Contract. CITY: City of South Miami, 6130 Sunset Drive, South Miami, FL 33143. Construction Observer: An authorized representative of the CONSULTANT assigned to observe the Work performed and materials furnished by the CONTRACTOR or such other person as may be appointed by the CITY as his representative. The CONTRACTOR shall be notified in writing of the identity of this representative. Contract Documents: The Contract Documents shall include the Contract between the Owner and the Contractor, other documents listed in the Contract and modifications issued after execution of the Contract all Bid Documents including but not limited to the REQUEST FOR PROPOSAL, CONTRACTOR'S Bid, the Bonds Insurance Certificates and the Notice of Award, the Notice to Proceed, these General Conditions, Special Conditions, if any, any Supplementary Conditions, the Technical Specifications, Drawings, including any incorporated specifications, addenda to the drawings issued prior to execution of the Contract, Change Orders, Construction Change Directives and any written order for a minor change in the Work, and written modifications to any of the Contract Documents and Acknowledgment of Conformance with the City of South Miami. Contract Price: The total moneys payable to the CONTRACTOR pursuant to the terms of the Contract Documents. Contract Time: The number of calendar days stated in the Contract for the completion of the Work. Contracting Officer: The individual who is authorized to sign the contract documents on behalf of the CITY'S governing body. CONTRACTOR: The person, firm or corporation with whom the CITY has executed the Contract. CONSULTANT: The person identified as the CONSULTANT in the Supplementary Conditions or as designated by the CITY in writing and delivered to the CONTRACTOR. Day: A period of twenty -four hours measured from the beginning of the day at 12:01 a.m. and it shall be presumed to be a calendar day unless specifically designated as a business day. Days The number of twenty -four (24) hour periods following the event to which the word "days" refers 52 commencing at 12:01 a.m. at the start of the next day. Therefore, in computing any period of time prescribed or allowed by the Contract Documents, the day of the act, event or default from which the designated period of time begins to run shall not be included. The last day of the period so computed shall be included unless it is a Saturday, Sunday or legal holiday, in which event the period shall run until the end of the next business day that is not a Saturday, Sunday or legal holiday. Defective Work: Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents, or does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents, or has been damaged prior to the CONSULTANT'S recommendation of final payment (unless responsibility for the protection thereof has been delegated to the City); substitutions that are not properly approved and authorized, any deficiency in the Work, materials and equipment; materials and equipment furnished under the Contract that are not good quality and new unless otherwise required or permitted by the Contract Documents. Drawings: The drawings which show the character and scope of the Work to be performed and which have been prepared or approved by the CONSULTANT and are referred to in the Contract Documents. Field Order: A written order issued by the CONSULTANT which clarifies or interprets the Contract Documents in accordance with Paragraph 9.3 or orders minor changes in the Work in accordance with paragraph 10.2. Modification: (a) A written amendment of the Contract Documents signed by both parties, (b) a Change Order signed by both parties, (c ) a written clarification or interpretation if issued by the CONSULTANT in accordance with paragraph 9.3 or (d) a written order for minor change or alteration in the Work issued by the CONSULTANT pursuant to Paragraph 10.2. A modification may only be issued after execution of the Contract, it must be in writing and signed by the party against whom the modification is sought to be enforced. Notice of Award: The written notice by CITY to the apparent successful Bidder stating that upon compliance with the conditions precedent to be fulfilled by it within the time specified, CITY will execute and deliver the Contract to him. Notice to Proceed: A written notice given by CITY to CONTRACTOR (with copy to CONSULTANT) fixing the date on which the Contract Time shall commence to run and on which CONTRACTOR shall start to perform its obligations under the Contract Documents. Person: An individual or legal entity. Project: The entire construction operation being performed as delineated in the Contract Documents. Shop Drawings: All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the CONTRACTOR, a Subcontractor, manufacturer, supplier, or distributor, and which illustrate the equipment, material or some portion of the work and as required by the Contract Documents. Samples: Physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. Specifications: Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work. Subcontractor: An individual, firm or corporation having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the construction site. Substantial Completion: The date, as certified by the CONSULTANT, when the construction of the Project or a certified part thereof is sufficiently completed, in accordance with the Contract Documents, so that the Project, or a substantial part, can be utilized for the purposes for which it was intended without restriction or limitation to any degree, other than for the repair of minor "punch list" items; or if there be no such certification, the date when final payment is due in accordance with paragraph 14.9. However, in no event shall the project or portion thereof, be deemed to be substantially completed until a certificate of occupancy or certificate of use is lawfully issued by the applicable governmental agency. A certificate of Substantial Completion, issued by the CONSULTANT, shall be null and void if it is based on false, misleading or inaccurate information, from any source, or when it would not have been issue but for the consideration of Work that is thereafter found to be defective to a degree greater than that which would normally to be considered by the City to be minor "punch list" work. Supplier: Any person or organization who supplies materials or equipment for the Work, including the 53 fabrication of an item, but who does not perform labor at the site of the Work. Surety: The individual or entity who is an obligor on a Bond and who is bound with the CONTRACTOR for the full and faithful performance of the Contract and for the payment of all labor, services and materials used on the project. Work: Any and all obligations, duties and responsibilities necessary for the successful performance and completion of the Contract. Notice: The term "Notice' as used herein shall mean and include all written notices, demands, instructions, claims, approvals and disapprovals required to obtain compliance with Contract requirements. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or to an authorized representative of such individual, firm, or corporation, or if delivered at or sent by registered mail to the last known business address. Unless otherwise stated in writing, any notice to or demand upon the CITY under this Contract shall be delivered to the CITY's Manager and the CONSULTANT. ARTICLE 2 — PRELIMINARY MATTERS Award: 2.1 The CITY reserves the right to reject any and all Bids, at its sole discretion. Bids shall be awarded by the CITY to the lowest responsive and responsible Bidder. No Notice of Award shall be given until the CITY has concluded its investigation, as it deems necessary, to establish, to the satisfaction of the CITY, which Bidder is the most responsive and responsible of all the Bidders to complete the Work within the time prescribed and in accordance with the Contract Documents, The CITY reserves the right to reject the Bid of any Bidder who is not believed to be, in the sole discretion and satisfaction of the City, to be sufficiently responsible, qualified and financial able to perform the work. In analyzing a Bid, the CITY may also take into consideration alternate and unit prices, if requested by the Bid forms. If the Contract is awarded, the CITY shall issue the Notice of Award and give the successful Bidder a Contract for execution within ninety (90) day after opening of Bids. Execution of Contract: 2.2 At least four counterparts of the Contract, the Performance and Payment Bond, the Certificates of Insurance, the written notice of designated supervisor or superintendent as provided in Section 6.1 of the General Conditions, a detail schedule of values and such other Documents as required by the Contract Documents shall be executed and delivered by CONTRACTOR to the CITY within ten (10) calendar days of receipt of the Notice of Award. A Contract Document that requires the signature of a party may be executed in counterparts separately by each of the parties and, in such event, each counterpart separately executed shall, without proof or accounting for the other counterpart be deemed an original Contract Document. Forfeiture of Bid Security /Performance and Payment Bond: 2.3 Within ten (10) calendar days of being notified of the Award, CONTRACTOR shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached. 2.3.1 Each Bond shall be in the amount of one hundred percent (100 %) of the Contract Price guaranteeing to CITY the completion and performance of the Work covered in such Contract as well as full payment of all suppliers, material man, laborers, or Subcontractor employed pursuant to this Project. Each Bond shall be with a Surety company whose qualifications meet the requirements of Sections 2.3.4, 2.3.5, and 2.3.6. 2.3.2 Each Bond shall continue in effect for five year after final completion and acceptance of the Work with the liability equal to one hundred percent (100 %) of the Contract Sum. The Performance Bond shall be conditioned that CONTRACTOR shall, upon notification by CITY, correct any patent defective or faulty Work or materials which appear within one year after final completion of the Contract and shall, upon notification by CITY, correct any latent defective or faulty Work or materials which appear within five year after final completion of the Contract. 2.3.3 Pursuant to the requirements of Section 255.05(1), Florida Statutes, CONTRACTOR shall ensure that the Bond(s) referenced above shall be recorded in the public records of Miami -Dade County 54 and provide CITY with evidence of such recording. 2.3.4 Each Bond must be executed by a surety company authorized to do business in the State of Florida as a surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for a least five (5) years. 2.3.5 The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with the United States Department of Treasury Circular 570, current revisions. 2.3.6 The CITY will accept a surety bond from a company with a rating A. VII or better. 2.3.7 Failure of the successful Bidder to execute and deliver the Contract and deliver the required bonds and Insurance Certificates as stipulated in Paragraph 2.2 shall be cause for the CITY to annul the Notice of Award and declare the Bid and any security therefore forfeited. Contractor's Pre -Start Representation: 2.4 CONTRACTOR represents that it has familiarized itself with, and assumes full responsibility for having familiarized itself with the nature and extent of the Contract Documents, Work, locality, and with all local conditions and federal, state and local laws, ordinance, rules and regulations that may in any manner affect performance of the Work, and represents that it has correlated its study and observations with the requirements of the Contract Documents. CONTRACTOR also represents that it has studied all surveys and investigations, reports of subsurface and latent physical conditions referred to in the specifications and made such additional surveys and investigations as it deems necessary for the performance of the Work reflected in the Contract Documents and that he has correlated the results of all such data with the requirements of the Contract Documents. Commencement of Contract Time: 2.5 The Contract Time shall commence to run on the date stated in the Notice to Proceed. Starting the Project: 2.6 CONTRACTOR shall start to perform its obligations under the Contract Documents on the date the Contract Time commences to run. No Work shall be done at the site (as defined in Article 1), prior to the date on which the Contract Time commences to run, except with the written consent of the CITY Before Starting Construction: 2.7 Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements and conditions. It shall at once report in writing to CONSULTANT any conflict, error, or discrepancy which it may discover. Neither the CITY nor the CONSULTANT shall be liable for any harm, damage or loss suffered by CONTRACTOR as a result of its failure to discover any conflict, error, or discrepancy in the Drawings or Specifications nor shall the CONTRACTOR be entitle to any compensation for any harm, damage or loss suffered by the CONTRACTOR due to any conflict, error, or discrepancy in the Contract Documents. Schedule of Completion: 2.8 Within Five (5) business days after delivery of the Notice to Proceed by CITY to CONTRACTOR, CONTRACTOR shall submit to CONSULTANT for approval, an estimated construction schedule indicating the starting and completion dates of the various stages of the Work, and a preliminary schedule of Shop Drawing submissions. The CONSULTANT shall approve this schedule or require revisions thereto within seven (7) calendar days of its submittal. If there is more than one CONTRACTOR involved in the Project, the responsibility for coordinating the Work of all CONTRACTORS shall be provided in the Special Conditions. 2.9 Within five (5) business days after delivery of the executed Contract by CITY to CONTRACTOR, but before starting the Work at the site, a pre- construction conference shall be held to review the above schedules, to establish procedures for handling Shop Drawings and other submissions, and for processing Applications for Payment, and to establish a working understanding between the parties as to the Project. Present at the conference will be the CITY'S representative, CONSULTANT, Resident Project Representatives, CONTRACTOR and its Superintendent. 55 Qualifications of Subcontractors Material men and Suppliers: 2.10 Within five (5) business days after bid opening, the apparent lowest responsive and responsible Bidder shall submit to the CITY and the CONSULTANT for acceptance a list of the names of Subcontractors and such other persons and organizations (including those who are to furnish principal items of materials or equipment) proposed for those portions of the Work as to which the identity of Subcontractors and other persons and organizations must be submitted as specified in the Contract Documents. Within thirty (30) calendar days after receiving the list, the CONSULTANT will notify the CONTRACTOR in writing if either the CITY or the CONSULTANT has reasonable objection to any Subcontractor, person, or organization on such list. The failure of the CITY or the CONSULTANT to make objection to any Subcontractor, person, or organization on the list within thirty (30) calendar days of the receipt shall constitute an acceptance of such Subcontractor, person or organization. Acceptance of any such Subcontractor, person or organization shall not constitute a waiver of any right of the CITY or the CONSULTANT to reject defective Work, material or equipment, or any Work, material or equipment not in conformance with the requirements of the Contract Documents. 2.11 If, prior to the Notice of Award, the CITY or the CONSULTANT has reasonable objection to any Subcontractor, person or organization listed, the apparent low Bidder may, prior to Notice of Award, submit an acceptable substitute without an increase in its bid price. ARTICLE 3— CORRELATION, INTERPRETATION AND INTENT OF CONTRACT DOCUMENTS 3.1 It is the intent of the Specifications and Drawings to describe a complete Project to be constructed in accordance with the Contract Documents. The Contract Documents comprise the entire Contract between the CITY and the CONTRACTOR. They may be altered only by a modification as defined in Article 1. 3.2 The Contract Documents are complementary; what is called for by one is as binding as if called for by all the documents. If CONTRACTOR finds a conflict, error or discrepancy in the Contract Documents, it shall, before proceeding with the Work affected thereby, immediately call it to the CONSULTANT's attention in writing. The various Contract Documents are complementary; in case of conflict, error or discrepancy, the more stringent interpretation and requirement that shall provide the maximum benefit to the City shall apply 3.3 The words "furnish" and "furnish and install ", "install ", and "provide" or words with similar meaning shall be interpreted, unless otherwise specifically stated, to mean "furnish and install complete in place and ready for service ". 3.4 Miscellaneous items and accessories which are not specifically mentioned, but which are essential to produce a complete and properly operating installation, or usable structure, providing the indicated functions, shall be furnished and installed without change in the Contract Price. Such miscellaneous items and accessories shall be of the same quality standards, including material, style, finish, strength, class, weight and other applicable characteristics, as specified for the major component of which the miscellaneous item or accessory is an essential part, and shall be approved by the CONSULTANT before installation. The above requirement is not intended to include major components not covered by or inferable from the Drawings and Specifications. 3.5 The Work of all trades under this Contract shall be coordinated by the CONTRACTOR in such a manner as obtain the best workmanship possible for the entire Project, and all components of the Work shall be installed or erected in accordance with the best practices of the particular trade. 3.6 The CONTRACTOR shall be responsible for making the construction of habitable structures under this Contract rain proof, and for making equipment and utility installations properly perform the specified function. If he is prevented from so doing by any limitations of the Drawings or Specifications, the CONTRACTOR shall immediately notify the CONSULTANT in writing of such limitations before proceeding with construction in the area where the problem limitation exists. 3.7 Manufacturer's literature, when referenced, shall be dated and numbered and is intended to establish the minimum requirements acceptable. Whenever reference is given to codes, or standard specifications or 56 other data published by regulating agencies or accepted organizations, including but not limited to National Electrical Code, applicable State Building Code, Florida Building Code, Federal Specifications, ASTM Specifications, various institute specifications, and the like, it shall be understood that such reference is to the latest edition including addenda in effect on the date of the Bid. 3.8 Brand names where used in the technical specifications, are intended to denote the standard or quality required for the particular material or product. The term "equal" or "equivalent ", when used in connection with brand names, shall be interpreted to mean a material or product that is similar and equal in type, quality, size, capacity, composition, finish, color and other applicable characteristics to the material or product specified by trade name, and that is suitable for the same use capable of performing the same function, in the opinion of the CONSULTANT, as the material or product so specified. Proposed equivalent items must be approved by CONSULTANT before they are purchased or incorporated in the Work. (When a brand name, catalog number, model number, or other identification, is used without the phrase "or equal ", the CONTRACTOR shall use the brand, make and model specified). 3.9 Throughout this agreement the male pronoun may be substituted for female and neuter and vice versa and the singular words substituted for plural and plural words substituted for singular wherever applicable. 3.10 All technical interpretations shall be made by the CONSULTANT as set forth in Section 9.3 below. 3.11 In the event that there is a conflict between or among the Contract Documents, only the latest version shall apply and the latest version of the following documents which are set forth in the order of their precedence so that all the documents listed above a given document shall have precedence over all the documents listed below it. (a) Amendments and Change Orders (b) Addenda to drawingd (c) Drawings (d) Drawings of a larger scale (e) Drawings of a smaller scale (f) Written dimensions (g) Scaled dimensions (h) Specifications ( i) Solicitation Documents unless the contract expressly excludes them or their provisions ( 1) Solicitation letter ( 2) Instructions to Repsondent /Bidder ( 3 ) Request for Proposal /Bid (RFP), with all Exhibits thereto, and with Exhibits taking precedence over the RFP (j) Contract with all Exhibits thereto and with Exhibits taking precedence over the Contract. (k) Special Conditions with all Exhibits thereto, and with Exhibits taking precedence over the Special Conditions. ( 1) Supplemenary Conditions, with all Exhibits thereto, and with Exhibits taking precedence over the Special Conditions; and (m) General Conditions. ARTICLE 4— AVAILABILITY OF LANDS SUBSURFACE CONDITIONS REFERENCE POINTS Availability of Lands: 4.1 The CITY shall furnish, as indicated in the Contract Documents, the lands upon which the Work is to be done, rights -of -way for access thereto, and such other lands which are designed for the use of the CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the CITY, unless otherwise specified in the Contract Documents. Other access to such lands or rights -of -way for the CONTRACTOR'S convenience shall be the responsibility of the CONTRACTOR. 57 The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of material and equipment. 1.2 The CITY will, upon request, furnish to the Bidders, copies of all available boundary surveys and subsurface tests at no cost. Subsurface Conditions: 4.3 The CONTRACTOR acknowledges that he has investigated prior to bidding and satisfied himself as to the conditions affecting the Work, including but not limited to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, river stages, tides, water tables or similar physical conditions at the site, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during prosecution of the Work. The CONTRACTOR further acknowledges that he has satisfied himself as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the CITY/ CONSULTANT on the site or any contiguous site, as well as from information presented by the Drawings and Specifications made part of this Contract, or any other information made available to it prior to receipt of bids. Any failure by the CONTRACTOR to acquaint itself with the available information shall not relieve it from responsibility for estimating properly the difficulty or cost of successfully performing Work. The CITY assumes no responsibility for any conclusions or interpretations made by the CONTRACTOR on the basis of the information made available by the CITY/ CONSULTANT. Differing Site Conditions: 4.4 The CONTRACTOR shall within forty eight (48) hours of its discovery, and before such conditions are disturbed, notify the CITY in writing, of: 4.4.1 Subsurface or latent physical conditions at the site differing materially from those indicated in the Contract Documents, and 4.4.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally inherent in Work of the character provided for in this Contract. The CITY shall promptly investigate the conditions, and if it finds that such conditions do materially differ to the extent as to cause an increase or decrease in the CONTRACTOR'S cost of, or the time required for, performance of any part of the Work under this Contract, an equitable adjustment shall be made and the Contract modified in writing accordingly. 4.5 No claim of the CONTRACTOR under this clause shall be allowed unless the CONTRACTOR has given the notice required in 4.4 above; provided, however, the time prescribed therefore may be extended by the CITY, but only if done in writing signed by the City Manager or the CONSULTANT. ARTICLE 5 — INSURANCE Insurance Provisions 5.0 The Contractor shall purchase insurance from and shall maintain the insurance with a company or companies lawfully authorized to do business in the State of Florida as will protect the Contractor from claims as set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 5.0.1 claims under workers' compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; 5.0.2 claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor's employees; 5.0.3 claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's employees; 5.0.4 claims for damages insured by usual personal injury liability coverage; 58 coverage afforded under the policies shall not be canceled or materially changed until at least thirty (30) calendar days prior written notice has been given by the insurer to the CITY and CONSULTANT by certified mail. The insurer shall be rated A.VII or better per A.M. Best's Key Rating Guide, latest edition and authorized to issue insurance in the State of Florida. 5.3 The CONTRACTOR agrees that if any part of the Work under the Contract is sublet, the subcontract shall contain the same insurance provision as set forth in section 5.1 and 5.2 above and substituting the word SUBCONTRACTOR for the word CONTRACTOR where applicable. Fire and Extended Coverage Insurance (Builders' Risk): 5.4 In the event that this contract involves the construction of a structure, the CONTRACTOR shall maintain, with an Insurance Company or Insurance Companies acceptable to the CITY, Fire, Extended Coverage and Vandalism & Malicious Mischief Insurance on buildings and structures, while in the course of construction, including foundations, additions, attachments and all permanent fixtures belonging to and constituting a part of said buildings or structures. The policy or policies shall also cover machinery, if the cost of machinery is included in the Contract, or if the machinery located in a building that is being renovated by reason of this contract. The amount of insurance must at all times be at least equal to the actual cash value of the insured property. The policy shall be in the name of the CITY and the CONTRACTOR, as their interest may appear, and shall also cover the interests of all Subcontractors performing Work. 5.5 The CONTRACTOR shall provide the CITY with satisfactory evidence certifying that the foregoing insurance is in force; and such evidence shall include provisions that the insurance shall not be canceled or materially changed until at least thirty (30) calendar days prior written notice has been given by the insurer to the CITY by certified mail. Cancellation and Re- Insurance: 5.6 If any notice of cancellation of insurance or changed by the insurance company or should any insurance have an expiration date that will occur during the period of this contract, the CONTRACTOR shall be responsible for securing other acceptable insurance prior to such cancellation, change, or expiration so as to provide continuous coverage as specified in this section and so as to maintain coverage during the life of this Contract. 5.7 All deductibles must be declared by the CONTRACTOR and must be approved by the CITY. At the option of the CITY, either the CONTRACTOR shall eliminate or reduce such deductible or the CONTRACTOR shall procure a Bond, in a form satisfactory to the CITY covering the same. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES Supervision and Superintendence: 6.1 The CONTRACTOR shall supervise and direct the Work. It shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall employ and maintain a qualified supervisor or superintendent (hereinafter referred to as "Supervisor" at the Work site who shall be designated in writing by the CONTRACTOR, before the CONTRACTOR commences the Work and within the time required by the Contract, as the CONTRACTOR'S representative at the site. The Supervisor or so designated shall have full authority to act on behalf of the CONTRACTOR and all communications given to the Supervisor shall be as binding as if given to the CONTRACTOR. The Supervisor(s) shall be present at each site at all times as required to perform adequate supervision and coordination of the Work. (Copies of written communications given to the Supervisor shall be mailed to the CONTRACTOR'S home office). 6.1.1 The CONTRACTOR shall keep one record copy of all Specifications, Drawings, Addenda, Modifications and Shop Drawings at the site at all times and in good order and annotated to show all changes made during the construction process. These shall be available to the CONSULTANT and any CITY Representative at all reasonable times. A set of "As- Built" drawings, as well as the original Specifications, Drawings, Addenda, Modifications and Shop Drawings with annotations, 60 5.0.5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting there from; 5.0.6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; 5.0.7 claims for bodily injury or property damage arising out of completed operations; and 5.0.8 claims involving contractual liability insurance applicable to the Contractor's obligations under the Contract. Contractor's Liability Insurance: 5.1 CONTRACTOR shall provide and maintain in force and effect until all the Work to be performed under this Contract has been completed and accepted by CITY (or for such duration as is otherwise specified hereinafter), the insurance coverage set forth below: 5.1.1 Worker's Compensation insurance at the statutory amount as to all employees in compliance with the "Workers' Compensation Law" of the State of Florida and all applicable federal laws. In addition, the policy(ies) must include: Employers' Liability at the statutory coverage amount. The CONTRACTOR shall further insure that all of its Subcontractors maintain appropriate levels of Worker's Compensation Insurance. 5.1.2 Comprehensive General Liability insurance with broad form endorsement, on a Florida approved form including automobile liability, completed operations and products liability, contractual liability, severability of interest with cross liability provision, and personal injury and property damage liability with limits of $1,000,000 combined single limit per occurrence and $2,000,000 aggregate, including: • Personal Injury: $1,000,000; • Medical Insurance: $5,000 per person; • Automobile Liability: $1,000,000 each accident /occurrence. • Excess /Umbrella: $1,000,000 per claim Excess /Umbrella Comprehensive General Liability insurance shall be written on a Florida approved form with the same coverage as the primary insurance policy but in the amount of $1,000,000 per claim. Coverage must be afforded on a form no more restrictive than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: (a) Premises and Operation (b) Independent Contractors (c) Products and /or Completed Operations Hazard (d) Explosion, Collapse and Underground Hazard Coverage (e) Broad Form Property Damage (f) Broad Form Contractual Coverage applicable to this specific Contract, including any hold harmless and /or indemnification agreement. (g) Personal Injury Coverage with Employee and Contractual Exclusions removed, with minimum limits of coverage equal to those required for Bodily Injury Liability and Property Damage Liability. 5.1.3 Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) plus an additional One Million Dollar ($1,000,000.00) umbrella per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Business Automobile Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: (a) Owned Vehicles. (b) Hired and Non -Owned Vehicles (c) Employers' Non - Ownership 5.2 Before starting the Work, the CONTRACTOR shall file with the CITY and CONSULTANT certificates of such insurance, acceptable to the CITY, the name, address and telephone number of the insurance agent or broker through whom the policy was obtained; these certificates shall contain a provision that the 59 shall be made available to the City at all times and it shall be delivered to the CITY upon completion of the Project. Labor, Materials and Equipment: 6.2 The CONTRACTOR shall provide competent, suitably qualified personnel to lay out the Work and perform construction as required by the Contract Documents. It shall at all times maintain good discipline and order at the site. 6.3 The CONTRACTOR shall furnish all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, local telephone, water and sanitary facilities and all other facilities and incidentals necessary for the execution, testing, initial operation and completion of the Work. 6.4 All materials and equipment shall be new, except as otherwise provided in the Contract Documents. When special makes or grades of material which are normally packaged by the supplier or manufacturer are specified or approved, such materials shall be delivered to the site in their original packages or containers with seals unbroken and labels intact. 6.5 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturer, fabricator, or processors, except as otherwise provided in the Contract Documents. Materials Equipment Products and Substitutions: 6.6 Materials, equipment and products incorporated in the Work must be approved for use before being purchased by the CONTRACTOR. The CONTRACTOR shall submit to the CONSULTANT a list of proposed materials, equipment or products, together with such samples as may be necessary for them to determine their acceptability and obtain their approval, within ninety (90) calendar days after award of Contract unless otherwise stipulated in the Special Conditions. No request for payment for "or equal" equipment will be approved until this list has been received and approved by the CONSULTANT. 6.6.1 Whenever a material, article or piece of equipment is identified on the Drawings or Specifications by reference to brand name or catalog number, it shall be understood that this is referenced for the purpose of defining the performance or other salient requirements and that other products of equal capacities, quality and function shall be considered. The CONTRACTOR may recommend the substitution of a material, article, or piece of equipment of equal substance and function for those referred to in the Contract Documents by reference to brand name or catalog number, and if, in the opinion of the CONSULTANT, such material, article, or piece of equipment is of equal substance and function to that specified, the CONSULTANT may approve its substitution and use by the CONTRACTOR. Incidental changes or extra component parts required to accommodate the substitute will be made by the CONTRACTOR without a change in the Contract Price or the Contract Time. 6.6.2 No substitute shall be ordered or installed without the written approval of the CONSULTANT who shall be the judge of quality. 6.6.3 Delay caused by obtaining approvals for substitute materials shall not be considered justifiable grounds for an extension of construction time. 6.6.4 Should any Work or materials, equipment or products not conform to requirements of the Drawings and Specifications or become damaged during the progress of the Work, such Work or materials shall be removed and replaced, together with any Work disarranged by such alterations, at any time before completion and acceptance of the Project. All such Work shall be done at the expense of the CONTRACTOR. 6.6.5 No materials or supplies for the Work shall be purchased by the CONTRACTOR or any Subcontractor subject to any chattel mortgage or under a conditional sale or other agreement by which an interest is retained by the Seller. The CONTRACTOR warrants that they have good title to all materials and supplies used by them in the Work. 61 6.23 The CONTRACTOR shall also submit to the CONSULTANT for review, with such promptness as to cause no delay in Work, all samples required by the Contract Documents. All samples shall have been checked by and stamped with the approval of the CONTRACTOR, identified clearly as to material, manufacturer, any pertinent catalog numbers and the use for which intended. 6.24 At the time of each submission, the CONTRACTOR shall notify the CONSULTANT, in writing, of any deviations between the Shop Drawings or samples and the requirements of the Contract Documents, 6.25 The CONSULTANT shall review with responsible promptness Shop Drawings and Samples, but his review shall be only for conformance with the design concept of the Project and for compliance with the information given in the Contract Documents. The review of a separate item as such will not indicate review of the assembly in which the items functions. The CONTRACTOR shall make any corrections required by the CONSULTANT and shall return the required number of corrected copies of Shop Drawings and resubmit new samples until the review is satisfactory to the CONSULTANT. The CONTRACTOR shall notify the CONSULTANT, in writing, of any prior Shop Drawing or revisions to Shop Drawings that are in conflict with each submission or re- submission. The CONTRACTOR'S stamp of approval on any Shop Drawings or sample shall constitute representation to the CITY and the CONSULTANT that the CONTRACTOR has either determined and /or verified all quantities, dimension, field construction criteria, materials, catalog numbers and similar data or they assume full responsibility for doing so, and that they have reviewed or coordinated each Shop Drawing or sample with the requirements of the Work and the Contract Documents. 6.26 No Work requiring a submittal of a Shop Drawing or sample shall be commenced until the submission has been reviewed and approved in writing by the CONSULTANT. A copy of each Shop Drawing and each approved sample shall be kept in good order, in a book or binder, in chronological order or in such other order required by the CONSULTANT in writing, by the CONTRACTOR at the site and shall be available to the CONSULTANT. 6.27 The CONSULTANT's review of Shop Drawings or samples shall not relieve the CONTRACTOR from his responsibility for any deviations from the requirements of the Contract Documents unless the CONTRACTOR has informed the CONSULTANT, in writing, to each deviation at the time of submission and the CONSULTANT has given written approval to the specific deviation, nor shall any review by the CONSULTANT relieve the CONTRACTOR from responsibility for errors or omissions in the Shop Drawings or samples. 6.271 The CONTRACTOR shall be liable to the CITY for any additional cost or delay that is caused by its failure to notify the CONSULTANT of any of said deviations or conflicts between Shop Drawings or due to errors in the Shop Drawings or samples. Cleaning Up: 6.28 The CONTRACTOR shall clean up behind the Work as much as is reasonably possible as the Work progresses. Upon completion of the Work, and before acceptance of final payment for the Project by the CITY, the CONTRACTOR shall remove all his surplus and discarded materials, excavated material and rubbish as well as all other material and equipment that does not form a part of the Work, from the property, roadways, sidewalks, parking areas, lawn and all adjacent property. In addition, the CONTRACTOR shall clean his portion of Work involved in any building under this Contract, so that no further cleaning by the CITY is necessary prior to its occupancy and he shall restore all property, both public and private, which has been disturbed or damaged during the prosecution of the Work so as to leave the whole Work and Work Site in a neat and presentable condition. 6.29 If the CONTRACTOR does not clean the Work site, the CITY may clean the Work Site of the materials referred to in paragraph 6.28 and charge the cost to the CONTRACTOR. Public Convenience and Safety: 6.30 The CONTRACTOR shall, at all times, conduct the Work in such a manner as to insure the least practicable obstruction to public travel. The convenience of the general public and of the residents along and adjacent to the area of Work shall be provided for in a satisfactory manner, consistent with the operation and local conditions. "Street Closed" signs shall be placed immediately adjacent to the Work, in a 64 When such charges are normally made by the CITY and when so stated in the Special Conditions, there will be no charges to the CONTRACTOR. The CITY shall assist the CONTRACTOR, when necessary, in obtaining such permits and licenses. The CONTRACTOR shall also pay all public utility charges. Electrical Power and Lighting: 6.16 Electrical power required during construction shall be provided by each prime CONTRACTOR as required by it. This service shall be installed by a qualified electrical Contractor approved by the CONSULTANT. Lighting shall be provided by the CONTRACTOR in all spaces at all times where necessary for good and proper workmanship, for inspection or for safety. No temporary power shall be used off temporary lighting lines without specific approval of the CONTRACTOR. Laws and Regulations 6.17 The CONTRACTOR shall comply with all notices, laws, ordinances, rules and regulations applicable to the Work. If the CONTRACTOR observes that the Specifications or Drawings are at variance therewith, it shall give the CONSULTANT prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification. If the CONTRACTOR performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the CONSULTANT, it shall bear all costs arising there from; however, it shall not be its primary responsibility to make certain that the Drawings and Specifications are in accordance with such laws, ordinances, rules and regulations. Taxes: 6.18 Cost of all applicable sales, consumer use, and other taxes for which the CONTRACTOR is liable under the Contract shall be included in the Contract Price stated by the CONTRACTOR. Safety and Protection: 6.19 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. They shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or lass to: 6.19.1 All employees and other persons, who may be affected thereby, 6.19.2 All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the site, and 6.19.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 6.20 The CONTRACTOR shall designate a responsible member of their organization at the site whose duty shall be the prevention of accidents. This person shall be the CONTRACTOR'S Superintendent unless otherwise designated in writing by the CONTRACTOR to the CITY. Emergencies: 6.21 In emergencies affecting the safety of persons or the Work or property at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the CONSULTANT or CITY, is obligated to act, at his discretion, to prevent threatened damage, injury or loss. He shall give the CONSULTANT prompt written notice of any significant changes in the Work or deviations from the Contract Documents caused thereby. If the CONTRACTOR believes that additional Work done by him in an emergency which arose from causes beyond his control entitles him to an increase in the Contract Price or an extension of the Contract Time, he may make a claim therefore as provided in Articles 11 and 12. Shop Drawings and Samples: 6.22 After checking and verifying all field measurements, the CONTRACTOR shall submit to the CONSULTANT for review, in accordance with the accepted schedule of shop drawing submissions, six (6) copies (or at the CONSULTANT option, one reproducible copy) of all Shop Drawings, which shall have been checked by and stamped with the approval of the CONTRACTOR. The Shop Drawings shall be numbered and identified as the CONSULTANT may require. The data shown on the Shop Drawings shall be complete with respect to dimensions, design criteria, materials of construction and the like to enable the CONSULTANT to review the information without any unnecessary investigation. 63 Concerning Subcontractors: 6.7 The CONTRACTOR shall not employ any Subcontractor, against whom the CITY or the CONSULTANT may have reasonable objection, nor will the CONTRACTOR be required to employ any Subcontractor who has been accepted by the CITY and the CONSULTANT, unless the CONSULTANT determines that there is good cause for doing so. 6.8 The CONTRACTOR shall be fully responsible for all acts and omissions of its Subcontractors and of persons and organizations directly or indirectly employed by it and of persons and organizations for whose acts any of them may be liable to the same extent that they are responsible for the acts and omissions of persons directly employed by them. Nothing in the Contract Documents shall create any contractual relationship between CITY or CONSULTANT and any Subcontractor or other person or organization having a direct contract with CONTRACTOR, nor shall it create any obligation on the part of CITY or CONSULTANT to pay or to see to payment of any persons due subcontractor or other person or organization, except as may otherwise be required by law. CITY or CONSULTANT may furnish to any Subcontractor or other person or organization, to the extent practicable, evidence of amounts paid to the CONTRACTOR on account of specified Work done in accordance with the schedule values. 6.9 The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing the Work among Subcontractors or delineating the Work performed by any specific trade. 6.10 The CONTRACTOR agrees to bind specifically every Subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of the CITY. 6.11 All Work performed for the CONTRACTOR by a Subcontractor shall be pursuant to an appropriate agreement between the CONTRACTOR and the Subcontractor. 6.12 The CONTRACTOR shall be responsible for the coordination of the trades, Subcontractors material and men engaged upon their Work. 6.12.1 The CONTRACTOR shall cause appropriate provisions to be inserted in all subcontracts relative to the Work to bind Subcontractors to the CONTRACTOR by the terms of these General Conditions and other Contract Documents insofar as applicable to the Work of Subcontractors, and give the CONTRACTOR the same power as regards to terminating any subcontract that the CITY may exercise over the CONTRACTOR under any provisions of the Contract Documents. 6.12.2 The CITY or CONSULTANT will not undertake to settle any differences between the CONTRACTOR and their Subcontractors or between Subcontractors. 6.12.3 If in the opinion of the CONSULTANT, any Subcontractor on the Project proves to be incompetent or otherwise unsatisfactory, they shall be promptly replaced by the CONTRACTOR if and when directed by the CONSULTANT in writing. Patent Fees and Royalties: 6.13 The CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use of any invention, design, process or device which is the subject of patent rights or copyrights held by others. He shall indemnify and hold harmless the CITY and the CONSULTANT and anyone directly or indirectly employed by either of them from against all claims, damages, losses and expenses (including attorney's fees) arising out of any infringement of such rights during or after the completion of the Work, and shall defend all such claims in connection with any alleged infringement of such rights. 6.14 The CONTRACTOR shall be responsible for determining the application of patent rights and royalties materials, appliances, articles or systems prior to bidding. However, he shall not be responsible for such determination on systems which do not involve purchase by them of materials, appliances and articles. Permits: 6.15 The CONTRACTOR shall secure and pay for all construction permits and licenses and shall pay for all governmental charges and inspection fees necessary for the prosecution of the Work, which are applicable at the time of his Bid. 62 conspicuous position, at such locations as traffic demands. At any time that streets are required to be closed, the CONTRACTOR shall notify law enforcement agencies and in particular, the City of South Miami Police Department, before the street is closed and again as soon as it is opened. Access to fire hydrants and other fire extinguishing equipment shall be provided and maintained at all times. Sanitary Provisions: 6.31 The CONTRACTOR shall provide on -site office, and necessary toilet facilities, secluded from public observation, for use of all personnel on the Work Site, whether or not in his employ. They shall be kept in a clean and sanitary condition and shall comply with the requirements and regulations of the Public Authorities having jurisdiction. They shall commit no public nuisance. Temporary field office and sanitary facilities shall be removed upon completion of the Work and the premises shall be left clean. Indemnification: 6.32 Unless prohibited by law, or by the terms of applicable and viable insurance policies required by the Contract Documents, of a solvent insurer whose policy covers the same matters as described herein, the Contractor shall indemnify and hold harmless the CITY and the CONSULTANT, as well as their agents and employees or any of them from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, received or sustained by any person or persons during or on account of or arising out of any operations connected with the Work, but only to the extent caused by the negligent acts or omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they are liable. In consideration of the separate sum of One Hundred Dollars ($100.00) or other valuable consideration, CONTRACTOR shall indemnify and hold harmless the CITY and the CONSULTANT from any claim, damage, loss or expense that is caused in part by a party indemnified hereunder. This indemnification provision is cumulative with all other remedies or other indemnification provisions contained in the Contract Documents. 6.33 In the event that any action or proceeding is brought against CITY or CONSULTANT by reason of any such claim or demand, CONTRACTOR, upon written notice from CITY shall defend such action or proceeding by counsel satisfactory to CITY. The indemnification provided above shall obligate CONTRACTOR to defend at its own expense or to provide for such defense, at CITY'S option, any and all claims of liability and all suits and actions of every name and description that may be brought against CITY or CONSULTANT, excluding only those claims that allege that the injuries arose out of the sole negligence of CITY or CONSULTANT. 6.34 The obligations of the CONTRACTOR under paragraph 6.33 shall not extend to the liability of the CONSULTANT, its agents or employees arising out of (a) the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifications or (b) the giving of or the failure to give directions or instructions by the CONSULTANT, its agents or employees provided such act or omission is the primary cause of injury or damage. 6.35 All of the forgoing indemnification provisions shall survive the term of the Contract to which these General Conditions are a part. Responsibility for Connection to Existing Work: 6.35 It shall be the responsibility of the CONTRACTOR to connect its Work to each part of the existing Work, existing building or structure or Work previously installed as required by the Drawings and Specifications to provide a complete installation. 6.36 Excavations, grading, fill, storm drainage, paving and any other construction or installations in rights -of- ways of streets, highways, public carrier lines, utility lines, either aerial, surface or subsurface, etc., shall be done in accordance with requirements of the special conditions. The CITY will be responsible for obtaining all permits necessary for the Work described in this paragraph 6.36. Upon completion of the Work, CONTRACTOR shall present to CONSULTANT certificates, in triplicate, from the proper authorities, stating that the Work has been done in accordance with their requirements. 6.36.1 The CITY will cooperate with the CONTRACTOR in obtaining action from any utilities or public authorities involved in the above requirements. 65 6.36.2 The CONSULTANT shall be responsible for obtaining elevations of curbs and gutters, pavement, storm drainage structures, and other items which must be established by governmental departments as soon as grading operations are begun on the site and, in any case, sufficiently early in the construction period to prevent any adverse effect on the Project. Cooperation with Governmental Departments Public Utilities Etc 6.37 The CONTRACTOR shall be responsible for making all necessary arrangements with governmental departments, public utilities, public carriers, service companies and corporations (hereinafter referred to as "third parties ") owning or controlling roadways, railways, water, sewer, gas, electrical conduits, telephone, and telegraph facilities such as pavements, tracks, piping, wires, cables, conduits, poles, guys, etc., including incidental structures connected therewith, that are encountered in the Work in order that such items are properly shored, supported and protected, that their location is identified and to obtain authority from these third parties for relocation if the CONTRACTOR desires to relocate the item. The CONTRACTOR shall give all proper notices, shall comply with all requirements of such third parties in the performance of his Work, shall permit entrance of such third parties on the Project in order that they may perform their necessary work, and shall pay all charges and fees made by such third parties for their work. 6.37.1 The CONTRACTOR'S attention is called to the fact that there may be delays on the Project due to work to be done by governmental departments, public utilities, and others in repairing or moving poles, conduits, etc. The CONTRACTOR shall cooperate with the above parties in every way possible, so that the construction can be completed in the least possible time. 6.37.2 The CONTRACTOR shall have made itself familiar with all codes, laws, ordinances, and regulations which in any manner affect those engaged or employed in the Work, or materials and equipment use in or upon the Work, or in any way affect the conduct of the Work, and no plea of misunderstanding will be considered on account of damage or delay caused by his ignorance thereof. Use Premises: 6.38 CONTRACTOR shall confine its apparatus, storage of materials, and operations of its workmen to the limits indicated by law, ordinances, permits and directions of CONSULTANT and CITY, and shall not unnecessarily encumber any part of the site or any areas off site. 638.1 CONTRACTOR shall not overload or permit any part of any structure to be loaded with such weight as will endanger its safety, nor shall it subject any work to stresses or pressures that will endanger it. 6.38.2 CONTRACTOR shall enforce the rules and regulation promulgated by the CONSULTANT and CITY as well as their instructions with regard to signs, advertisements, fires and smoking. 6.38.3 CONTRACTOR shall arrange and cooperate with CITY in routing and parking of automobiles of its employees, subcontractors and other personnel, as well as that of the material delivery trucks and other vehicles that come to the Project site. 6.38.4 The City will designate specific areas on the site for storage, parking, etc. and the job site shall be fenced to protect the job site and the general public. 6.38.5 The CONTRACTOR shall furnish, install and maintain adequate construction office facilities for all workers employed by it or by its Subcontractors. Temporary offices shall be provided and located where directed and approved by the CONSULTANT. All such facilities shall be furnished in strict accordance with existing governing regulations. Field offices shall include telephone facilities. Protection of Existing Property Improvements: 6.39 Any existing surface or subsurface improvements, such as pavements, curbs, sidewalks, pipes or utilities, footings, or structures (including portions thereof), trees and shrubbery, not indicated on the Drawings or noted in the Specifications as being removed or altered shall be protected from damage during construction of the Project. Any such improvements damaged during construction of the Project shall be restored at the expense of the CONTRACTOR to a condition equal to that existing at the time of award of Contract. 66 ARTICLE 7 — WORK BY OTHERS 7.1 The CITY may perform additional Work related to the Project or may let other direct contracts therefore which shall contain General Conditions similar to these. The CONTRACTOR shall afford the other contractors who are parties to such direct contracts (or the CITY, if it is performing the additional Work itself), reasonable opportunity for the introduction and storage of materials and equipment and the execution of Work, and shall properly connect and coordinate its Work with theirs. 7.2 If any part of the CONTRACTOR'S Work depends upon proper execution or results of the Work of any other contractor or the CITY, the CONTRACTOR shall promptly report to the CONSULTANT in writing any defects or deficiencies in such Work that render it unsuitable for the CONTRACTOR's Work. 7.3 The CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and fit to receive or be received by such other Work. The CONTRACTOR shall not endanger any Work of others by cutting, excavating or otherwise altering their Work and shall only cut or alter their Work with the written consent of the CONSULTANT and of the other contractor whose work will be affected. 7.4 If the performance of additional Work by other contractors or the CITY is not noted in the Contract Documents prior to the execution of the Contract, written notice thereof shall be given to the CONTRACTOR prior to starting any such additional Work. If the CONTRACTOR believes that the performance of such additional Work by the CITY or others will cause the CONTRACTOR additional expense or entitles him to an extension of the Contract Time, he may make a claim therefore as provided in Articles 11 and 12. 7.5 Where practicable, the CONTRACTOR shall build around the work of other separate contractors or shall leave chases, slots and holes as required to receive and to conceal within the general construction Work the work of such other separate contractors as directed by them. Where such chases, slots, etc., are impracticable, the Work shall require specific approval of the CONSULTANT. 7.6 Necessary chases, slots, and holes not built or left by the CONTRACTOR shall be cut by the separate contractor requiring such alterations after approval of the CONTRACTOR. The CONTRACTOR shall do all patching and finishing of the work of other contractors where it is cut by them and such patching and finishing shall be at the expense of CONTRACTOR 7.7 Cooperation is required in the use of site facilities and in the detailed execution of the Work. Each contractor shall coordinate their operation with those of the other Contractors for the best interest of the Work in order to prevent delay in the execution thereof. 7.8 Each of several contractors working on the Project Site shall keep themselves informed of the progress of the work of other contractors. Should lack of progress or defective workmanship on the part of other contractors interfere with the CONTRACTOR's operations, the CONTRACTOR shall notify the CONSULTANT immediately and in writing. Lack of such notice to the CONSULTANT shall be construed as acceptance by the CONTRACTOR of the status of the work of other contractors as being satisfactory for proper coordination of CONTRACTOR's own Work. 7.9 The cost of extra Work resulting from lack of notice, untimely notice, failure to respond to notice, Defective Work or lack of coordination shall be the CONTRACTOR's cost. ARTICLE 8— CITY'S RESPONSIBILITIES 8.1 The CITY will issue all communications to the CONTRACTOR through the CONSULTANT. 8.2 In cases of termination of employment of the CONSULTANT, the CITY will appoint a CONSULTANT whose status under the Contract Documents shall be that of the former CONSULTANT. 8.3 The CITY shall promptly furnish the data required of them under the Contract Documents. 8.4 The CITY'S duties in respect to providing lands and easements are set forth in Paragraphs 4.1 and 4.2. 8.5 The CITY shall have the right to take possession of and use any completed or partially completed portions of the Work, notwithstanding the fact that the time for completing the entire Work or any portion thereof may not have expired; but such taking possession and use shall not be deemed an acceptance of any Work not completed in accordance with the Contract Documents. 67 ARTICLE 9 — CONSULTANTS' STATUS DURING CONSTRUCTION City's Representative: 9.1 The CONSULTANT shall be the CITY'S representative during the construction period. The duties and responsibilities and the limitations of authority of the CONSULTANT as the CITY'S representative during construction are set forth in Articles 1 through 16 of these General Conditions and shall not be extended without written consent of the CITY and the CONSULTANT. 9.1.1 The CONSULTANT's decision, in matters relating to aesthetics, shall be final, if within the terms of the Contract Documents. 9.1.2 Except as may be otherwise provided in this contract, all claims, counterclaims, disputes and other matters in question between the CITY and the CONSULTANT arising out of or relating to this Contract or the breach thereof, shall be decided in a court of competent jurisdiction within the State of Florida. Visits to Site: 9.2 The CONSULTANT shall provide an inspector to make periodic visits to the site at each phase of construction to observe the progress and quality of the executed Work and to determine if the Work is proceeding in accordance with the Contract Documents. His efforts shall be directed toward providing assurance for the CITY and all applicable regulatory agencies that construction is in compliance with the Construction Documents and applicable laws, rules and regulations. On the basis of these on site - observations as an experienced and qualified design professional, he shall keep the CITY informed of the progress of the Work and shall guard the CITY against defects and deficiencies in the Work of CONTRACTOR. Clarifications and Interpretations: 9.3 The CONSULTANT shall issue, with reasonable promptness, such written clarifications or interpretations of the Contract Documents (in the form of Drawings or otherwise) as it may determine necessary, which shall be consistent with, or reasonably inferable from, the overall intent of the Contract Documents. If the CONTRACTOR seeks an increase in the Contract Price or extension of Contract Time based on a written clarification and /or interpretation it shall be required to submit a timely claim as provided in Articles 11 and 12. Measurement of Quantities: 9.4 All Work completed under the Contract shall be measured by the CONSULTANT according to the United States Standard Measures. All linear surface measurements shall be made horizontally or vertically as required by the item measured. Rejecting Defective Work: 9.5 The CONSULTANT shall have authority to disapprove or reject Work that is "Defective Work" as defined in Article 1. It shall also have authority to require special inspection or testing of the Work including Work fabricated on or off site, installed or completed as provided. In the event that the CONSULTANT requires testing of completed Work, the cost of such inspections and /or testing shall be approved in writing by the CITY. All consequential cost of such inspections and testing, including but not limited to the cost of testing and inspection, the cost of repairing any of the Work, or the work of others, the cost to move furniture and equipment and /or the cost to provide alternative facilities until the repair work can be completed, shall paid by the CONTRACTOR if the Work is found to be Defective Work. Shop Drawings, Change Orders and Payments: 9.6 In connection with the CONSULTANT responsibility as to Shop Drawings and samples, see paragraphs 6.25 through 6.28, inclusive. 9.7 In connection with the CONSULTANT's responsibility for Change Orders see Articles 10, 11, and 12. 9.8 In connection with the CONSULTANT responsibilities with respect to the Application for Payment, etc., see Article 14. Decisions on Disagreements: 9.10 The CONSULTANT shall be the initial interpreter of the Construction Documents. 68 Limitations on Consultant's Responsibilities: 9.11 The CONSULTANT will not be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions and programs incident thereto. 9.12 The CONSULTANT will not be responsible for the acts or omissions of the CONTRACTOR, or any Subcontractors, or any of their agent, servants or employees, or any other person performing any of the Work under or through them. ARTICLE 10 - CHANGES IN THE WORK 10.1 Without invalidating the Contract, the CITY may, at any time or from time to time, order additions, deletions or revisions in or to the Work which shall only be authorized by a written Change Orders. Upon receipt of a Change Order, the CONTRACTOR shall proceed with the Work involved. All such Work shall be performed under the applicable conditions of the Contract Documents. If any authorized written Change Order causes an increase or decrease in the Contract Price or an extension or shortening of the Contract Time, an equitable adjustment will be made as provided in Article 11 or Article 12. A written Change Order signed by the CITY MANAGER and the CONTRACTOR indicates their agreement to the terms of the Change Order. All Change Orders shall be certified by the CONSULTANT as to the appropriateness and value of the change in the Work as well as to any change in the time to complete the Work under the circumstances. The failure to include a time extension in the Change Order or in the request for a change order shall result in a waiver of any extension of time due to the change in the work as reflected in the Change Order. 10.2 The CONSULTANT may authorize minor changes or alterations in the Work not involving extra cost and not inconsistent with the overall intent of the Contract Documents without the need for a formal written Change Order provided the CONTRACTOR does not request additional time or additional compensation. These may be accomplished by a written Field Order. If the CONTRACTOR believes that any change or alteration authorized by the CONSULTANT's Field Order would entitles the CONTRACTOR to an increase in the Contract Price or extension of Contract Time, it must submit a written notice of intent to demand a Change Order within twenty four (24) hours of the issuance of the Field Order and submit a written proposal for Change Order within four (4) days thereafter, otherwise the CONTRACTOR shall be deemed to have waived such claim. 10.3 Additional Work performed by the CONTRACTOR without authorization of a written Change Order shall not entitle it to an increase in the Contract Price or an extension of the Contract Time, except in the case of an emergency as provided in paragraph 6.22 and except as provided in paragraph 10.2. 10.4 The CITY will execute appropriate Change Orders prepared by the CONSULTANT covering changes in the Work, to be performed as provided in paragraph 4.4, and Work performed in an emergency as provided in paragraph 6.22 and any other claim of the CONTRACTOR for a change in the Contract Time or the Contract Price which is approved by the CONSULTANT. 10.5 It is the CONTRACTOR'S responsibility to notify its Surety of any changes affecting the general scope of the Work or change in the Contract Price or Contract Time and the amount of the applicable bonds shall be adjusted accordingly. The CONTRACTOR shall furnish proof of such an adjustment to the CITY before commencement of the Change Order Work. The Work shall be stopped until the CONTRACTOR provides such proof of adjustment in the Bond amount and any such delay shall be charged to the CONTRACTOR. ARTICLE 11— CHANGE OF CONTRACT PRICE 11.1 The Contract Price constitutes the total compensation payable to the CONTRACTOR for Performing the Work. All duties, responsibilities and obligations assigned to or undertaken by the CONTRACTOR shall be at its expense without changing the Contract Price. 11.2 The CITY may, at any time, without written notice to the sureties, by written order designated or indicated to be a Change Order, make any change in the Work within the general scope of the Contract, including but not limited to changes to or in: 11.2.1 Specifications (including drawings and designs); 69 11.2.2 Method or manner of performance of the Work. 11.2.3 CITY- furnished facilities, equipment, materials, services, or site; or 11.2.4 Acceleration in the performance of the Work. 11.3 Except as provided in this section, or sections referred to in this section, no order, statement, or conduct of the CITY shall be treated as a Change Order or entitle the CONTRACTOR to an equitable adjustment unless and until the change in the Work is specifically and expressly provided for in a written Change Order, or as otherwise provided in another section of the Contract Documents. 11.4 When a Change Order is issued by the CONSULTANT and signed by the CITY or issued by the CITY in writing, the CONTRACTOR shall perform the Work even if the CONTRACTOR does not agree with the dollar amount of the Change Order. If any Change Order causes an increase or decrease in the CONTRACTOR'S cost of, or the time required for, the performance of any part of the Work under this Contract, for which the CITY and the CONTRACTOR cannot reach a timely agreement, an equitable adjustment based on the cost of the Work shall be made and the Contract modified accordingly. 11.5 If the CONTRACTOR intends to assert a claim for an equitable adjustment or contest the equitable adjustment made by the CONSULTANT, it shall, within ten (10) calendar days after receipt of a written Change Order, submit to the CITY and CONSULTANT a written notice including a statement setting forth the general nature and monetary extent of such claim for equitable adjustment, time extension requested and supporting data. In determining the cost of the Change Order, the costs shall be limited to those listed in section 11.7 and 11.8. 11.6 No claim by the CONTRACTOR for an equitable adjustment hereunder shall be allowed if not submitted in accordance with this section or if asserted after final payment under this Contract. 11.7 The value of any Work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: 11.7.1 By negotiated lump sum. 11.7.2 On the basis of the reasonable cost and savings that results from the change in the Work plus a mutually agreed upon fee to the CONTRACTOR to cover overhead and profit not to exceed 15 %. If the CONTRACTOR disagrees with the CONSULTANTS determination of reasonable costs, the CONTRACT shall provide a list of all costs together with backup documentation 11.8 The term cost of the Work means the sum of all direct extra costs necessarily incurred and paid by the CONTRACTOR in the proper performance of the Change Order. Except as otherwise may be agreed to in writing by CITY, such costs shall be in amounts no higher than those prevailing in Miami -Dade County and shall include only the following items: 11.8.1 Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the Work described in the Change Order under schedules of job classifications agreed upon by CITY and CONTRACTOR. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall be limited to: salaries and wages, plus the costs of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay applicable thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing Work after regular working hours, on Sunday or legal holidays shall be included in the above only if authorized by CITY and provided it was not in any way, whether in whole or in part the result of the fault of the CONTRACTOR due to negligence of the CONTRACTOR or those acting by or through him or due in whole or in part to Defective Work of the CONTRACTOR. 11.8.2 Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage, and manufacturers' field services required in connection therewith. The CONTRACTOR shall notify the CITY of all cash discounts that are available and offer the CITY the opportunity to deposit funds with the CONTRACTOR for the payment for items that offer a discount. Cash discounts shall accrue to CONTRACTOR unless the CONTRACTOR fails to timely notify the CITY of the discounts or if the CITY deposits funds with CONTRACTOR with which to 70 make payments in which cases the cash discounts shall accrue to the CITY. All trade discounts, rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to CITY, and CONTRACTOR shall make provisions so that they may be obtained. 11.8.3 Payments made by CONTRACTOR to the Subcontractors for Work performed by Subcontractors. If required by CITY, CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to him and shall deliver such bids to CITY who will then determine, with the advice of the CONSULTANT, which Bids will be accepted. No subcontract shall be a cost plus contract unless approved in writing by the CITY. If a Subcontract provides that the Subcontractor is to be paid on the basis of Cost of Work plus a fee, the cost of the Work shall be determined in accordance this section 11.8 and in such case the word "Subcontractor" shall be substituted for the word "CONTRACTOR ". 11.8.4 Rentals of all construction equipment and machinery, except hand tools, and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by CITY with the advice of CONSULTANT, and the costs of transportation, loading, unloading, installation, dismantling and removal thereof - all in accordance with terms of said rental agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work. 11.8.5 Sales, use or similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by any governmental authority. 11.8.6 Payments and fees for permits and licenses. Costs for permits and licenses must be shown as a separate item. 11.8.7 The cost of utilities, fuel and sanitary facilities at the site. 11.8.8 Minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the Work. 11.8.9 Cost of premiums for additional Bonds and insurance required solely because of changes in the Work, not to exceed two percent (2 %) of the increase in the Cost of the Work. 11.9 The term Cost of the Work shall NOT include any of the following: 11.9.1 Payroll costs and other compensation of CONTRACTOR'S officers, executives, principals (of partnership and sole proprietorships), general managers, CONSULTANTS, architects, estimators, lawyers, agents, expediters, timekeepers, clerks and other personnel employed by CONTRACTOR whether at the site or in its principal or a branch office for general administration of the Work and not specifically included in the schedule referred to in Subparagraph 11.5. 11.9.2 Expenses of CONTRACTOR'S principal and branch offices other than its office at the site. 11.9.3 Any part of CONTRACTOR'S capital expenses, including interest on CONTRACTOR'S capital employed for the Work and charges against CONTRACTOR for delinquent payments. 11.9.4 Cost of premiums for all bonds and for all insurance policies whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same (except as otherwise provided in Subparagraph 11.8.9). 11.9.5 Costs due to the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective work, disposal of materials or equipment wrongly supplied and making good any damage to property. 11.9.6 Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in Paragraph 11.8. 11.10 The CONTRACTOR'S fee which shall be allowed to CONTRACTOR for its overhead and profit shall be determined as follows: 11.10.1 A mutually acceptable firm fixed price; or if none can be agreed upon. 11.10.2 A mutually acceptable fixed percentage (not to exceed 15 %). 11.11 The amount of credit to be allowed by CONTRACTOR to CITY for any such change which results in a net decrease in cost will be the amount of the actual net decrease in costs calculated in the same manner as 71 provided in 11.8. When both additions and credits are involved in any one change, the net shall be computed to include overhead and profit, identified separately, for both additions and credit, provided however, the CONTRACTOR shall not be entitled to claim lost profits for any Work not performed. ARTICLE 12 - TIME FOR COMPLETION, LIQUIDATED DAMAGES AND CHANGE OF THE CONTRACT TIME 12.1 Time is of the essence to this contract and the date of beginning and the time for completion of the Work are essential conditions of the Contract. Therefore, the Work shall be commenced on the date specified in the Notice to Proceed and completed within the time specified for completion of the work. 12.2 The CONTRACTOR shall proceed with the Work at such rate of progress to ensure full completion within the Contract Time. It is expressly understood and agreed, by and between the CONTRACTOR and the CITY, that the Contract Time for the completion of the Work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the Work. No extension of time shall be granted due conditions that the Contractor knew of or should have known of before bidding on the project or due to inclement weather, except as provided in section 12.7. 12.3 If the CONTRACTOR shall fail to complete the Work within the Contract Time, or extension of time granted by the CITY, then the CONTRACTOR shall pay to the CITY the amount of liquidated damages as specified in the Contract Documents for each calendar day after the scheduled date for completion as adjusted by written Change Orders that extended the completion date. 12.3.1 These amounts are not penalties but are liquidated damages incurred by the CITY for its inability to obtain full use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained as a consequence of such delay, and both parties desiring to obviate any question or dispute concerning the amount of said damages and the cost and effect of the failure of CONTRACTOR to complete the Contract on time. The above - stated liquidated damages shall apply separately to each phase of the Project for which a time for completion is given. 12.3.2 CITY is authorized to deduct the liquidated damages from monies due to CONTRACTOR for the Work under this Contract. 12.4 The Contract Time may only be changed by a written Change Order. Any claim for an extension in the CONTRACT TIME shall be based on written notice delivered to the CITY and CONSULTANT within five (5) business days of the occurrence of the event giving rise to the claim and stating the general nature of the claim including supporting data. All claims for adjustment in the Contract Time shall be evaluated and recommended by the CONSULTANT, with final approval by the CITY'S representative. Any change in the Contract Time resulting from any such claim shall be incorporated in a written Change Order. 12.5 All time limits stated in the Contract Documents are of the essence of the Contract. 12.6 No claim for delay shall be allowed because of failure to furnish Drawings before the expiration of fourteen (14) calendar days after demand has been made in writing to the CONSULTANT for such Drawings. Furthermore, there shall be no monetary compensation for such delay and the CONTRACTOR's sole remedy shall be an extension of time for the period of delay. 12.7 Extensions to the Contract Time for delays caused by the effects of inclement weather shall not be granted unless the weather was unusual for South Florida and could not have been anticipated, the abnormal weather is documented by records from the national weather service and the abnormal weather is documented to have had a substantial affected on the construction schedule. 12.8 No Damages for Delay: The CONTRACTOR agrees that he shall not have any claim for damages due to delay unless the delay exceeds 6 months, whether individually or cumulatively, and then the damages shall be limited to increased cost of materials that were unanticipated and that would not have been incurred but for the delay. Other than as set forth above, the only remedy for any delay shall be limited to an extension of time as provided for in Section 12.4 which shall be the sole and exclusive remedy for such resulting delay. Other than as set forth above, CONTRACTOR shall not be entitled to an increase in the Contract Price or payment or compensation of any kind from CITY for direct, indirect, consequential, 72 impact or other costs, expenses or damages, including but not limited to, costs of acceleration or inefficiency, overhead or lost profits, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable. 12.9 The CONTRACTOR waives all claims that are not presented to the City in writing on or before the 21" day following the date of the event upon which the claim is based. ARTICLE 13 - GUARANTEE 13.1 The CONTRACTOR shall guarantee and unconditionally warrant through either the manufacturer or the CONTRACTOR directly, all materials and equipment furnished and Work performed for patent Defective Work for a period of one (1) year from the date of Final Acceptance as indicated in the CONSULTANT Letter of Recommendation of Acceptance or from the date when the defect was first observable, whichever is later. The same guarantee and unconditional warranty shall be extend for five (5) years from the date of Final Acceptance as indicated in the CONSULTANT Letter of Recommendation of Acceptance for latent Defective Work. The CITY will give notice of observed defects with reasonable promptness. In the event that the CONTRACTOR should fail to commence to correct such Defective Work within ten (10) calendar days after having received written notice of the defect, or should the CONTRACTOR commence the corrective work, but fail to prosecute the corrective work continuously and diligently and in accordance with the Contract Documents, applicable law, rules and regulations, the CITY may declare an event of default, terminate the Contract in whole or in part and cause the Defective Work to be removed or corrected and to complete the Word at the CONTRACTOR's expense, and the CITY shall charge the CONTRACTOR the cost thereby incurred. The Performance Bond shall remain in full force and effect through the guarantee period. 13.2 The specific warranty periods listed in the Contract Documents, if different from the period of time listed in Section 13.1, shall take precedence over Section 13.1. ARTICLE 14 - PAYMENTS AND COMPLETION Payments to Contractor 14.1 The Contractor shall not be entitled to any money for any work performed before the issuance of a Notice to Proceed on the form described in the Contract Documents and the issuance by the City of a "purchase order ", or any other document, does not and shall not authorize the commencement of the Work. At least ten (10) calendar days before each progress payment falls due (but not more often than once a month), the CONTRACTOR shall submit to the CONSULTANT a partial payment estimate filled out and signed by the CONTRACTOR covering the Work performed during the period covered by the partial payment estimate and supported by such data as the CONSULTANT may reasonably require. All progress payment applications after the first progress payment shall be accompanied by partial releases of lien executed by all persons, firms and corporations who have furnished labor, services or materials incorporated into the work during the period of time for which the previous progress payment was made, releasing such claims and lien rights, if any, of those persons. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at or near site, the partial payment estimate shall also be accompanied by such supporting data, satisfactory to the CITY, which establishes the CITY'S title to the material and equipment as well as certificates of insurance providing coverage for 100% of the value of said material and equipment covering the material and equipment from all casualties as well as theft, vandalism, fire and flood. The CONTRACTOR shall replace at its expense any stored materials paid for which are either damaged or stolen before installation. The CONSULTANT will within ten (10) calendar days after receipt of each partial payment estimate, either certifying in writing its approval of payment and present the partial payment estimate to the CITY, or return the partial payment estimate to the CONTRACTOR, indicating in writing his reasons for refusing to approve payment. In the latter case, the CONTRACTOR may make the necessary corrections and resubmit the partial payment estimate. The CITY, will within 73 thirty (30) calendar days of presentation to it of any approved partial payment estimate, pay the CONTRACTOR a progress payment on the basis of the approved partial payment estimate. The CITY shall retain ten (10 %) percent of the amount of each payment until Final Completion and Acceptance of all Work covered by the Contract Documents. Any interest earned on the retainage shall accrue to the benefit of the CITY. 14.2 The CONTRACTOR, before it shall receive final payment, shall deliver to the CITY a Contractor's Final Payment Affidavit as set forth in the Florida Construction Lien Statute as well as final releases of lien executed by all persons who have performed or furnished labor, services or materials, directly or indirectly, which was incorporated into the Work. If any person refuses to provide such a release or provides a conditional release, the CITY shall have the right to issue a joint check made payable to the CONTRACTOR and such person. Contractor's Warranty of Title 14.3 The CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by an Application for Payment whether the Work, material or equipment is incorporated in the Project or not, shall have passed to the CITY prior to the making of the Application for Payment, free and clear of all liens, claims, security interest and encumbrances (hereafter in these General Conditions referred to as "Liens "); and that no Work, materials or equipment, covered by an Application for Payment, will have been acquired by the CONTRACTOR or by any other person performing the Work at the site or furnishing materials and equipment for the Project, under or pursuant to an agreement under which an interest therein or encumbrance thereon is retained by the seller or otherwise imposed by the CONTRACTOR or such other person. Approval of Payment 14.4 The CONSULTNT's approval of any payment requested in an Application for Payment shall constitute a representation by him to the CITY, based on the CONSULTANT's on site observations of the Work in progress as an experienced and qualified design professional and on his review of the Application for Payment and supporting data, that the Work has progressed to the point indicated in the Application for Payment; that, to the best his knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning Project upon substantial completion as defined in Article 1, to the results of any subsequent tests called for in the Contract Documents and any qualifications stated in his approval); and that the CONTRACTOR is entitled to payment of the amount approved. However, by approving, any such payment the CONSULTANT shall not thereby be deemed to have represented that he made exhaustive or continuous on -site observations to check the quality or the quantity of the Work, or that he has reviewed the means, methods, techniques, sequences and procedures of construction or that he had made any examination to ascertain how or for what purpose the CONTRACTOR has used the moneys paid or to be paid to him on account of the Contract Price, or that title to any Work, materials, or equipment has passed to the CITY free and clear of any liens. 14.5 The CONTRACTOR shall make the following certification on each request for payment: "I hereby certify that the labor and materials listed on this request for payment have been used in the construction of this Work and that all materials included in this request for payment and not yet incorporated into the construction are now on the site or stored at an approved location, and payment received from the last request for payment has been used to make payments to all his Subcontractors and suppliers, except for the amounts listed below beside the names of the persons who performed work or supplied materials ". In the event that the CONTRACTOR withholds payment from a Subcontractor or Supplier, the same amount of money shall be withheld from the CONTRACTOR's payment until the issue is resolved by written agreement between them and then a joint check shall be made payable to the person in question and the CONTRACTOR in accordance with the settlement agreement, otherwise the money shall be held by the CITY until a judgment is entered in favor of the CONTRACTOR or the person, in which case the 74 money shall be paid according with said judgment. Nothing contained herein shall indicate an intent to benefit any third persons who are not signatories to the Contract. 14.6 The CONSULTANT may refuse to approve the whole or any part of any payment if, in its opinion, it is unable to make such representations to the CITY as required this Section 14. It may also refuse to approve any payment, or it may void any prior payment application certification because of subsequently discovered evidence or the results of subsequent inspection or tests to such extent as may be necessary in its opinion to protect the CITY from loss because: 14.6.1 of Defective Work, or completed Work has been damaged requiring correction or replacement, 14.6.2 the Work for which payment is requested cannot be verified, 14.6.3 claims of Liens have been filed or received, or there is reasonable evidence indicating the probable filing or receipt thereof, 14.6.4 the Contract Price has been reduced because of modifications, 14.6.5 the CITY has correct Defective Work or completed the Work in accordance with Article 13. 14.6.6 of unsatisfactory prosecution of the Work, including failure to clean up as required by paragraphs 6.29 and 6.30, 14.6.7 of persistent failure to cooperate with other contractors on the Project and persistent failure to carry out the Work in accordance with the Contract Documents, 14.6.8 of liquidated damages payable by the CONTRACTOR, or 14.6.9 of any other violation of, or failure to comply with provisions of the Contract Documents. 14.7 Prior to Final Acceptance the CITY, with the approval of the CONSULTANT, may use any completed or substantially completed portions of the Work provided such use does not interfere with the CONTRACTOR's completion of the Work. Such use shall not constitute an acceptance of such portions of the Work. 14.8 The CITY shall have the right to enter the premises for the purpose of doing Work not covered by the Contract Documents. This provision shall not be construed as relieving the CONTRACTOR of the sole responsibility for the care and protection of the Work, or the restoration of any damaged Work except such as may be caused by agents or employees of the CITY. 14.9 Upon completion and acceptance of the Work the CONSULTANT shall issue a Certificate attached to the Final Application for Payment that the Work has been accepted by it under the conditions of the Contract Documents. The entire balance found to be due the CONTRACTOR, including the retained percentages, but except such sums as may be lawfully retained by the CITY, shall be paid to the CONTRACTOR within thirty (30) calendar days of completion and acceptance of the Work. 14.10 Upon The awarded CONTRACTOR will be strongly encouraged to register as an ePayables Vendor with the City. The Bank of America ePayables Solution is an automated card payment process that shifts accounts payable disbursements to corporate purchasing cards. ePayables, streamline the process of making payments to your organization going forward, the City will provide the CONTRACTOR with a credit card account number to keep on file. This card has unique security features, with $0 of available funds until an invoice is approved for payment. After an invoice has received proper and complete approval, an electronic remittance advice will be sent via e-mail, or fax, which notifies the CONTRACTOR that the funds have been transferred in to the account linked to the card for the amount listed on the invoice and /or remittance email. Please refer to the ePayables Questions & Answers Form contained in this RFP or contact the CITY's Finance department at (305) 663 -6343 with any questions. Acceptance of Final Payment as Release 14.11 The Acceptance by the CONTRACTOR of Final Payment shall be and shall operate as a release to the CITY and a waiver of all claims and all liability to the CONTRACTOR other than claims previously filed and unresolved. The waiver shall include all things done or furnished in connection with the Work and for every act and neglect of the CITY and others relating to or arising out of this Work. Any payment, however, final or otherwise, shall not release the CONTRACTOR or its sureties from any obligations under the Contract Documents or the Performance Bond and Payment Bonds. 75 14.12 The CONSULTANT may void any certification of Substantial Completion or Final Completion of the Work as may be necessary in his opinion to protect the CITY from loss if he determines, because of subsequently discovered evidence or the results of subsequent inspection or tests, that: 14.12.1 the Work is defective, or that the completed Work has been damaged due to the fault of the CONTRACTOR or any individual or entity operating under or through it requiring correction or replacement to the extent that the project is no longer Substantially Completed, or in the case of Final Completion certification, is no longer Finally Competed. 14.12.2 the Work necessary to be completed for the purpose of certifying the work as being Substantially Completed or Finally Completed cannot be verified, 14.12.3 claims or Liens have been filed or received, or there is reasonable evidence indicating the probable filing or receipt thereof that, if valid and paid, would reduce the amount owing to the CONTRACTOR BY 20% in the case of Substantial Completion and 5% in the case of Final Completion. 14.12.5 there is Defective Work the value of which, if deducted from the contract price would reduce the amount owing to the CONTRACTOR BY 20% in the case of Substantial Completion and 5% in the case of Final Completion. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.1 The CITY may, at any time and without cause, suspend the Work or any portion thereof for a period of not more than ninety (90) calendar days by notice in writing to the CONTRACTOR and the CONSULTANT, which shall fix the date on which Work shall be resumed. The CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to any suspension and if a claim is timely made and if it is allowed under the terms of Articles 11 or Article 12. City May Terminate 15.2 If the CONTRACTOR is adjudged bankrupt or insolvent, or if he makes a general assignment for the benefit of its creditors, or if a trustee or receiver is appointed for the CONTRACTOR or for any its property, or if he files a petition to take advantage of any debtor's act, or to reorganize under bankruptcy or similar laws, or if he repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if he repeatedly fails to make prompt payments to Subcontractors or for labor, materials or equipment or he disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction, or if he disregards the authority of the CONSULTANT, or if he otherwise violates any provision of, the Contract Documents, then the CITY may, without prejudice to any other right or remedy and after giving the CONTRACTOR and the Surety seven (7) calendar days written notice, terminate the services of the CONTRACTOR and take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the CONTRACTOR, and finish the Work by whatever method it may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect costs of completing the Project, including compensation for additional professional services, such excess shall be paid to the CONTRACTOR. If such costs exceed such unpaid balance, the CONTRACTOR or the Surety on the Performance Bond shall pay the difference to the CITY. Such costs incurred by the CITY shall be determined by the CONSULTANT and incorporated in a Change Order. If after termination of the CONTRACTOR under this Section, it is determined by a court of competent jurisdiction for any reason that the CONTRACTOR was not in default, the rights and obligations of the CITY and the CONTRACTOR shall be the same as if the termination had been issued pursuant to Section 15.5 15.3 Where the CONTRACTOR'S services have been so terminated by the CITY said termination shall not affect any rights of the CITY against the CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys by the CITY due the CONTRACTOR shall not release the CONTRACTOR from liability. 15.4 Upon seven (7) calendar days written notice to the CONTRACTOR and the CONSULTANT, the CITY may, without cause and without prejudice to any other right or remedy, elect to terminate the Contract for the 76 convenience of the CITY. In such case, the CONTRACTOR shall be paid for all Work executed and accepted by the CITY as of the date of the termination, minus any deduction for damage or Defective Work. No payment shall be made for profit for Work which has not been performed. Removal of Equipment 15.5 In the case of termination of this Contract before completion for any cause whatever, the CONTRACTOR, if notified to do so by the CITY, shall promptly remove any part or all of its equipment and supplies from the property of the CITY. Should the CONTRACTOR not remove such equipment and supplies, the CITY shall have the right to remove them at the expense of the CONTRACTOR and the CONTRACTOR agrees that the CITY shall not be liable for loss or damage to such equipment or supplies. Equipment and supplies shall not be construed to include such items for which the CONTRACTOR has been paid in whole or in part. Contractor May Stop Work or Terminate 15.6 If, through no act or fault of the CONTRACTOR, the Work is suspended for a period of more than ninety (90) calendar days by the CITY or by order of other public authority, or under an order of court or the CONSULTANT fails to act on any Application for Payment within thirty (30) calendar days after it is submitted, or the CITY fails to pay the CONTRACTOR any sum approved by the CONSULTANT, within thirty (30) calendar days of its approval, and presentation, then the CONTRACTOR may, upon twenty (20) calendar days written notice to the CITY and the CONSULTANT, terminate the Contract. The CITY may remedy the delay or neglect within the twenty (20) calendar day time frame. If timely remedied by the CITY the Contract shall not be considered terminated. In lieu of terminating the Contract, if the CONSULTANT has failed to act on an Application for Payment or the CITY has failed to make any payment as afore said, the CONTRACTOR may upon ten (10) calendar days' notice to the CITY and the CONSULTANT stop the Work until it has been paid all amounts then due. Indemnification of Consultant. 15.7 The CONTRACTOR and the CITY hereby acknowledges that the CONSULTANT may be reluctant to rule on any disputes concerning the Contract Documents or on the performance of the CONTRACTOR or the CITY pursuant to the terms of the Contract Documents. Therefore, the CITY or the CONTRACTOR, at the CONSULTANT's request, agree to provide the CONSULTANT with a written indemnification and hold harmless agreement to indemnify and hold the CONSULTANT harmless before the CONSULTANT makes an interpretation, de- certifies a payment application, decertifies Substantial Completion, decertifies Final Completion, certifies an event of default, or approves any action which requires the approval of the CONSULTANT, ARTICLE 16 - MISCELLANEOUS 16.1 Whenever any provision of the Contract Documents requires the giving of written notice it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last known business address. 16.2 The Contract Documents shall remain the property of the CITY. The CONTRACTOR and the CONSULTANT shall have the right to keep one record set of the Contract Documents upon completion of the Project. 16.3 The duties and obligations imposed by these General Conditions, Special Conditions and Supplemental Conditions, if any, and the rights and remedies available hereunder, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by the Contract Documents and the rights and remedies available to the CITY and CONSULTANT thereunder, shall be in addition to, and shall not be construed in any way as a limitation of, any rights and remedies available by law, by special guarantee or by other provisions of the Contract Documents. 16.4 Should the CITY or the CONTRACTOR suffer injury or damage to its person or property because of any error, omission, or act of the other or of any of their employees or agents or others for whose acts they are legally liable, claim shall be made in writing to the other party within twenty one (21) calendar days of the first observance of such injury or damage. 77 ARTICLE 17 - WAIVER OF JURY TRIAL 17.1 CITY and CONTRACTOR knowingly, irrevocably voluntarily and intentionally waive any right either may have to a trial by jury in State or Federal Court proceedings in respect to any action, proceeding, lawsuit or counterclaim arising out of the Contract Documents or the performance of the Work thereunder. ARTICLE 18 - ATTORNEYS FEES JURISDICTION / VENUE / GOVERNING LAW 18.1 The Contract shall be construed in accordance with and governed by the law of the State of Florida. 18.2 The parties submit to the jurisdiction of any court of competent jurisdiction in Florida regarding any claim or action arising out of or relating to the Contract or Contract Documents. Venue of any action to enforce the Contract shall be in Miami -Dade County, Florida. 18.3 If either the CITY or CONTRACTOR seeks to enforce the terms of the Contract by court proceedings, the prevailing party shall be entitled to recover all such costs and expenses, including, but not limited to, court costs, and reasonable attorney's fees. 18.4 Except as may be otherwise provided in the Contract Documents, all claims, counterclaims, disputes and other matters in question between the CITY and the CONTRACTOR arising out of or relating to this Contract or the breach thereof, shall be decided in a court of competent jurisdiction within the State of Florida. ARTICLE 19 - PROJECT RECORDS 19.1 The CITY shall have right to inspect and copy during regular business hours at CITY'S expense, the books and records and accounts of CONTRACTOR which relate in any way to the Project, and to any claim for additional compensation made by CONTRACTOR, and to conduct an audit of the financial and accounting records of CONTRACTOR which relate to the Project. CONTRACTOR shall retain and make available to CITY all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three (3) years following final completion of the Project. During the Project and the three (3) year period following final completion of the Project, CONTRACTOR shall provide CITY access to its books and records upon five (5) business day's written notice. ARTICLE 20 - SEVERABILITY 20.1 If any provision of the Contract or the application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to persons or situations other than those as to which it shall have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest extent permitted by law. ARTICLE 21— INDEPENDENT CONTRACTOR 21.1 The CONTRACTOR is an independent CONTRACTOR under the Contract. Services provided by the CONTRACTOR shall be by employees of the CONTRACTOR and s bject to supervision by the CONTRACTOR, and not as officers, employees, or agents of th CITY. Personnel policies, tax responsibilities, social security and health insurance, employee benefts, purchasing policies and other similar administrative procedures, applicable to services rendered u7 er the Contract shall be those of the CONTRACTOR. IN WITNESS WHEREOF, the parties her as part of the Contract on this \1 — day W TNESSES: L R�L4tiv, wr executed the General 20 j 78 acknowledge their inclusion Name( '�((D Title: AUTHENTICATION: OWNER: CITY OF SOUTH MIAMI Signature: Maria Menendez City Clerk Read and Approved as to Form, Language, Legality, and Execution Thereof: Signature: City Attorney Signature: Steven Alexander. City Manager [END OF SECTION] END OF DOCUMENT 79 SECTION 17 APPENDIX [SPACE LEFT INTENTIONALLY BLANK] 80 AIA Document A310 BID BOND KNOW ALL MEN BY THESE PRESENTS, that PLAY SPACE SERVICES, INC. as Principal, hereinafter called the Principal MERCHANTS BONDING COMPANY a corporation duly organized under the laws of the State of IOWA Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF SOUTH MIAMI as Obligee, hereinafter called the Obligee, in the sum of FIVE PERCENT OF THE AMOUNT BID------------ - - -- ------------------- _ -------------------------------------------------------------------------------------------- Dollars for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for: DANTE FASCELL PARK NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal Shall enter into a Contract with t e Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract ocuments with good and sufficient surety for the faithful performance of such Contract and for the prompt payment Rf labor nd material furnished in the prosecution thereof, or in the event of failure of the Principal to enter such Contract and giv such bo or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount pecified said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the ork cov red by llbe said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. / Signed and sealed this 15TH day of MAY, 2013. '51 fitness) (Principal) A(e,S5'14A'� { (Title) (surety) t (Wiin rs) RYAN P.,ROYHROCKI ATTORNEY -IN -FACT AIA DOCUMENT A310-BID BOND - AIA@ -FEBRUARY 1970 ED -THE AMERICAN INSTITUTE Or ARCHITECTS, 1]35 N.Y, AVE.. N,W., WASHINGTON, D.C. MERCHANTS BONDING COMPANY,~ POWER OF ATT0RNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations duly organized under the laws of the State of Iowa (herein collectively called the "Companies "), and that the Companies do hereby make, constitute and appoint, individually, M. Decker Youngman III, Pamela J. Thompson, Ryan P. Rothrock, Steve P. Farmer of Daytona Beach and State of Florida their true and lawful Attorney -in -Fact, with full power and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: TEN MILLION ($10,000,000.00) DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies, and all the acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of- Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of Directors of the Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 24, 2011. The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed" In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 9th day of July 2012 . ,urrren.,,,5„ 10Nq; a,, � • • • •. COCA jRK 0, ?, ®o ` POgq�9� MERCHANTS BONDING COMPANY (MUTUAL) Pp I 00�0p : MERCHANTS NATIONAL BONDING, INC. Zi 6'_ 524 2C33 ?.� 1933 ".... .... Oil- .v STATE OF IOWA r, COUNTY OF POLK ss. ^ ' "' President On this 9th day of July 1 2012 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument is the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first above written. MARANDAGREENWALT ? Commission lion Ex Tres My Commission Expires October 28, 2014 Notary Public, Polk County, Iowa STATE OF IOWA COUNTY OF POLK ss. I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF- ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 15th day of Mav . 2013 . POA 0014 (11111) o��\NPO - 19 �09'• . it q'9.�• ?,L: •z: a'• 33 : c: Secretary THE PERSON(S).OR ENTITY BELOW: BUSINESS PERIOD: OCTOBER 1, 2012 - SEPTEMBER 30, 2013 EXPIRES: SEPTEMBER 30, 2013 PLAY SPACE SERVICES INC ISSUED PURSUANT AND SUBJECTTO FLORIDA STATUTES AND BREVARO COUNTY CODE ISSUANCE 3125 SKYWAY CI R DOES NOT CERTIFY COMPLIANCE WITH ZONING OR OTHER LAWS. MELBOURNE FL 32934 BUSINESSTAX RECEIPT IS SUBJECT TO REVOCATION FOR ZONING VIOLATIONS, AND /OR FAILURE TO MAINTAIN REGULATORY PREREQUISITES AS REQUIRED FOR BUSINESS CLASSIFICATION(S), OR SUBSEQUENT ACTIVITIES, NOTIFYTAX COLLECTOR UPON CLOSING OF BUSINESS. A PERMIT IS REQUIRED TO ADVERTISE (Including with signage)'GOING OUT OF BUSINESS, LISA CULLEN, CFC, BreVard County Tax Collector LOCATION: P 0 Box 2500, Titusville, Florida 32781 -2500 (321) 264 -6910 3125 SKYWAY CIR CITY OF MELBOURNE, FL 32934 UPON CHANGE OF OWNERSHIP OR LOCATION, BUSINESS TAX RECEIPT SHOULD BETRANSFERRED WITHIN 30 DAYS. OWNED BY: PLAY SPACE SERVICES INC CBC059700 LAZARO GONZALEZ, QUALIF BUSINESS CLASSIFICATIONS, DISCLAIMERS,: AND RELATED FEES: PENALTY: 300050 BUILDING CONTR. -CERTIFIED 590501 HAZ WASTE GEN, SURCHARGE 820005 2012- 2013- RECEIPT AMT TOTAL HAZ WASTE CHG EXEMPTIONS: NON EXEMPT $:00 $37.00 $50.00 RCT. NUM TILL DATE AMT PAID PAID - 9473312.0001.0001 HST 09/06/2012 87.00 PLAYS -1 OP ID: MS III/ CERTIFICATE OF LIABILITY INSURANCE �� DATE /1612013 05/15/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Phone: 321 - 214.1990 Insurance and Risk Management Fax: 321. 710.2501 of Florida, LLC 220 Crown Oak Centre Drive Longwood, FL 32750 David CMoss CONTACT David C. Moss PHONE IL No AIC No EKt: EMAIL ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC# msURERA:Great American E &S Ins Co 37532 $ 1,000,000 INSURED Play Space Services, Inc. & Advanced Recreational Concepts LLC INSURER 3:01d Dominion Insurance Company 40231 INSURERC:Bridgefield Employers Ins. Co. 10701 INSURERD: 3125 Skyway Circle INSURERS: $ 2,000,000 Melbourne, FL 32934 -7334 INSURER F $ 2,000,000 -- COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: V THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ( LTR �DDti' TYPE OF INSURANCE BR POLICYNUMBER POLICY EFF MMIDDFYYVY POLICY EXP MMIDOfIVW LIMITS A ' GENERAL LIABILITY X I COMMERCIAL GENERAL LIABILITY CLAIMS -MADE OCCUR PL4434696 01127/2013 0112712014 EACH OCCURRENCE $ 1,000,000 A AGEi6TiENT PREMISES(EaocwOenoe) 5 50,00 MED EXP(Any one person) 5 5,000 PERSONAL &AOV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 .. GEN'L AGGREGATE LIMIT APPLIES PER POLICY PRO- 1 -1LOC 11T I PRODUCTS - COMP /OP AGO $ 2,000,000 -- $ AUTOMOBILE LIABILITY 13 X I ANY AUTO ALL OWNED rX�SCHEDULED AUTOS AUTOS NON -OWNED HIRED AUTOS X AUTOS I'Bl G020313 02/03/2013 02103/2014 COMB / NED SINGLE LIMIT (CEO S 1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per acadent) $ PROPERTY DAMAGE Peraccident $ 5 A X UMBRELLA LIAR EXCESS LIAB X OCCUR CLAIMS MADE UM4434697 0112712013 01/2712014 EACH OCCURRENCE S 1,000,00 AGGREGATE $ 1,000,000 III DID X RETENTIONS 10,000 S WORKERS COMPENSATION AND EMPLOYERS' LIABILITY C I ANY PROPRIETMPARTNERIEXECVTIVE YIN (Mandator, inN RE %CLUDED? If yes d ory in NH) DES6descdbe OF under OPERATIONS DESCRIPTION OF OPERATIONS below 1 NIA 830 -34812 07/24/2012 07/2412013 TH X WCSTATU- DER T DRY LIMITS ER EL. EACH ACCIDENT S 1,000,000 E. L. DISEASE - EA EMPLOYEE S 1,000,000 _ DISEASE m POLICY LIMIT S 1,000,000 I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Project: RFP #PR- DS2013 -01; Dante Fascell Park Poured -In -Place (PIP) Jogging Trail SOUTHMI City of South Miami Attn: City Clerk 6130 Sunset Drive South Miami, FL 33143 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVES w'f�G/ All riahfs reserved ACORD 25 (2010105) The ACORD name and logo are registered marks of ACORD