Loading...
07-780R-016HVAC GENERAL NOTES 1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT 11. REFER TO DETAIL SHEETS AND SPECIFICATIONS IFOR ADDITIONAL EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. INSTALLATION REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS INCLUDING, DUCTWORK LOCATIONS AND SIZES. 12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ® �-- SUPPLY DUCTWORK ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED PROPER MANNER BY CONTRACTOR. USING 45 DEGREE OR LONG RADIUS ELBOWS. 12 20 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK 3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS NECESSARY TO PREPARE THE STRUCTURE FOR 'THE INSTALLATION AS REQUIRED FOR EQUIPMENT CONNECTIONS. AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING OPENINGS AND ANY DAMAGED MATERIALS OR SUURFACES SHALL BE CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. REPAIRED AND FINISHED TO MATCH EXISTING. 4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH 14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES AND TO ALL LOW REQUIREMENTS OF THE OWNER. PRESSURE BRANCH DUCTS TO REHEAT COILS. PROVIDE DAMPERS AS 240 CLOSE AS POSSIBLE TO BRANCH CONNECTION TO MAIN. SEE DIFFUSER 15. PROVIDE TEMPORARY FILTERS ON ALL RETURN NUR GRILLES AND AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL TRANSFER OPENINGS IN THE WORK AREA. INFORMATION. 18. EXISTING SYSTEMS SHOWN ON THE DRAWINGS AIRE BASED ON S. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN AVAILABLE RECORD DRAWINGS. THIS INFORMATIiON IS ONLY PARTIALLY ADVANCE CONSTRUCTION WORK SHALL BE PERFORMED OR REPLACED VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO INVESTIGATE ALL CONDITIONS THAT AFFECTS THIE WORK PRIOR TO THE OWNER. SUBMITTING THE BID. 8. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING 17. INSTALL MU CONTROL PANELS TO PROVIDE FOR 3' -0" MIN. CLEARANCE IN CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE FRONT OF PANS SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 18. UNLESS OTHERWISE NOTED ON PLANS, LOW RETIURN AIR GRILLES AND 7. DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH LOW EXHAUST GRILLES SHALL BE V TO a AFF' TO BOTTOM OF GRILLE PIPING, DUCTWORK, ETC.. (FLANGED OR REMOVABLE SECTIONS MAY BE 19, ALL DIFFUSERS IN SAME SPACE SHALL HAVE ME SAME FULL FACE SIZE USED IN SOME INSTANCES WHERE TIGHT CLEARANCES EXISTS). USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE. 8. NO PIPING, DUCTWORK, OR CONDUIT SHALL BE INSTALLED UNTIL IT IS 20. PROVIDE MANUFACTURERS CERTIFIED DATA (NOVA) OR CALCULATIONS ON COORDINATED PITH ALL OTHER TRADES AFFECTED. PROVIDE ALL ALL EXTERIOR MOUNTED EQUIPMENT DURING SUIBMITTAL PHASE, WHICH OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES; INDICATES THAT THE EQUIPMENT CAN WITHSTANID A WIND LOAD EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT REQUIRED BY THE FSBC. LIMITED TO, THOSE SHOWN. 9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE. 10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL BE INSTALLED WITH MINIMUM 8" CLEARANCE TO ALLOW FOR INSPECTION OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE tY CLEARANCE WHERE POSSIBLE, COORDINATE HVAC LEGEND NO. OF DUCTWORK MINIMUM REQUIRED SUPPLIED OUTSIDE AIR EXCESS OUTSIDE AIR ® �-- SUPPLY DUCTWORK 18 �-- CONICAL TEE COIN. ® �-- DUC RTWORK EXHAUST (CFM) �-- BELLMOUTH COIN. AIRPWANTI�TY� & 12 20 �- �" THROAT TAP BRANCH CONNECTION ao RETURN GRILLE do AIR 120 R. �-- QUANTITY SMOKE CONTROL X Z 160 E. �--- � �tt GRILLE do AIR �-- R RADIUS ELBOW R/Nf =1.5 ( THERMOSTAT (ADJUST.) 240 330 � � �IINIG VANES IN CONSTRUCTION. SEAL THE END OF DUCTWORK WITH PLASTIC SHEETING AND DUCT TAPE. PROTECT ALL DUCTWORK STORED ON -SITE PRIOR TO FABRICATION AND INSTALLATION IN A SIMILAR FASHION. S. ALL EQUIPMENT SHALL BE SUPPLIED AND INSTALLED WITH PROVISIONS FOR IN -PLACE CLEANING AND MAINTAINENCE TASKS IN ACCORDANCE WITH THE REQUIREMENTS OF ASHRAE STANDARD 62 -89R. C. CHANGE IN SPACE USE, CONTAMINANTS, OR OPERATION MAY REQUIRE A RE- EVALUATION OF THE DESIGN . *RATES ARE BASED ON 2004 FLORIDA MECHANICAL CODE, SECTION 403.3. VENTILATION RATES, TABLE 403.3 FOR HOSPITALS, NURSING AND CONVALESCENT HOMES AND FOR OFFICES: OFFICES: 20CFM /PERSON D. VENTILATION REQUIREMENTS FOR THIS AREA BASED ON INTERMITANT OCCUPANCY OF LESS THAN 3 HOUR DIVIDED FLOW ARCHITECT TO CONFIRM OCCUPANCY TYPE. FITTINGS VENTILATION 62- -2001 CONFORMANCE UNIT N0. NO. OF OUTSIDE AIR RATE MINIMUM REQUIRED SUPPLIED OUTSIDE AIR EXCESS OUTSIDE AIR REMARKS 18 PEOPLE (CFM /PERSON) OUTSIDE AIR (CFM) (CFM) (CFM) 48 AHU -1 12 20 240 330 ao X SMOKE CONTROL X TOTAL 12 20 240 330 90 A. ALL DUCTWORK SHALL BE KEPT SEALED TO PREVENT CONTAMINATION BY DUST OR OTHER DEBRIS DURING CONSTRUCTION. SEAL THE END OF DUCTWORK WITH PLASTIC SHEETING AND DUCT TAPE. PROTECT ALL DUCTWORK STORED ON -SITE PRIOR TO FABRICATION AND INSTALLATION IN A SIMILAR FASHION. S. ALL EQUIPMENT SHALL BE SUPPLIED AND INSTALLED WITH PROVISIONS FOR IN -PLACE CLEANING AND MAINTAINENCE TASKS IN ACCORDANCE WITH THE REQUIREMENTS OF ASHRAE STANDARD 62 -89R. C. CHANGE IN SPACE USE, CONTAMINANTS, OR OPERATION MAY REQUIRE A RE- EVALUATION OF THE DESIGN AND IMPLEMENTATION OF NEEDED CHANGES. *RATES ARE BASED ON 2004 FLORIDA MECHANICAL CODE, SECTION 403.3. VENTILATION RATES, TABLE 403.3 FOR HOSPITALS, NURSING AND CONVALESCENT HOMES AND FOR OFFICES: OFFICES: 20CFM /PERSON D. VENTILATION REQUIREMENTS FOR THIS AREA BASED ON INTERMITANT OCCUPANCY OF LESS THAN 3 HOUR WHICH PERMITS 5091 DIVERSITY TO BE USED FOR THE OUTSIDE AIR VENTILATION REQUIREMENT. OWNER / ARCHITECT TO CONFIRM OCCUPANCY TYPE. N DUCT AND PIPE INSULATIO1 DUCTWORK 1.INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE (WITH ROOF INSULATION >R12): 2" THICK, R -8.0 MIN, FIBERGLASS. 2.OUTDOORS DUCTWORK: 2" THICK, R -8 MIN., FIBERGLASS. LEARANCE BELOW RAISED ROO OUNTED MECHANICAL EQUIPME WIDTH OF MECHANICAL UNIT MINIMUM CLEARANCE ABOVE ROOF SURFACE INCHES INCHES 424 14 24< 36 18 36,448 24 48< 60 30 60 48 HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR(S) X FIRE DAMPER(S) X SMOKE DAMPER(S) X FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING (SEE ARCH.) X SMOKE CONTROL X T TEST &BALANCE NOTES 1. FINAL CONSTRUCTION: UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE 'NDICATED AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR T` 1S SNAL BE INCLUDED IN THIS CONTRACTORS PROPOSAL 2. FINAL REPORT SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. HAZARDOUS MATERIAL NOTES 1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF HAZARDOUS MATERIALS. 2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH. 3.IF ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED. AHU OPERATION DURING CONSTRUCTION THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. 2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. TTiE ENDS OF DUCTWORK SHALL BE CLOSED DURIN CONSTRUCTION. 3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERA WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL-UP FILTER MATERIAL 4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS. 5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED. OUTSIDE AIR CALCULATION: FBC 2004 1. OFFICE - 1711 SO. FT x7 PEOPLE X 20 CFM =- 240 CFM O.A. 1 UUU 5q T. I'ERSON CITY Qr. `;�I�tlt hllfihll 13uj;LJ)1►1(3 P,At.-LCI{AINICAL ScC [10x1 J11c A APPROVED BY: - , NJ 11031TECTURE, LC ii'm Cart. No. AA2600115 210 Windy Preserve ake Worth, Florida 33467 hone: (561)649 -5025 ax: (561) 649 -5025 -Mail: MDT Arch a�comcast.net lark D, Taudlen; AIA Irincipal SEAL. t .�� • N ARM 0 AR 0011821 Q 0 LL W OF U- U z4< 0 O o = z > w� 0� u) 0 w w 0� U) 0. z 0N® L.�.. W iL � !;4DI« ENM IkT�d PROJ. NO. 07 -11-01 DATE: DEC. 10, 2007 CO 7t w Q U cn z o_ z 0 U w z I zz J Q_ w 0 0 LL J NJ 11031TECTURE, LC ii'm Cart. No. AA2600115 210 Windy Preserve ake Worth, Florida 33467 hone: (561)649 -5025 ax: (561) 649 -5025 -Mail: MDT Arch a�comcast.net lark D, Taudlen; AIA Irincipal SEAL. t .�� • N ARM 0 AR 0011821 Q 0 LL W OF U- U z4< 0 O o = z > w� 0� u) 0 w w 0� U) 0. z 0N® L.�.. W iL � !;4DI« ENM IkT�d PROJ. NO. 07 -11-01 DATE: DEC. 10, 2007 CO 7t w Q U cn z o_ z 0 U w z I zz J Q_ w 0 0 LL