Loading...
07-790R-006LOW VELOCITY SUPPLY AIR DUCT (SEE PLAN) SPIN -IN FITTING [lII�0m :fj.� INSULATED FLEX. DUCT -FLEXIBLE DUCT SHALL BE SECURED TO THE SLEEVE OR COLLAR WITH A DRAW BAND OPPOSED BLADE DAMPER FLEXIBLE DUCT CONNECTION DETAIL (SIMILAR FOR TRUNK DUCT BOTTOM CONNECTION N.T.S. WHEN CEILING SPACE ALLOWS) HANGER RODS SECURED TO STRUCTURE CTYPICAL AT EACH MOUNTING POINT OF AIR HANDLING UNIT) DX PIPING PLENUM SUPPORT SPRING (TYPICAL) ISOLATORS FLEXIBLE RETURN AIR CONNECTION PLENUM (TYPICAL) � - - - - - - - (SOUND LINED - -� FOR SHEET METAL ------ - - - - -- I UI I I I DUCTWORK) COIL ---- - - - - -- - SECTION I I I I --� INSULATED SUCTION LINE. WITH LIQUID LINE OUTSIDE UNISTRUT WITH PIPE CLAMPS 3' -0" C —C ANCHORED TO FLOOR ---� SUPPLY AIR DUCT FAN I I 1 I SEE PLANS FOR DUCT AND SECTION L - IJ - - - - _ -----J PLENUM DETAILS AND CONNECTIONS OVERFLOW SWITCH IN DRAIN PAN AUX. DRAIN PAN SECURE TO " THICK AILTER AHU. OR SUPPORT FRAME SUPPORT FRAME SEE DETAIL CEILING -/ TYPICAL AIR HANDLING UNIT MOUNTING DETAIL N.T.S. NOTE: WIRE OVERFLOW SWITCH TO SHUT DOWN UNIT WHEN WATER IS SENSED. /_16 GA. GALV. STEEL aLmll L 1/4" WEDGE ANCHORS AT 18" C —C EA. SIDE CONCRETE SLAB DX PIPE COVER ON FLOOR N.T.S. U W H O a W O M M d Q, kn o� •',� r 0� W LL Z H W 2 o N W w W 18 u lw — W °� �wT- U) �M z u �Q Z W co 00 0 CL 1 pig DATE. 05/21/07 PROJ NOs — DWG BYE JEB REV, — Q11/26/07 3 FIELD — CHANGE Q4 02/04/08 CT —ADD M -3 OF 4 HVAC WORK NOTES- MEDICAL OFFICE AREA 1 NEW DUCTWORK SHALL BE R-6 FIBERGLASS DUCTBOARD, WITH AN EROSION PROOF AIR SIDE SURFACE HAVING AN EPA REGISTERED ANTI - MICROBIAL COATING — OWENS CORNING ENDURAGOLD, J PERMACOTE, OR EQUAL, NO SUBSTITUTIONS. FLEXIBLE RUNOUTS TO DIFFUSERS SHALL BE SYNTHETIC CORE WIRE HELIX WITH R-6 FIBERGLASS WRAP WITH VAPOR BARRIER 2 NEW CEILING DIFFUSERS SHALL BE WHITE PERFORATED TYPE WITH ADJUSTABLE PATTERN CONTROLLERS, METALAIRE MODEL 7500 -6 WITH ROUND NECKS, OR EQUAL. NECK SIZE, CFM AND BLOW DIRECTIONS AS 20 GA. 1" GALVANIZED STEEL STRAP NOTED. ALUMRIUM, 3 NEW RETURN AIR GRILLES SHALL BE WHITE PERFORATED TYPE WITH MAXIMUM SIZE NECKS TO MATCH DIFFUSER TYPE. ALUMINUM. 4 NEW CEILING DIFFUSER IN RESTROOMS AND SUPPLY ROOM SHALL BE WHITE, ADJUSTABLE CURVED BLADE TYPE, METALAIRE MODEL L&S, OR EQUAL, 6x6 AND CFM AS NOTED. NOTE: 5 NEW THERMOSTATS FOR AC -1, AC -2 AND AC -6 SHALL BE PROGRAMMABLE 1" STRAP MIN. (TYP.) DUCT SHOULD EXTEND STRAIGHT '' � TYPE WITH A 7 -DAY TIME K. CLOC FOR SEVERAL INCHES FROM A I CONNECTION BEFORE BENDING 6 AC -3 VENTILATION SYSTEM ON-OFF SWITCH SHALL BE WIRED THROUGH �, 5'-0" MAXIMUM �, f, ' -; = THE VARIAN VAULT DOOR OPERATOR COORDINATE WITH THE MAX. SAG. 1 /2" PER FOOT I �; ;�: INSTRUCTIONS PROVIDED BY THE EQUIPMENT PROVIDER, ATOMIC OF SUPPORT SPACING INTERNATIONAL, AND WITH THE ELECTRICAL COI�TTRACTOR AC -3 SEQUENCE OF OPERATION: THE VENTILATION SYSTEM SWITCH OUTSIDE THE VARIAN VAULT STARTS THE AC -3 /CU 3 AND THE INTERLOCK RELAY IN AC -3 STARTS EF -5. AC-3 BLOWER AND EF -5 RUN AT ALL TIMES. THE FACTORY CONTROLLER IN CU-3 OPERATES THE COMPRESSOR AND HOT GAS REHEAT TO PROVIDE DEHUMIDIFIED AIR TO THE VARIAN VAULT 2 "x2 "x4" LONG BETWEEN 65 AND 70 DEG. F. THE ELECTRIC HATER IN THE DISCHARGE 22 GA. ANGLE (TYP.) DUCT SHALL BE ON WHENEVER THE DISCHARGE AIR TEMPERATURE IS NOTES: BELOW 65 DEG.F. SUPPORT SYSTEM MUST NOT DAMAMAGE DUCT OR CAUSE OUT OF ROUND SHAPE 7 DX PIPING SHALL BE ACR TYPE COPPER WITH SILVER BRAZED JOINTS. INSULATE THE SUCTION PIPING WITH 1" THICK ARMAFLEX WITH A 25/50 FLEXIBLE DUCT SUPPORT FIBERGLASS DUCT SUPPORT - SMACNA FIG. 5.01 FLAMFJSMOKE RATING BYUL. NT"S. 8 SIZE DX PIPING AND INSTALL A/C UNITS PER MANUFACTURER' S c; I T Y (N r S'("; U r r 111A ! A M I SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE - SECOND EDITION RECOMMENDATIONS. CONDENSING UNITS SHALL BE LOCATED ON BUILDING C Eiji. EQUIPMENT PLATFORM IN GARAGE ABOVE OFFICE AREA. SEE PARTIAL PLAN M 2 AND DETAILS. iV4 EC Z�ANtCAl. SOI lQN 9 ELECTRICALLY INTERLOCK EF -5 TO RUN WITH AC -3 FAN. APPROVED BY: DALE: U W H O a W O M M d Q, kn o� •',� r 0� W LL Z H W 2 o N W w W 18 u lw — W °� �wT- U) �M z u �Q Z W co 00 0 CL 1 pig DATE. 05/21/07 PROJ NOs — DWG BYE JEB REV, — Q11/26/07 3 FIELD — CHANGE Q4 02/04/08 CT —ADD M -3 OF 4