Loading...
Res. No. 047-98-10314RESOLUTION NO.47-98-10314 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI. FLORIDA,AUTHORIZINGTHECITYMANAGERTO DISBURSE THE SUMOF $1,826.77 TOPAYFOR THE REPAIR OF PUBLIC WORKS DEPARTMENT TRASH CRANE TRUCK NO.21-33 AND CHARGING THE DISBURSEMENT TO ACCOUNT NO.1760-519-5240, "EQUIPMENT MAINTENANCE -PARTS". WHEREAS,a Public Works Department trashcrane became inoperative approximately three weeks ago,leaving the trash collection operation without a spare crane,and; WHEREAS,delaying the repair ofthetrashcrane until approval wasgranted would have exposed the operation to the possibility of being left with only one crane if another breakdown was to occur,and; WHEREAS,daily trash collection requires that two cranes be operational. NOWTHEREFORE,BE IT RESOLVEDBYTHEMAYORANDCITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section 1.The City Manager be,and is hereby authorized to disburse the sum of $1,826.77 toDynamic Power Hydraulics,Inc. Section 2.Thatthisresolutionshallbeeffectiveimmediatelyandafteradoption hereof. PASSEDAND ADOPTED this3rdday of March1998. APPROVED: MAYOR ATTEST. WZ^^4^.COMMISSION VOTE:5-0 ~sy Mayor Robaina:Yea (-s Vice Mayor Oliveros:Yea Commissioner Bethel:Yea READAND APPROVED ASTOFORM Commissioner Feliu:Yea ,y y ,/Commissioner Russell:Yea -~€fTY ATTORNEY ' CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM TO:Mayorand Commission DATE:March3,1998 FROM:Dianarmorfis^x—-SUBJECT:Agenda Item # City Manager Commission Meeting, Approval of TrashCraneRepair AftertheFact-Emergency 10 The attached resolution seeks approval fora $1,826.77 expenditure undertaken two weeks agoto repair a "front line"trash crane.The crane required immediate attention, since the operation can not run for a prolonged period without a spare crane. Waiting until today's meeting would have required a delay of over 10 ten working days. During this time,the spare crane (a relatively old vehicle)would be used continuously. Consequently,a crane breakdown would have left the trash collection operation with one crane,orat50percent of capacity.ThissituationwasdocumentedbythePublicWorks Department inits request foran emergency purchase order(see memorandum attached). The above circumstances required that immediate action be taken.Approval ofthe expenditure is therefore recommended. Attachments 82/18/1998 09:42 ^2-17-1993 2:44PM A 3056677806 CITY 50 MIAMI PURCH FROMPUBLIC WKS SO MIAMI 335 261 3761 PAGE 01 o.2 CITY OF SOUTH MIAMI INTEROFFICE MEMORANDUM P6.4 I3&3 TO:Kathy Vazquez DATE:February 17,1998 Central Servjees Supervisor ^./ FROM:-^^an'd^S!c^i|!^SUBJECT:TRASH CRANE REPAIR Public Works DirectcV (DYNAMIC POWER HYDRAULICS) An order form for a crane repair (Veh.#21-33)was sent by Motor Pool Supervisor Pedro Gonzalez.The work required is extensive,and totals $1,826.77.Since this amount is over the $1000 Commission limit,the item will need to go on the next meeting '$agenda "after the fad "(March 3Td). Although costly,this type of repair is not uncommon for a four year old crane that is used over 6 hours daily,five days a week. The repair can not wait until Commission approval since this is one of our "front-line"cranes.Trash collection services can be seriously hampered if the Department operates without a spare crane for a prolonged period. Therefore,it is imperative that a purchase order is provided so that work can proceed with minimum delay. No additional quotations are required,since this price /actors in labor charges due the fact that the crane mechanism is already disassembled at the vendor's shop (necessary for full diagnosis).Any other quotes will be significantly higher due to the labor required to disassemble the crane. As always,your assistance is greatly appreciated. cc:Diana Morris,Interim City Manager Hakeem Oshikoya,Finance Director Pedro Gonzalez,Motor Pool Supervisor mil /0