Res. No. 015-98-10282RESOLUTION NO.15-98-10282
A RESOLUTION OF THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI,
FLORIDA,AUTHORIZING THE CITY MANAGER TO
DISBURSE THE SUM OF $4,650.00 TO LANGO
EQUIPMENT SERVICE,INC.FOR THE DEMOLITION OF
THE MURRAY PARK CONCRETE BUILDING AND
CHARGING THE DISBURSEMENT TO ACCOUNT NO.01-
1750-519-4670 "LANDSCAPE DIVISION -MAINTENANCE
AND REPAIR OF GROUNDS AND STRUCTURES".
WHEREAS,the concrete block building at Murray Park has been determined to
be unsafe due to structural deficiencies,and;
WHEREAS,the only cost effective solution isto demolish the building and
temporarily setup trailer structures suitable fortheusesthe building has provided,and;
WHEREAS,the Public Works Department has obtained quotations from
demolition contractors in other to proceed with the work.
NOW THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA:
Section 1.The following price quotations have been obtained for the
demolition work:
Lango Equipment Service,Inc.
South Florida Clearing,Inc.
Lopefra Corp.
$4,650.00
$5,490.00
$6,850.00
Section 2.The City Manager be authorized to disburse the sum of $4,650.00 to
Lango Equipment Service,Inc.forthe demolition and debris clearing.
Section 3.This resolution shall be effective immediately and upon adoption
hereof.
PASSED AND ADOPTED this 20th dayof January,1998.
ATTEST:
^uH^
CITY CLERK
READ AND APPROVED AS TO FORM
/^G^/L
CITY ATTORNEY *-
^HsfiwbR
COMMISSION VOTE:5-0
Mayor Price:Yea
Vice Mayor Robaina:Yea
Commissioner Bethel:Yea
Commissioner Oliveros:Yea
Commissioner Young:Yea
CITY OF SOUTH MIAMI
INTER-OFFICE MEMORANDUM
TO:Mayorand Commission DATE:January 20,1998
FROM:Diana Morris SUBJECT:Agenda Item #
Interim City Manager Commission Meeting,
January 20,1998
MURRAY PARK BUILDING
DEMOLITION WORK
Approval is sought through the attached resolution foran expenditure to demolish the
small building at Murray Park.The concrete block structure (CBS)building has been
determined tobe unsafe dueto structural deficiencies.Given thetypeand extent of these
deficiencies,correcting themitisnotcosteffective.
Ithasbeen determined bythe Building and Public Works Departments that demolition of
the Murray Park CBS building isthebest option.Tothis end,quotations have been
obtained from three contractors specializing in this work.The low bidder is Lango
Equipment Service,Inc.Their bid is $4,650.00,which includes hauling away all debris
and installing a"sewercap"onthe underground septictank.
Trailer structures willbeprovidedasa temporary measuretoallowforthe continuation
of the park building's current uses.
Authorization is recommended.
Attachments
JUDO--J-..-
Lango Equipment
Service,Inc.
P.O.Box 2637 /Hialeah,FL 33012-0637
(305)822-4646
i/H/0»';-j/1*340
MR:KUOY UE LA TORRE
CI IV OK UuUTH MIAMI
^/O'Jj y-W.75TH AVENUE
SULMH ME AMI FL 33155-
PROPOSAL
JUtf SIlT ADDRESS:6700 S.W.S8TH PC
jr.E*MURRAY PARK
WE HhKl-.BY SUBMIT SPECIFICATIONS AND ESTIMATE FOR:
I-DEMOLITION AND REMOVAL OF ONE-1 STORY CBS DWELLING,
INCLUDING FOUNDATION AND CONCRETE SLAB LOCATED AROUND
bU 11.DING.
;»•••WF WILL SECURE AND PAY FOR DEMOLITION,DERM ftND PLUMBING
i-M-f<Mrnr;.
.3-PRICE:^A,001^.00
'»-WF MUST PROVIDE WITH ASBESTOS SURVEY,COST-.*65®.0(9
•J-EXCLUDESt ASBESTOS REMOVAL.
Wh.ONLY REMOVE CAGETORY I NON-FRIABLE MATERIAL USING
WE-:r METHOD.
(>--LUMP SUM PRICE:U4,fe3«Z>.0O.
<$4J>l<jb.Q>
CMUI.oS A.LOPKZo'CONTRACTOR
HClliOTAKCE UR PROPOSAL
Sent by:LOPEFRA CORP.3052669825 01/07/98 9:10AM Job 56 Page 1/1
Build:
Hrs:
Proc:.
Inv:_
Ref:
LOPEFRA CORP.
2601 S.W.69 CI.*Miami Fl.33155 •(305)266-3896 -(305)266-9825 Fax
Date:AMLX^iiEstimate
^oTVl flfUmn WU'iMk
SIDEWALK
HAUL AWAY FILL
Job:
ACCESS PROBLEM
ASBESTOS PROBLEM
£>(??>~02>&c
ttA -#V\I
DISCONNECT ALL UTILITIES
PERMITS BY US
Uj O&fQA (soap Win i fiMv yp€_Pmnij +
uwnvu \tutv ItVL.lUUlOib.l
f?.€MD\jh,l ip io&cj&s&k&f dL UppifYb
of \Axrret2-.Uwe VH^p/idp^^l-ooe^
f7VfT*fi£l#U ;:
i
.i
r
riom.mexicaei tJtaugpti ii.«•.)>>i -«»iu ;<^<su
PROPOSAL
South Florida Clearing,Inc.
land clearing and demolition
CC#94BS00367
8S86 N.W.187th STREET Phone:(306)82B-3068«(3Q5)829-3664«FAX:(308)828-8572
MIAMI,FLORIDA 33015 Miguel Beeper (305)649-0265»Cellular.(305)778-6666
Proposal #:98001
Date:January 8,1998
Name:Cityof South Miami
Street:4795 S.W.75 Avenue
Suite:
City/State/Zip:South Miami,FL33155
Phone #:(305)663-6350
Fax#:(305)261-3791
Attention:Rudy de la Torre
Job Name:
Street:6700 S.W.58 Place
City:South Miami
State:Florida
PROPOSAL SUBMITTED TO:
WORK TO BE PERFORMED AT:
We hereby propose to furnish all the*materials and perform all the labor necessary for the completion of:
Demolition of structure including footing leaving lot rough grade.Hauling away of all demolition debris.$4,500.00
Sewer Cap 20000
Asbestos Survey by ATC Associates (882-8200)Richard Tong .790.00
"Survey costs can be paid directly to the company performing the survey.Our company is not responsible for the removal of
asbestos.
Our company will not assume the responsibility for the signing of any asbestos affidavit.Affidavit requires testing,and
our company does not include any of those costs in this proposal.The removal of any asbestos is the responsibility of the owner.
All material is guaranteed to be as specified,and the above work tobe performed in according with the drawings and
specification submitted for above work and completed in a substantial workmanlike manner for the sum of:
Dollars $5,490.00
with paymentstobemade as follows:
The balance is due nolater than ten (10)days uponcompletionofjob.
Any alteration or deviation from above specifications involving extra costs,will be executed only upon written orders,and
will become an extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond
our control.Owner to carry fire,tornado and other necessary insurance upon above work.Workman's Compensation and Public
Liability Insurance on above work tobe taken out by:South Florida Clearing,Inc.
Respectfullysubmitted Miguel A.Rodriguez
Per South Florida Clearing,Inc.
Note-This proposalmaybe withdrawn byusifnot accepted within 30days
ACCEPTANCE OF PROPOSAL
The prices,specifications and conditions above are satisfactory and are hereby accepted.You are authorized to do the
work as specified.Payment will bemade as outlinedabove.
Date:Signature:.
Miguel Rodriguez
Date:Signature:.