Loading...
03-1559-027N REVISION w w Li 1 = QU xi CONTINUOUS RUBBER MAt6 ,1 PROVIDE STUCCO ADDITIONAL cJO LB HOT MOPPED FIN OVER CMU UP TO 4 s W Y w w w Y W w w W W W W : Y WW : . Y WITH CONT CLEAT SHEETS BELOW MATS UNDERSIDE OF PRE -CA5T 1/21/04 REVIEW z rs• — - � Raw= U CA PARAPET CTYP1 P • s WORD o� � � Q W 15790 SW 88TH AVE f ,3. : j i�fH /F CONT. GA V Mt l L L STUCCO STOP FLASHING. CONTINUE Q �W WW WW wW wY WW W.w �YYYWY�YW ..wWw.Wy d 4 �I ' - PRODUCT APPROVED WINDOW _ ., ..:. PER AS SCHEDULE ' 3 _, •.*. .. '- a ; 4 Y: , .. TO UN 51 ROOFING SYSTEM DER. DE A \, xV:E` W W W W W Y Y W W_W W W. Y ww W WWW W Y w , r�tt w. 4 . OF STUCCO STOP WITH CONT. NOTE. F W W W W W W W w W SECOND FLOOR SLAB NOTE: G.G. TO PROVIDE SHOP W W W w W W W W 1 x P.T. WOOD BUCK CONT. AT BEAMS. REFER TO •' DWCx 5 O F PL ANT ER WAT E- _ NOT E G.C. TO PROVIDE SHOP CLEAT AS PER MAN UF, S E G I S. W W W W w W w W W W W W W � ROUGH OPENING. PROOFING TO ARCHITECT TO a ._ '.• .. . . .. . : w DWG 'S OF MEMBRANE TO BE READ IN CONJUNCTION WITH - ETAILS. b . A PPR OV E (n W w . .w W Y W W W W W W W W w w W W W W W W n _ TO ARCHITECT TO APPROVE. ° I a a WINDOW ATTACHED THROUGH WD ARE NOT LIMITED TO: ARCHITECTURAL, SBS MODIFIED GRANULAR GAP SHEET TORCH 556 GRANULAR CAP FLASHING. B � a BUCK INTO GONG AS PER B, +14 APPLIED OVER SIBS MODIFIED 8,45E PLY' LAP MIN 4, ' OVER BASE PLY Y Y.. W w W w W MECHANICAL, ELECTRICAL, SPECIALTY PRODUCT APPROVAL D ATA. � TORCH APPLIED OVER PRIMED CONCR�tE SURFACE. 4 LAP I 4' o . . I 501L INSTA LL. AN PROVIDE MATERIALS AS PER PROJECT D PR D SPECIFICATIONS a 5X12 GONG BEAN TIGHT g 10 PVC LINED WEEP HOLES STRUCTURAL CONCRETE DECK W Y a CONTRACTOR TO VERIFY ALL EXISTING L TY�P WINDOW BUCK DETAIL 36° O.G. At ELEVATION TO a a 4 a ' (�)__SCALE: 1-1/299 1 Q _ TYP �� ®1 DECK WATERFROQFING SITE CONDITIONS AND. THOROUGHLY e : , l BE WITHIN PLANTER DRAINAGE 4 Y Y Y W Y V W W W W W w W W W AT ACCESS WALK AREAS CHECK ELEVATIONS AND DIMENSION S 4 MIN ROOF SYSTEM MODIFIED BIU R MAT. DOOR HEIGHT IN FIELD ,i ,, SCALE. 3 — 1 -0 OVER LIGHTWIEGHT GONG. BEFORE COMMENCING WORK. REPORT TO THE ARCHITECT ENGINEER SLOPED TO DR AIN. W W W w w W W w. Y .. .. .: w W Y W -- t�(J NG DETAIL AT PARAPET TAP WATERPROOFING ANY DISCREPANCIES, ERRORS OR ° a DRYWALL INSULATION SCALE. 1-1/2" 1 0 � Y W Y W Y w w w YW W W_W W WW w W W w w W 4CONDITIONS LAYER OF PEA ROCK OVER FILTER FABRIC TH AT W I LL ALTER TO UNDERSIDE OF SLAB STRUCT PARKING DECK CONSTRUCTION AS INTENDED BY I 4 W Y Wy d a :a � Y W W w W W.' w W . w w W W Y Y Y Y W w w W w W W W w w w W Y Y THESE DRAWINGS. ARCHITECT IS d I SEE M C LANS. a a o m d ti 9 °4 0 0 d m FILTER FABRIC OVER DRAINAGE MAT NOT RESPONSIBLE FOR ANY WORK AND/OR MATERIALS FURNISHED 20GA MTL STUDS @ 16 O.G. TERMINATE ROOFNC� SYSTEM A" ABOVE 501E LINE N REVISION w w Li Y. . W . W w Y W y Y xi 4/IcJ/04 owner REVISION - 4 s W Y w w w Y W w w W W W W : Y WW : . Y WITH CONT CLEAT _ 1/21/04 REVIEW z rs• — - � Raw= • • s WORD W 15790 SW 88TH AVE f ,3. : j i�fH /F Q �W WW WW wW wY WW W.w �YYYWY�YW ..wWw.Wy d 4 MIAMI, FL 331 `7 �. F.r nf'FyS A \, xV:E` W W W W W Y Y W W_W W W. Y ww W WWW W Y w , r�tt w. NOTE. F W W W W W W W w W SECOND FLOOR SLAB NOTE: G.G. TO PROVIDE SHOP W W W w W W W W N fNo, SEAL: •.• UJ O -� U� acv LL 06 J LL Z z LL 0- of d 0� LL U) W D x LU z m 0 0 -c0 NORTH DRAWN BY: MER DATE: 4/19/04 ')CALE: AS NOTED iHEET NO.: I Li Y. . W . W w Y W y Y xi - 4 s W Y w w w Y W w w W W W W : Y WW : . Y WITH CONT CLEAT W 15790 SW 88TH AVE LIGHT'EIXTURE TO BE Q ,. 4' j 5ELEGTEDBYARCHITECT Q �W WW WW wW wY WW W.w �YYYWY�YW ..wWw.Wy d 4 MIAMI, FL 331 `7 SUBMIT SHOP flWGS W W W W W W Y Y W W_W W W. Y ww W WWW W Y w AR 0017521 NOTE. F W W W W W W W w W SECOND FLOOR SLAB NOTE: G.G. TO PROVIDE SHOP W W W w W W W W BEAMS. REFER TO DWCx 5 O F PL ANT ER WAT E- W W W W w W w W W W W W W ALL DRAWINGS FOR THIS PROJECT ARE STRU GTURfL DWGS FOR PROOFING TO ARCHITECT TO : w TO BE READ IN CONJUNCTION WITH ETAILS. ! A PPR OV E (n W w . .w W Y W W W W W W W W w w W W W W W W EACH OTHER. THESE INCLUDE, BUT ° a Y W W W w Y W W Y ARE NOT LIMITED TO: ARCHITECTURAL, ~IN SLAB ELEV 2ND FL L_ I Y W Y Y W W W W w w W W W W Y Y SURVEYING STRUCTURAL CIVIL, +14 ° 4< Y Y.. W w W w W MECHANICAL, ELECTRICAL, SPECIALTY � I 4' o . . Ww w Y ,W w W � w W W W W W W w W 501L DRAWINGS, & WRITTEN SPECIFICATIONS. a 5X12 GONG BEAN TIGHT g 10 PVC LINED WEEP HOLES W Y CONTRACTOR TO VERIFY ALL EXISTING °' � • : , TO BOTT OF SLAB ABOVE 36° O.G. At ELEVATION TO a SITE CONDITIONS AND. THOROUGHLY : , l BE WITHIN PLANTER DRAINAGE Y Y Y W Y V W W W W W w W W W CHECK ELEVATIONS AND DIMENSION S MAT. DOOR HEIGHT IN FIELD 4 a , Y Y w W- W W w W � w W. w w W W W W W BEFORE COMMENCING WORK. REPORT TO THE ARCHITECT ENGINEER W W W w w W W w. Y .. .. .: w W Y W ANY DISCREPANCIES, ERRORS OR ° a DRYWALL INSULATION Y W Y W Y w w w YW W W_W W WW w W W w w W 4CONDITIONS LAYER OF PEA ROCK OVER FILTER FABRIC TH AT W I LL ALTER TO UNDERSIDE OF SLAB STRUCT PARKING DECK CONSTRUCTION AS INTENDED BY x' S O DRAIN. L PE D TO d a :a � Y W W w W W.' w W . w w W W Y Y Y Y W w w W w W W W w w w W Y Y THESE DRAWINGS. ARCHITECT IS I SEE M C LANS. a a o m d ti 9 °4 0 0 d m FILTER FABRIC OVER DRAINAGE MAT NOT RESPONSIBLE FOR ANY WORK AND/OR MATERIALS FURNISHED 20GA MTL STUDS @ 16 O.G. N DUROK SHEATHING AN D ON THE JOB. STUCCO FIN15H All graphic material appearing herein, ISOPREMA ROOFING SYSTEMS" DR AINA GE MAT unless indicated otherwise, are the �. , property of the Architect as 8 s " 4 ° a .4 ° o ittf ice fle) Y instruments o service or use so " SB5 MODIFIED GRANULAR CAP SHEET TORCH on this project, and may not be p J , y - 8X12 GONG LINTEL 6 q : a v q a A a a APPLIED OVER 555 MODIFIED, BASE PLY duplicated, used or disclosed without EE ELEV S o a a d d . TORCH APPLIED OVER PRIMED CONCRETE SURFACE. the written consent of Mark E. J '� G d Q ,.d a INSTALL AND PROVIDE MATERIALS AS PER PROJECT Reardon; R.A. The architect retains SPECIFICATIONS �"Y and other all common law, statutory �. 4 reserved rights. LL II , - W 1L <t Iry U D IN P AGE GONG. PQ RE L COVER BE TWEEN GONG. LOW � �I i TYP PLANTER WATERPROOFING DETAIL A T PARKING DECD WALL AND GMU BLOCK WALL a _� S SCALE: 1 -1 2 — I 1 - 0-� .: fNo, SEAL: •.• UJ O -� U� acv LL 06 J LL Z z LL 0- of d 0� LL U) W D x LU z m 0 0 -c0 NORTH DRAWN BY: MER DATE: 4/19/04 ')CALE: AS NOTED iHEET NO.: I