Loading...
Res No 033-16-14588RESOLUTION NO.:033-16-14588 A Resolution authorizing the City Manager to purchase an electronic fuel monitoring board from Petroleum Testing Services Inc. WHEREAS,the current electronic fuel monitoring board console at CityHall has failed. The system depends on a functioning console forallfuel monitoring requirements;and WHEREAS,a monitoring system is required for all regulatory certifications.The system will provide several major safety measurements,including but not limited to,leak detection, pressure measurements,dispensing fuel levels and tank contamination;and WHEREAS,the City obtained 3 quotes for the purchase of an electronic fuel monitoring board;and WHEREAS,PSR Inc.was the lowest &most responsive bidder;and NOW,THEREFORE,BEIT RESOLVED THE MAYOR AND CITY COMMISSION OFTHECITY OF SOUTH MIAMI,FLORIDA: Section 1.TheCity Manager is authorized to expend $6,840 with PSR Inc.for the purchase of an electronic fuel monitoring board,charged to account number 001-1710-519- 4670 (Repairof Grounds &Structures)witha current balance of $49,122. Section 2.Severability.If any section,clause,sentence,or phrase of this resolution is for any reason held invalid or unconstitutional bya court of competent jurisdiction,this holding shall not affect the validity of the remaining portions of this resolution. Section 3.Effective Date:This resolution shall take effect immediately upon enactment. PASSED AND ENACTED this1 6 t]Tclav of February §2016. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM, LANGUAG^GALlW ANC EXECU;BON THEREOF APPROVED: COMMISSION VOTE:5-0 Mayor Stoddard:yea Vice Mayor Welsh:Yea Commissioner Liebman:Yea Commissioner Edmond:Yea Commissioner Harris:Yea South*1 Miami THE CITY OF PLEASANT LIVING CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM To: Via: From: Date: SUBJECT: BACKGROUND: AMOUNT: ACCOUNT: Support: TheHonorable Mayor &Members ofthe City Commission StevenAlexander,CityManager Kelly Barket Jr.,Director of Public Works February 16,2016 Agenda Item No.11 AResolutionauthorizingtheCity Manager to purchaseanelectronic fuel monitoring boardfromPetroleumTestingServices Inc. The current electronic fuel monitoring board console for the Policefuelpumps atCity Hall has failed.Thesystem depends onafunctioning console for all fuel monitoring requirements. A monitoring system isrequiredfor all regulatorycertifications.The system will provideseveralmajorsafety measurements,includingbut not limitedto,leak detection,pressuremeasurements,dispensing fuel levelsandtank contamination. PSR Inc.willsupplyand install one functional complete VeedeRoot TLS-350 plus monitoring system withintegratedprinterand module and all applicable compliance monitoring sensors,wiring,materials,conduit,tank connections, laborand Final AnnualCertificationasindicatedin option #3on the attached proposal. The monitoringsystemtobe installed is compatible with the current operational system inuseby the City.PSRInc.was the lowest and most responsive bidderand met all requirements of the scope needed forservices. PSR Inc.$6,840.00 Fred Rice LLC.$8,986.00 Branching Out,inc.$9,850.00 $6,840.00 Account No.:001.1710.519.4670 hasa current balance of $49,122 Quote I.PSRInc. Quote 2.Fred Rice LLC. Quote 3.Branching Out,Inc. ReT^GijeuM TesrnNG*Sei*vic:^ PH-954-553-3675 FX-954-572-0806 marty@psrtesting.net Oveeder-rootI Th&faceting autftority for petroleum •and ene^py handling ^quiprrt&nt. Date:2/1/2016 Location:City of South Miami Attn:Eddy Torres. TASK)Repair /Replace non functional OPW Tank monitoring system, PSRInc.willsupply/repair/orreplaceapplicableelementstotheexistingOPWmonitoringsystemdepending onthepreferredproposaloptionslistedbelow.Allnewmaterialsandpartswillbewarrantedforoneyearupon successfulinstallationorrepairandproper functionality. •1)Replace OPW console with a*functionalunit.Consoleto include all capabilities, components,softwareandprogramming.Uponsuccessfulinstallation,determine,if any, remainingissueswiththesystem,additionalcostsmayapply.Thisunitwillbewarrantedforone year from time of installation.Costforthis Task willbe $3,216.00 •2)Supplyandreplaceone OPW EECO 1500 Consolemainboard.Upon successfulinstallation, determine,if any,remaining issueswith monitoring system.Additional costs mayapply. Cost for this Task will be $1,840.00 •3)Supplyandinstallone*functional,completeVeedeRootTLS-350PlusMonitoringsystem withintegratedprinterandmodules,toinclude,TankGaugingProbe,allapplicablecompliance monitoringsensors(annularspaceandsumps),wiring,materials,conduit,tankconnections, labor,andFinalAnnualcertification.CompleteTaskwarrantedforoneyearfrominstallation time.Cost forthisTaskwillbe $6,840.00 *Represents that unit(s)isusedandiscoveredwiththeoneyear manufacturer warranty. Proposal/Task Acceptance: Print name: Date: I.HNIB Thank you. M.Sweet (Marty) ComplianceSpecialist \matic tank gauging am )ns systems Fred Rice LLC. 6607 Do/1/0/7 Rd. FT.Pierce FL 34951 772.464.7177 Estimate:#10094-16 Date 1/4/2016 BILL TO: City of South Miami. 4795 SW 75th Ave S.Miami FL 33155 Attn.Eddie T. SHIP TO: City of South Miami Same Description:Install Veeder-Root TLS-350 Monitoring system. 1]Provide new VeederRoot TLS-350 system complete to include all applicable probes,sensors,materials,and installation. -VeederRoot TLS-350 Console with printer -1 Magnetostrictive Tank Probe -2 Compliance Sensors -1 Conduit,connections,materials -1 Shipping -ITax Sub-total Total Estimated project duration willbetwodays. Approval signature.X_ Print name .X_ Date $4,600.00 $1,800.00 $630.00 $1,840.00 $116.00 N/A $8,986.00 23300 S.W.134 Avenue EB6740 Miami,Florida 33032 PGC055725 ECC001470 Ph:305 258-8101 BraXlChlXig Ollt,IZIC.CGC006150 Fax:305 258-3812 Environmental Engineering Construction CFC057075 January 20,2015 Mr.Eddie Torres City of South Miami etorres@southmiamif1.gov 305-519-6785 RE:Proposal for Electrical construction service Dear Mr,Torres: In accordance withyour request£this proposal for professional construction services is submitted for your consideration and approval. I PURPOSE OF AGREEMENT /PROJECT DESCRIPTION Tasks: Contractor Shall: $L,ProvidenecessarylaborandmaterialstoInstallNew VEEDER ROOT -TMS 300 Console. 2,Provide and install new interstitial leak detection and level probes intankasrequired. 3.Land all leads and provide a complete working package. LumpSumPrice ..*.s 4 ^•**.....v ,,_,,.$9,850.00 Should you have any questions or require additional information, please contact meat (305)258-8101. Very Truly Yours,AS TO CLIENT AUcfiae£S.$u*cAe££ Michael S.Burchell Branching Out,Inc. Environmental Engineering &Construction