06-781-010ASHRAE 62 CONFORMANCE
SPLIT SYSTEM AIR HANDLING UNIT
SCHEDULE ;- - - - =-
-- - = - --
LOCATION SERVED
AIR HANDLING UNIT
AIR COOLED CONDENSING UNIT
SYSTEM
DATA
MARK
LOCATION
TRANE
AIRFLOW(CFM)
ESP
FAN
DX COIL
HEATER
ELECTRICAL
WT
MARK
MODEL
WT
ELECTRICAL
COMPRESSOR
FAN
UNIT
COOLING CAPACITY
EER
REMARKS
120 -1 -60
75
MODEL
0.375
ROWS
1.5
10 LBS.
SEE NOTES
B
CEILING
GRILLE
AS SHOWN
AS SHOWN
TOTAL
OA
HP
FLA
KW
STAGE
V /0 /HZ
MCA
MOCP
QTY.
TONS
RLA
HP
FLA
MCA
MOCP
TMBH
SMBH
EAT
DB /WB
CEILING
GRILLE
SERVED
NO.
AS SHOWN
/F.P.I.
LBS
SEE PLAN
NO.
LBS
VOLTS -PH -HZ
(SEER)
CEILING
GRILLE
AHU -101
NE OFFICE
TWE060P13
1,600
330
0.50
0.50
3.1
3/12
7.2
1
208/1/60
47
50
173
CU -101
2TTA006OA300
227
208/3/60
1
5.0
19.7
0.25
1.9
27
45
59.3
39.9
78.4'/66.4'
10.75
SEE NOTES
AHU -102
NW OFFICE
TWE090A
2,400
250
0.50
1.50
6.2
3/12
8.7
1
208/1/60
60
70
317
CU -102
2TTA0072A300
261
208/3/60
1
6.0
19.8
0.16
1.4
26
45
66.6
53.3
76.4•/63.3'
10.55
SEE NOTES
OR OVERALL SIZE
6.
PROVIDE IF REQUIRED TRANSITIONS FOR NECK SIZES.
GENERAL NOTES FOR ALL UNITS
1. TRANE IS THE BASIS OF DESIGN AND THE STANDARD FOR COMPARISON.
16. ALL AIR HANDLING UNITS AND CONDENSING UNITS INDICATED IN THE BUILDING
2. OUTSIDE AIR DESIGN CONDITIONS: 91'FDB - 79'FDB.
SHALL HAVE THE FOLLOWING. a) NON BLEED THERMOSTATIC EXPANSION VALVE,
3. MECHANICAL
CONTRACTOR SHALL PROVIDE, AND ELECTRICAL CONTRACTOR SHALL WIRE AND INSTALL WEATHERPROOF DISCONNECT FOR CONDENSING UNIT
CRANK CASE HEATER, SOLENOID VALVE, HARD START KIT & THE PIPING SHALL
4. MECHANICAL CONTRACTOR SHALL PROVIDE, AND ELECTRICAL CONTRACTOR SHALL WIRE AND INSTALL DISCONNECT FOR AHU.
BE INSTALLED USING LONG RADIUS ELBOWS.
5. MANUFACTURER SHALL PROVIDE COMPLETE WITH ELECTRIC HEAT AND SINGLE POINT ELECTRICAL CONNECTION.
EQUIPMENT SYSTEM NOTES ( TRANE)
6. MANUFACTURER SHALL PROVIDE COMPLETE WITH FILTER - DRIER, LIQUID LINE SOLENOID, SIGHT GLASS, COASTAL FILTER, CRANKCASE HEATER, ANTI -SHORT
CYCLE PROTECTION, HIGH - PRESSURE SWITCH, LO- PRESSURE SWITCH, AND THERMOSTATIC EXPANSION VALVE.
* AIR HANDLERS MUST HAVE A LIQUID LINE SOLENOID INSTALLED AT THE AIR HANDLERS.
7. CONTRACTOR SHALL PROVIDE COMPLETE WITH 95% EFFICIENT VIBRATION ISOLATION.
* PROVIDE ALL CONDENSER COMPRESSORS WITH CRANK CASE HEATERS.
8. MANUFACTURER SHALL PROVIDE COMPLETE WITH FOUR INCH 45% A.D.S. EFFICIENCY FILTERS FOR AHU -101, & 102.
* ROOF MOUNTED CONDENSING UNITS TO BE POSITIONED WITH UNITS SERVING
9. PROVIDE A/C UNITS WITH DIGITAL PROGRAMMABLE HEATING AND COOLING THERMOSTAT WITH ON -OFF SWITCH SUB -BASE.
THE LOWEST LEVELS CLOSER TO THE LINE CHASE TO MINIMIZE REFRIGERANT LINE DISTANCE.
10. SIZE
AND RUN REFRIGERANT PIPING AS PER MANUFACTURER'S, AND ASHRAES' PUBLISHED RECOMMENDATIONS FOR INSTALLED LENGTH OF RUN. MECHANICAL
* PROVIDE EVAPORATOR COILS WITH NON BLEED TXV'S
CONTRACTOR SHALL CLOSELY COORDINATE ALL REQUIRED APPURTENANCES REQUIRED FOR THE INSTALLED DISTANCE REQUIREMENTS WITH THE UNIT MANUFACTURER.
* ADD 2 OZ. OF OIL FOR EACH 10 FEET OF LINE OVER 200 FEET.
11. PROVIDE PROPER VIBRATION ISOLATORS AS PER MANUFACTURERS RECOMMENDATIONS, PLANS AND SPECIFICATIONS.
* ALL LINE LENGTH, SIZES AND UNIT LOCATION MUST BE REVIEWED AND
12. INSULATE REFRIGERANT SUCTION LINE WITH 3/4" FIRE RETARDANT ARMAFLEX.
APPROVED BY THE INSTALLING CONTRACTOR. ALL LINE LENGTH AND
13. INSTALL CHEMICAL DRYER AND STRAINER IN REFRIGERANT LIQUID LINES.
SIZES MUST FOLLOW TRANE APPLICATION GUIDE PUBLICATION # 32- 3009 -03,
THEN SUBMITTED TO THE LOCAL TRANE OFFICE FOR APPROVAL.
14. PROVIDE BUILT -IN DISCONNECT WITH ALL AIR HANDLING UNITS.
15. CONTRACTOR SHALL COORDINATE WITH STRUCTURAL ENGINEER SIZE OF HANGER RODS AND CONCRETE INSERT FOR ALL EQUIPMENT.
ASHRAE 62 CONFORMANCE
EXHAUST FAN SCHEDULE
SCHEDULE
FAN
LOCATION SERVED
MANUFACTURER
MODEL
VOLT
CFM
HP OR
S.P
DRIVE
SONES
WEIGHT
g
AHU -101
MARK
TYPE
SIZE
NECK SIZE
WATTS
FRAME
THROW
MAKE
MODEL
EF -1
TOILET
GREENHECK
SP -B110
120 -1 -60
75
TYPE
0.375
DIRECT
1.5
10 LBS.
SEE NOTES
B
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
WATTTS
1 (SURFACE)
( )
SEE PLAN
TIT US
TDC -AA
EF -2
TOILET
GREENHECK
SP -81 10
120 -1 -60
75
TYPE
0.375
DIRECT
1.5
10 LBS.
SEE NOTES
D
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
WATTS
3 (LAY -IN)
SEE PLAN
TITUS
3FL
SEE NOTES
E
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
TYPE
1 (SURFACE)
SEE PLAN
TITUS
3FL
NOTES:
1. INTERLOCK WITH LIGHTSWITCH
(UON). 5. MOTOR SHALL COMPLY WITH FLORIDA ENERGY CODE AND SHALL BE A MIN. OF 87 %EFF.
2. UNIT- MOUNTED SPEED CONTROLLER. 6. ALL FANS SHALL BE MIN. UL -705 LISTED.
3. PROVIDE BACKDRAFT DAMPER.
7. MANUFACTURER SHALL PROVIDE SPEED CONTROLLER FACTORY WIRED FOR ONE POINT
4. PROVIDE FACTORY ISOLATORS
CONNECTION FOR ALL EXHAUST FANS
ASHRAE 62 CONFORMANCE
AIR DISTRIBUTION
SCHEDULE
INTERMITTENT
OCCUP OCCUPANCY
0 A VENTILATION
(CFM PER PERSON)
VENTILLATI O.A.
SUPPLIED
OVERALL
N
O
AIR FLOW
FACTOR ( *)
00
(CFM)
(CFM)
g
AHU -101
MARK
TYPE
SIZE
NECK SIZE
(CFM)
FRAME
THROW
MAKE
MODEL
REMARKS
A
CEILING
DIFFUSER
24X24
AS SHOWN
AS SHOWN
TYPE
3 (LAY -IN)
SEE PLAN
TITUS
TDC -AA
SEE NOTES
B
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
TYPE
1 (SURFACE)
( )
SEE PLAN
TIT US
TDC -AA
SEE NOTES
C
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
TYPE
LAY -IN
( )
SEE PLAN
TITUS
TLF -AL
SEE NOTES
D
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
TYPE
3 (LAY -IN)
SEE PLAN
TITUS
3FL
SEE NOTES
E
CEILING
GRILLE
AS SHOWN
AS SHOWN
AS SHOWN
TYPE
1 (SURFACE)
SEE PLAN
TITUS
3FL
SEE NOTES
NOTES
DIFFUSER
& GRILLE LEGENDS
1. TITUS IS THE BASIS OF DESIGN AND
STANDARD FOR COMPARISON.
DEVICE TYPE
THROW PATTERN
2.
REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPE.
3. PROVIDE OFF WHITE FINISH UNLESS OTHERWISE NOTED
NECK SIZE _8 °O 100
AIR VOLUME (CFM)
(SUBJECT TO ARCH. APPROVAL).
4. SEE FLOOR PLANS FOR VARIATIONS OF THROW & DIRECTIONS.
6X6 -FACE FACE SIZE
5. ALL AIR DISTRIBUTION DEVICES ARE ALUMINUM.
OR OVERALL SIZE
6.
PROVIDE IF REQUIRED TRANSITIONS FOR NECK SIZES.
ASHRAE 62 CONFORMANCE
UNIT #
OCCUPANCY
(# OF PEOPLE)
INTERMITTENT
OCCUP OCCUPANCY
0 A VENTILATION
(CFM PER PERSON)
VENTILLATI O.A.
SUPPLIED
AREA SERVED
N
O
-v
FACTOR ( *)
00
(CFM)
(CFM)
g
AHU -101
22
0.75
20
330
330
NE OFFICE
AHU -102
18
0.69
20
247
250
NW OFFICE
LWL
(�
0O
NOTE:
*ASHRAE 62 -1989 ALLOWS "WHERE PEAK OCCUPANCIES OF LESS THAN THREE HOURS DURATION
OCCUR, THE OUTDOOR AIR FLOW RATE MAY BE DETERMINED ON THE BASIS OF AVERAGE
OCCUPANCY FOR BUILDING FOR THE DURATION OF OPERATION OF THE SYSTEM, PROVIDED
THE AVERAGE OCCUPANCY USED IS NOT LESS THAN ONE - HALF THE MAXIMUM.
BASIC TEST FOR SMOKE DETECTOR
WITH AIR HANDLING UNIT OFF AND POWER APPLIED TO THE AIR DUCT
DETECTOR /SENSOR, INTRODUCE SMOKE INTO THE DETECTOR /SENSOR,
OR ACTIVATE THE BUILT -IN TEST FEATURE AS DESCRIBED IN THE 4098
DETECTORS, SENSORS AND BASES APPLICATION MANUAL 574 -709.
OBSERVE ALARM LED OPERATIONS. RESTORE NORMAL OPERATION TO
DETECTOR BY MOMENTARILY REMOVING AC POWER, OR BY REMOVING
AND REPLACING THE DETECTOR HEAD AFTER SMOKE HAS BEEN CLEARED
FROM ITS CHAMBER.
20100 n.e. 21 avenue
no. miami beach, 11 33179
N
(D U
o
u7
■
U
0
N
0
_
�-
N
O
-v
IL
00
LO
-+-
g
O
`.
Ic
v
0
CC
V
W
V
v
>0
�-
Ji
Of 13039
c
DRAWN
M.R.
CHECKED
R.P.
DATE
11 -30 -05
SCALE
AS NOTED
JOB NO.
0423
M -3
■
Q
n�
■
V)
0
:L
-v
IL
00
Ncv
g
LL
Ic
§m
DRAWN
M.R.
CHECKED
R.P.
DATE
11 -30 -05
SCALE
AS NOTED
JOB NO.
0423
M -3
■
Q
n�
■
V)
0
-v
IL
00
Ncv
g
LL
Ic
§m
CO
CC
V
W
V
m
>0
�-
LWL
(�
0O
w
W
CC
�O
Co
o
V
J
W
o'
DRAWN
M.R.
CHECKED
R.P.
DATE
11 -30 -05
SCALE
AS NOTED
JOB NO.
0423
M -3