Loading...
06-781-010ASHRAE 62 CONFORMANCE SPLIT SYSTEM AIR HANDLING UNIT SCHEDULE ;- - - - =- -- - = - -- LOCATION SERVED AIR HANDLING UNIT AIR COOLED CONDENSING UNIT SYSTEM DATA MARK LOCATION TRANE AIRFLOW(CFM) ESP FAN DX COIL HEATER ELECTRICAL WT MARK MODEL WT ELECTRICAL COMPRESSOR FAN UNIT COOLING CAPACITY EER REMARKS 120 -1 -60 75 MODEL 0.375 ROWS 1.5 10 LBS. SEE NOTES B CEILING GRILLE AS SHOWN AS SHOWN TOTAL OA HP FLA KW STAGE V /0 /HZ MCA MOCP QTY. TONS RLA HP FLA MCA MOCP TMBH SMBH EAT DB /WB CEILING GRILLE SERVED NO. AS SHOWN /F.P.I. LBS SEE PLAN NO. LBS VOLTS -PH -HZ (SEER) CEILING GRILLE AHU -101 NE OFFICE TWE060P13 1,600 330 0.50 0.50 3.1 3/12 7.2 1 208/1/60 47 50 173 CU -101 2TTA006OA300 227 208/3/60 1 5.0 19.7 0.25 1.9 27 45 59.3 39.9 78.4'/66.4' 10.75 SEE NOTES AHU -102 NW OFFICE TWE090A 2,400 250 0.50 1.50 6.2 3/12 8.7 1 208/1/60 60 70 317 CU -102 2TTA0072A300 261 208/3/60 1 6.0 19.8 0.16 1.4 26 45 66.6 53.3 76.4•/63.3' 10.55 SEE NOTES OR OVERALL SIZE 6. PROVIDE IF REQUIRED TRANSITIONS FOR NECK SIZES. GENERAL NOTES FOR ALL UNITS 1. TRANE IS THE BASIS OF DESIGN AND THE STANDARD FOR COMPARISON. 16. ALL AIR HANDLING UNITS AND CONDENSING UNITS INDICATED IN THE BUILDING 2. OUTSIDE AIR DESIGN CONDITIONS: 91'FDB - 79'FDB. SHALL HAVE THE FOLLOWING. a) NON BLEED THERMOSTATIC EXPANSION VALVE, 3. MECHANICAL CONTRACTOR SHALL PROVIDE, AND ELECTRICAL CONTRACTOR SHALL WIRE AND INSTALL WEATHERPROOF DISCONNECT FOR CONDENSING UNIT CRANK CASE HEATER, SOLENOID VALVE, HARD START KIT & THE PIPING SHALL 4. MECHANICAL CONTRACTOR SHALL PROVIDE, AND ELECTRICAL CONTRACTOR SHALL WIRE AND INSTALL DISCONNECT FOR AHU. BE INSTALLED USING LONG RADIUS ELBOWS. 5. MANUFACTURER SHALL PROVIDE COMPLETE WITH ELECTRIC HEAT AND SINGLE POINT ELECTRICAL CONNECTION. EQUIPMENT SYSTEM NOTES ( TRANE) 6. MANUFACTURER SHALL PROVIDE COMPLETE WITH FILTER - DRIER, LIQUID LINE SOLENOID, SIGHT GLASS, COASTAL FILTER, CRANKCASE HEATER, ANTI -SHORT CYCLE PROTECTION, HIGH - PRESSURE SWITCH, LO- PRESSURE SWITCH, AND THERMOSTATIC EXPANSION VALVE. * AIR HANDLERS MUST HAVE A LIQUID LINE SOLENOID INSTALLED AT THE AIR HANDLERS. 7. CONTRACTOR SHALL PROVIDE COMPLETE WITH 95% EFFICIENT VIBRATION ISOLATION. * PROVIDE ALL CONDENSER COMPRESSORS WITH CRANK CASE HEATERS. 8. MANUFACTURER SHALL PROVIDE COMPLETE WITH FOUR INCH 45% A.D.S. EFFICIENCY FILTERS FOR AHU -101, & 102. * ROOF MOUNTED CONDENSING UNITS TO BE POSITIONED WITH UNITS SERVING 9. PROVIDE A/C UNITS WITH DIGITAL PROGRAMMABLE HEATING AND COOLING THERMOSTAT WITH ON -OFF SWITCH SUB -BASE. THE LOWEST LEVELS CLOSER TO THE LINE CHASE TO MINIMIZE REFRIGERANT LINE DISTANCE. 10. SIZE AND RUN REFRIGERANT PIPING AS PER MANUFACTURER'S, AND ASHRAES' PUBLISHED RECOMMENDATIONS FOR INSTALLED LENGTH OF RUN. MECHANICAL * PROVIDE EVAPORATOR COILS WITH NON BLEED TXV'S CONTRACTOR SHALL CLOSELY COORDINATE ALL REQUIRED APPURTENANCES REQUIRED FOR THE INSTALLED DISTANCE REQUIREMENTS WITH THE UNIT MANUFACTURER. * ADD 2 OZ. OF OIL FOR EACH 10 FEET OF LINE OVER 200 FEET. 11. PROVIDE PROPER VIBRATION ISOLATORS AS PER MANUFACTURERS RECOMMENDATIONS, PLANS AND SPECIFICATIONS. * ALL LINE LENGTH, SIZES AND UNIT LOCATION MUST BE REVIEWED AND 12. INSULATE REFRIGERANT SUCTION LINE WITH 3/4" FIRE RETARDANT ARMAFLEX. APPROVED BY THE INSTALLING CONTRACTOR. ALL LINE LENGTH AND 13. INSTALL CHEMICAL DRYER AND STRAINER IN REFRIGERANT LIQUID LINES. SIZES MUST FOLLOW TRANE APPLICATION GUIDE PUBLICATION # 32- 3009 -03, THEN SUBMITTED TO THE LOCAL TRANE OFFICE FOR APPROVAL. 14. PROVIDE BUILT -IN DISCONNECT WITH ALL AIR HANDLING UNITS. 15. CONTRACTOR SHALL COORDINATE WITH STRUCTURAL ENGINEER SIZE OF HANGER RODS AND CONCRETE INSERT FOR ALL EQUIPMENT. ASHRAE 62 CONFORMANCE EXHAUST FAN SCHEDULE SCHEDULE FAN LOCATION SERVED MANUFACTURER MODEL VOLT CFM HP OR S.P DRIVE SONES WEIGHT g AHU -101 MARK TYPE SIZE NECK SIZE WATTS FRAME THROW MAKE MODEL EF -1 TOILET GREENHECK SP -B110 120 -1 -60 75 TYPE 0.375 DIRECT 1.5 10 LBS. SEE NOTES B CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN WATTTS 1 (SURFACE) ( ) SEE PLAN TIT US TDC -AA EF -2 TOILET GREENHECK SP -81 10 120 -1 -60 75 TYPE 0.375 DIRECT 1.5 10 LBS. SEE NOTES D CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN WATTS 3 (LAY -IN) SEE PLAN TITUS 3FL SEE NOTES E CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN TYPE 1 (SURFACE) SEE PLAN TITUS 3FL NOTES: 1. INTERLOCK WITH LIGHTSWITCH (UON). 5. MOTOR SHALL COMPLY WITH FLORIDA ENERGY CODE AND SHALL BE A MIN. OF 87 %EFF. 2. UNIT- MOUNTED SPEED CONTROLLER. 6. ALL FANS SHALL BE MIN. UL -705 LISTED. 3. PROVIDE BACKDRAFT DAMPER. 7. MANUFACTURER SHALL PROVIDE SPEED CONTROLLER FACTORY WIRED FOR ONE POINT 4. PROVIDE FACTORY ISOLATORS CONNECTION FOR ALL EXHAUST FANS ASHRAE 62 CONFORMANCE AIR DISTRIBUTION SCHEDULE INTERMITTENT OCCUP OCCUPANCY 0 A VENTILATION (CFM PER PERSON) VENTILLATI O.A. SUPPLIED OVERALL N O AIR FLOW FACTOR ( *) 00 (CFM) (CFM) g AHU -101 MARK TYPE SIZE NECK SIZE (CFM) FRAME THROW MAKE MODEL REMARKS A CEILING DIFFUSER 24X24 AS SHOWN AS SHOWN TYPE 3 (LAY -IN) SEE PLAN TITUS TDC -AA SEE NOTES B CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN TYPE 1 (SURFACE) ( ) SEE PLAN TIT US TDC -AA SEE NOTES C CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN TYPE LAY -IN ( ) SEE PLAN TITUS TLF -AL SEE NOTES D CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN TYPE 3 (LAY -IN) SEE PLAN TITUS 3FL SEE NOTES E CEILING GRILLE AS SHOWN AS SHOWN AS SHOWN TYPE 1 (SURFACE) SEE PLAN TITUS 3FL SEE NOTES NOTES DIFFUSER & GRILLE LEGENDS 1. TITUS IS THE BASIS OF DESIGN AND STANDARD FOR COMPARISON. DEVICE TYPE THROW PATTERN 2. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPE. 3. PROVIDE OFF WHITE FINISH UNLESS OTHERWISE NOTED NECK SIZE _8 °O 100 AIR VOLUME (CFM) (SUBJECT TO ARCH. APPROVAL). 4. SEE FLOOR PLANS FOR VARIATIONS OF THROW & DIRECTIONS. 6X6 -FACE FACE SIZE 5. ALL AIR DISTRIBUTION DEVICES ARE ALUMINUM. OR OVERALL SIZE 6. PROVIDE IF REQUIRED TRANSITIONS FOR NECK SIZES. ASHRAE 62 CONFORMANCE UNIT # OCCUPANCY (# OF PEOPLE) INTERMITTENT OCCUP OCCUPANCY 0 A VENTILATION (CFM PER PERSON) VENTILLATI O.A. SUPPLIED AREA SERVED N O -v FACTOR ( *) 00 (CFM) (CFM) g AHU -101 22 0.75 20 330 330 NE OFFICE AHU -102 18 0.69 20 247 250 NW OFFICE LWL (� 0O NOTE: *ASHRAE 62 -1989 ALLOWS "WHERE PEAK OCCUPANCIES OF LESS THAN THREE HOURS DURATION OCCUR, THE OUTDOOR AIR FLOW RATE MAY BE DETERMINED ON THE BASIS OF AVERAGE OCCUPANCY FOR BUILDING FOR THE DURATION OF OPERATION OF THE SYSTEM, PROVIDED THE AVERAGE OCCUPANCY USED IS NOT LESS THAN ONE - HALF THE MAXIMUM. BASIC TEST FOR SMOKE DETECTOR WITH AIR HANDLING UNIT OFF AND POWER APPLIED TO THE AIR DUCT DETECTOR /SENSOR, INTRODUCE SMOKE INTO THE DETECTOR /SENSOR, OR ACTIVATE THE BUILT -IN TEST FEATURE AS DESCRIBED IN THE 4098 DETECTORS, SENSORS AND BASES APPLICATION MANUAL 574 -709. OBSERVE ALARM LED OPERATIONS. RESTORE NORMAL OPERATION TO DETECTOR BY MOMENTARILY REMOVING AC POWER, OR BY REMOVING AND REPLACING THE DETECTOR HEAD AFTER SMOKE HAS BEEN CLEARED FROM ITS CHAMBER. 20100 n.e. 21 avenue no. miami beach, 11 33179 N (D U o u7 ■ U 0 N 0 _ �- N O -v IL 00 LO -+- g O `. Ic v 0 CC V W V v >0 �- Ji Of 13039 c DRAWN M.R. CHECKED R.P. DATE 11 -30 -05 SCALE AS NOTED JOB NO. 0423 M -3 ■ Q n� ■ V) 0 :L -v IL 00 Ncv g LL Ic §m DRAWN M.R. CHECKED R.P. DATE 11 -30 -05 SCALE AS NOTED JOB NO. 0423 M -3 ■ Q n� ■ V) 0 -v IL 00 Ncv g LL Ic §m CO CC V W V m >0 �- LWL (� 0O w W CC �O Co o V J W o' DRAWN M.R. CHECKED R.P. DATE 11 -30 -05 SCALE AS NOTED JOB NO. 0423 M -3