Addendum_No._4
Page 1 of 2
ADDENDUM No. #4
Project Name: Playground Demolition & New Installation at Four (4)
City Parks
RFP NO. PR2014-15
Date: January 8, 2014
Sent: Fax/E-mail/webpage
This addendum submission is issued to clarify, supplement and/or modify the previously issued
Solicitation, and is hereby made part of the Documents. All requirements of the Documents not
modified herein shall remain in full force and effect as originally set forth. It shall be the sole
responsibility of the bidder to secure Addendums that may be issued for a specific solicitation.
Question #1:
What is overall budget?
Answer to Question #1:
There has not been an overall budget established for this project.
Question #2:
What surfacing is intended for each park?
Answer to Question #2
:
The surfacing for each park is Certified Blow-on Mulch - ADA Certified ASTM F1951.
Playground Mulch must meet HIC (head impact criteria) and application depth of at least 12” to
be fully effective in its safeness and wheelchair accessible.
Question #3
:
Is an ADA walkway required from parking lots to playground sites?
Answer to Question #3
:
An ADA walkway from the parking lots to the playground sites is only required at Fuchs Park.
Page 2 of 2
Question #4:
Dante Park: How many bays are required for the swings?
Answer to Question #4:
Dante Fascell Park requires two (2) bays, (2 tots and 2 belt seats).
Question #5:
What type of Freestanding play equipment does the city desire?
Answer to Question #5:
The City has not specified any type of freestanding play equipment.
Question #6:
Murray Park: Remove existing curbing?
Answer to Question #6:
No, Murray Park does not require the existing curbing to be removed.
Question #7:
Change shape of playground permissible?
Answer to Question #7:
Yes, respondents may change the shape of existing playground footprints at each park location.
IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE
ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATION.