06-781-002REFLECTED CEILING LEGEND : 1n. NEW SUSPENDED ACOUSTICAL CEILING AT -V -0" APP. SHALL RECEIVE A PRELUDE PLUS 116" EXPOSED TEE GRID, ALUMINUM SUSPENSION SYSTEM BY ARMSTRONG OR EQUAL, WITH SECOND LOOK II, 24" X 48" X 3/4" ANGLED TEGULAR LAY -IN CEILING TILES BY ARMSTRONG 02161 OR EQUAL. SEE THE ELECTRICAL a MECHANICAL DRAWINGS FOR APPLICABLE COOR- DINATION INFORMATION. 2. NEW DRYWALL - FINISHED HEADER AT •1' -0" AFF. TO BE FRAMED WITH 3 5/811, 20 GAUGE, METAL STUDS AT 16" O.G. AND SHEATHE ALL EXPOSED SIDES WITH I- LAYER OF 5/8" GYP- SUM WALLBOARD MECHANICALLY FASTENED TO FRAMING. MECHANICALLY FASTEN FRAMING TO UNDERSIDE OF THE STRUCTURE ABOVE, AND EXTEND DRYWALL FOUR INCHES (49 ABOVE THE ADJACENT SUSPENDED ACOUSTICAL TILE CEILING. SEE HEADER DETAIL. 3. NEW 24" X 48" LAY -IN, FLUORESCENT LIGHTING FIXTURE (TYPICAL THROUGHOUT, WHERE DEPICTED). SEE THE ELECTRICAL 4 MECHANICAL DRAWINGS FOR APPLICABLE COORDIN- ATION INFORMATION. 4. NEW 24" X 24" LAY -IN, FLUORESCENT LIGHTING FIXTURE (TYPICAL THROUGHOUT, WHERE DEPICTED). SEE THE ELECTRICAL 4 MECHANICAL DRAWINGS FOR APPLICABLE COORDIN- ATION INFORMATION. 5. NEW RECESSED DOWNLIGHT "HI -HAT" FIXTURE WITH WHITE TRIM (TYPICAL THROUGHOUT, WHERE DEPICTED). SEE THE ELECTRICAL DRAWINGS FOR APPLICABLE COORDINATION INFORMATION. 6. NEW SURFACE- MOUNTED CHANDELIER (TO BE SUPPLIED BY OWNER AND INSTALLED BY THE GENERAL CONTRACTOR). SEE THE ELECTRICAL DRAWINGS. fv 1. NEW R -19 FIBER13LA55 BATT. THERMAL INSULATION LAID ABOVE THE CEILING TILES Q AND DRYWALL CEILINGS THROUGH -OUT THE ENTIRE GROUND FLOOR (TYP.). I GENERAL NOTES : 1. THE GENERAL NOTES AND CONSTRUCTION DOCUMENTS HEREWITH SHALL APPLY TO THE WORK OF THIS PROJECT, AND SHALL BE CAREFULLY REVIEWED BY THE GENERAL CONTRACTOR AND ALL HIS SUBCONTRACTORS. THE GENERAL CONTRACTOR SHALL COORDINATE EACH SUBCONTRACTORS' WORK WITH OTHER SUBCONTRACTORS' WORK ASSOCIATED WITH THIS PROJECT. 2. THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL CARRY WORKMENS COMPENSATION INSURANCE IN STATUTORY AMOUNTS AS REQUIRED BY LAW. TO THE FULLEST EXTENT PERMITTED BY LAW, THE GENERAL CONTRACTOR AND ALL OF HIS SUBCONTRACTORS SHALL INDEMNIFY AND HOLD HARMLESS THE ARCHITECT AND HIS CONSULTING ENGINEERS AND THEIR AGENTS AND EMPLOYEES FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES, AND EXPENSES RESULTING FROM THE PERFORMANCE OF THE WORK ASSOCIATED WITH THIS PROJECT. 3. THE GENERAL CONTRACTOR AND ALL SUBCONSTRACTORS SHALL VERIFY ALL EXISTING CONDITIONS t DIMENSIONS AT THE J055ITE. THE GENERAL CONTRACTOR SHALL COORDINATE ACTUAL FIELD CONDITIONS WITH THE WORK SPECIFIED IN THE CONSTRUCTION DOCUMENTS PRIOR TO BIDDING AND ANY CONSTRUCTION, AND NOTIFY THE ARCHITECT IMMEDIATELY IF ANY DISCREPANCIES ARE ENCOUNTERED. BY SUBMISSION OF A BID FOR CONSTRUCTION, THE GENERAL CONTRACTOR AND HIS SUBCONTRACTORS ACKNOWLEDGE PERFORMING THE ABOVE INSPECTION, AND INCLUDE IN HIS PROPOSAL ALL COSTS AND /OR FEES PERTAINING TO THE COMPLETION OF THE PROJECT AS AS INTENDED IN THE BIDDING CONSTRUCTION DOCUMENT SET AND ANY ADDENDA THESE COSTS MIGHT INCLUDE, BUT ARE NOT LIMITED TO, THE REMOVAL, RELOCATION, AND /OR REPAIR OF ANY EXISTING OBJECTS OR OBSTRUCTIONS WHICH MAY BE ENCOUNTERED IN PERFORMING THE WORK. 4. ALL WORK PERFORMED FOR THIS PROJECT SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION, THE SOUTH FLORIDA BUILDING CODE, AND WITH THE REQUIREMENTS OF THE UTILITY COMPANIES WHOSE SERVICES SHALL BE UTILIZED. ALL MODIFICATIONS REQUIRED BY THE BUILDING DEPARTMENT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO, OR AT THE TIME OF PERMITTING. ANY REQUIRED CHANGES SHALL BE SHOWN, AS DETERMINED BY THE ARCHITECT, ON REVISED DRAWINGS ISSUED TO THE GENERAL CONTRACTOR ANY ADJUSTMENTS TO CONSTRUCTION FEES SHALL TAKE PLACE AT THIS TIME, AND SUBMITTED FOR APPROVAL OF THE ARCHITECT AND OWNER 5. THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL MAKE ARRANGEMENTS FOR, OBTAIN, AND PAY FOR ALL PERMITS, TESTS, INSPECTIONS, AND APPROVALS REQUIRED FOR HIS PORTION OF WORK 6. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS MUST BE AWARE OF ALL COMMENTS AND NOTES MADE BY THE BUILDING OFFICIAL UPON THE FINAL PERMITTED J05SITE SET OF CONSTRUCTION DOCUMENTS, AND SHALL INCORPORATE ALL INFORMATION WITHIN THE APPLICABLE CONTRACTORS' SCOPE OF WORK IT SHALL, AS WELL, BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO KEEP AN AS -BUILT SET OF CONSTRUCTION DOCUMENTS, AND TO NOTIFY THE ARCHITECT OF ANY AND ALL CHANGES MADE DUE TO FIELD DIRECTIVES BY THE BUILDING INSPECTORS. UPON SUBSTANTIAL COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL DELIVER THE AS -BUILT SET OF CONSTRUCTION DOCUMENTS TO THE ARCHITECT, WITH ALL AUTHORIZED FIELD CHANGES CLEARLY INDICATED IN RED INK OR PENCIL. 1. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL BE INDIVIDUALLY RESPONSIBLE FOR THE PROTECTION OF BUILDING OCCUPANTS FROM ALL HAZARDS ASSOCIATED WITH HIS PARTICULAR WORK THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL BARRICADES, BARRIERS, AND DUST CONTROL SYSTEMS NECESSARY TO PROTECT THE HEALTH AND SAFETY OF THE BUILDING OCCUPANTS. 8. WRITTEN DIMENSIONS AND NOTES ARE TYPICAL FOR ALL SIMILAR CONDITIONS, UNLE55 OTHERWISE SPECIFIED IN THE CONSTRUCTION DOCUMENTS. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSIONS OR NOTES ARE NOT INDICATED, THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR RESOLUTION. 1 THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR ANY CUTTING, FITTING, AND PATCHING THAT MAY BE REQUIRED TO PROPERLY COMPLETE THE WORK OF HIS CONTRACT, NO CONTRACTOR SHALL ENDANGER THE WORK OF ANY OTHER CONTRACTOR ANY FEES /COSTS INCURRED TO REPAIR DEFECTIVE OR LIMITED WORK SHALL BE BORNE BY THE SUBCONTRACTOR RESPONSIBLE THEREFOR 10. THE GENERAL CONTRACTOR SHALL SUBMIT PRODUCT APPROVALS, SHOP DRAWINGS, SAMPLES, AND EQUIPMENT SPECIFICATION SHEETS AS CALLED FOR IN THE CONSTRUCTION DOCUMENTS INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: ELECTRICAL AND AIR CONDITIONING EQUIPMENTt PLUMBING FIXTURES! AND FINISHES. ALL SUBMITTALS SHALL BE DELIVERED TO THE OWNER IN ADVANCE TO ALLOW FOR REVIEW. PROCUREMENT AND /OR FABRICATION SHALL NOT COMMENCE UNTIL SUBMITTALS ARE APPROVED BY THE OWNER 4 ARCHITECT/ENGINEER 11. ALL REQUIRED LAB TESTS PERTAINING TO THE PROJECT SHALL BE PERFORMED AT THE SOLE EXPENSE OF THE GENERAL CONTRACTOR AND BY A LICENSED TESTING LABORATORY UNDER THE SUPERVISION OF A FLORIDA REGISTERED ENGINEER TEST RESULTS SHALL BE SUBMITTED EACH TIME A TEST IS COMPLETED. 12. NO STRUCTURAL MEMBER INCLUDING CONCRETE FLOOR SLABS, SHALL BE CUT, CORED, REMOVED, AND /OR MODIFIED (UNLESS SPECIFIED IN THE CONSTRUCTION DOCUMENTS) WITHOUT THE WRITTEN CONSENT OF A LICENSED ENGINEER- 13. AFTER COMPLETION OF CONSTRUCTION, ALL WORK AREAS SHALL BE LEFT CLEAN AND FREE OF ANY JOINT COMPOUND, PLASTER, STUCCO, PAINT SMEARS OR SPLATTERS, AND THE BUILDING IS TO BE BROOM CLEANED. 14. THE GENERAL CONTRACTOR AND ALL APPLICABLE SUBCONTRACTORS SHALL PROVIDE AND INSTALL 2X WOOD BACKING BETWEEN STUDS AND /OR FURRING FOR ANY BASE AND WALL- MOUNTED CABINETRY AND SURFACE- MOUNTED ACCESSORIES PRIOR TO INSTALLATION OF ANY WALLBOARD. PROVIDE BACKING EVEN IF CABINETRY AND ACCESSORIES ARE "BY OTHERS" OR "NOT IN CONTRACT" (N.I.C.). CONTRACTOR SHALL MARK LOCATION OF BACKING ON FINISHED WALLBOARD FOR THE USE OF THE CABINET INSTALLERS. 15. CABINET MANUFACTURER SHALL FIELD MEASURE EXACT LOCATION OF ALL CABINETRY AND ELECTRICAL RECEPTACLES AT THE JOBSITE PRIOR TO THE FABRICATION OF ANY CABINETRY. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS FOR RESOLUTION. 16. ALL WORK SPECIFIED IN THE CONSTRUCTION DOCUMENTS, AND PEWORMED BY THE GENERAL CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE GIVEN A ONE (1) YEAR WARRANTY FROM THE DATE OF THE CITY OR COUNTY'S FINAL INSPECTION, AND WITH THE OWNER'S APPROVAL OF SATISFACTION. DURING THIS PERIOD, THE CONTRACTOR AGREES TO REPAIR AND /OR REPLACE, AS NECESSARY, ANY WORK PERFORMED UNDER HIS CONTRACT WHICH IS DEFECTIVE OR DAMAGED DUE TO CIRCUMSTANCES ASSOCIATED WITH THE WORKMANSHIP OF THE GENERAL CONTRACTOR'S WORK FORCE, OR TWAT OF HIS SUBCONTRACTORS. il. THESE DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF CONSTRUCTION AND REMAIN THE PROPERTY OF THE ARCHITECT. ANY REPRODUCTION OF SAID DRAWINGS, WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT, IS STRICTLY PROHIBITED BY COPYRIGHT PROTECTION LAWS. LEASED OFFICES CEILING PLAN SCALE : 1/4"=V-011 REVISIONS No. OUNER REQ'D. REV. Q (3- 13 -06) (I I I 20100 n.e. 21 avenue no. Miami beach, II 33179 N � U m o Lt7 1 Q . — U O a ,; t Q. CL -+- 0 0) U ° CO iV N o 11-% to M ; ►_- vi C- m IN j O :E t jb. bm Ci d U Q 0 ti Vm of 13039 c t� ■ Q Q 171.0 ••, r �_ 1n ,; t Q. , t. C . 00 CO • V1 1•,. �' 'r1r1 IN j 1�.....•• t jb. �✓ rI W Q `/ Vm t� DRAWN E.D.A. CHECKED R.P. DATE 11 -30 -05 SCALE AS NOTED JOB NO. 0423 A-2 OF 4 SHEETS I ■ Q Q 171.0 ■ �_ 1n of 01 O C 00 CO Q LL rI W Q `/ Vm w� >o LL 0O w* 0 W Z 0 cc � o, J Q� W D -�-� A W (0 .r' DRAWN E.D.A. CHECKED R.P. DATE 11 -30 -05 SCALE AS NOTED JOB NO. 0423 A-2 OF 4 SHEETS I