Loading...
06-760-003s I M 2 1 ih r, JOIST SHORING: TYPE I o SINGLE ELLIS SHORE ih UNBRACED 2 DOUBLE ELLIS SHORES UNBRACED ,4 2' -0' 2' -0' MAX. L/2 L/2 MAX. ZD 1 ih i 4z� 2' -0' MAX. TYPE II TYPE III SINGLE ELLIS SHORE UNBRACED 2' -0' 44—MAX, 2' -0' 4 MAX, L/3 I L/3 L/3 TYPE IV 2' -0' MAX. L/4 L/4 L/4 L/4 TYPE V A L N 6" BEAM 2 ENDS OF JOISTS SUPPORTED ON SOFFIT BEAMS 4' -0 4' -0" L/3 L/3 L/3 TYPE VI zo 1 m 0 I 0 i SINGLE ELLIS SHORE UNBRACED DOUBLE ELLIS SHORES UNBRACED - 2' -0' MAX. SINGLE ELLIS SHORE UNBRACED DOUBLE ELLIS SHORES UNBRACED 2' -0' MAX. 20k Tower JOISTS 5" BEAM BRACING @ MID HEIGHT ENDS OF JOISTS REQUIRED OVER 16' SUPPORTED ON SOFFIT BEAMS 77, >><I, 4' -0" If Ir L/3 L/3 L/3 20k Tower END SHORES NOT REQUIRED WHERE END OF JOIST IS SUPPORTED BY SOFFIT BEAM. TYPE VII MAX. L/4 I L/4 I L/4 L/4 T] TYPE VIII 2' -0' MAX, L/3 I, L/3 I L/3 DOUBLE ELLIS SHORE UNBRACED TRIPLE ELLIS SHORES UNBRACED - 2' -0' MAX. SINGLE ELLIS SHORE UNBRACED 2' -0' MAX, SOFFIT BEAM SHORING V -0" 20k Tower 7' -0" Max. 7'_0» 1 Max. DOUBLE ELLIS SHORES UNBRACED 7'-0" 20k Tower 20k Tower, 7'-0" Max. 7' -0" 7' -0" Max. D DOUBLE ELLIS SHORES UNBRACED W -0" 5' -0" 5' -0" 5' -0" Max. Max. Max. Max. ALTERNATE SHORING FOR SB D571, DD572 & D753 EAST OF 18 LINE; D507, D508, D509, D512 & D513 ON E LINE. DOUBLE ELLIS SHORES UNBRACED 7'-0" 20k Tower, 7' -0" 20k Tower V -0" Max. 7•_0' Max. 7�_0» Max. DOUBLE ELLIS SHORES UNBRACED 7' -0" 20k Tower 20k Tower 7' -0" 20k Tower 7' -0" Max. 7' -0" 7' -0" Max. 7• -0" Max. DOUBLE ELLIS SHORES UNBRACED 7'-0" 20k Tower 7' -0" 20k Tower 7'-0" 20k Tower 7'-0" Max. 7•_0» Max. 1 7- -0» 1 Max. 1 V_0» 1 Max. REVIEWED i;',.;,j;•.r PRO REVIEWED, MARKED AND APPROVED " RESUBMIT CORRECTED COPY FOR FILING REVISE AND RESUBMIT " NOT REVIEWED VIEWED ONLY FOR THE .'«•TED PURPOSE OF THE CHECKING FOR sNFORMANCE WITH THI.- ORMATION GIVEN AND THE DESIGN . INCEPT EXPRESSED IN TH,;. FULL SET OF CONTRACT DOCUMENTS. DOES N07 AUTHORIZE CHANGES IN THE CONTRACT Sum. REVIEW SHOP DRAWINGS IS NOT CONDUCTED FOR DETERMINING THE ;CURACY AND COMPLF t 4ESS OF DETAILS. QUANTITIES OR FOR JBSTANTIATING FAEcisCATiON INSTALLATION INSTRUCTION OR RMANCE OF EQUIPMENT OF SYSTEM, ALL OF WHICH SHALL --THE SOLE RESPONSIBILITY OF THE CONTRACTOR. EMAIN EVIEW OF SHOP DRAWINGS DOES NOT CONSTITUTE APPROVAL F SAFETY PRECAUTIONS, CONSTRUCTION MEANS, METHODS, SE- NOR OR PROCEDURES, NOR DOES !T INDICATE COORO NATION SSEMBLY OF WHICH THE ITEM IS A COMPONENT, OLE RESPONSIBILITY )F THE ALL CONTROAGTOR SHALL ONTRACTOR MUST REVIEW ALL QUANTITIES lND DIMENSIONS AT THE SITE. GF CONSULTING ENGINEERS, INC. dam, bAT. is DOUBLE ELLIS SHORES UNBRACED RESHORING; A.W HIS mil em 0919 *3 1 - SHORING POINTS MUST BE LOCATED AS SHOWN IN THE SHORING DIAGRAMS. 2 - ELLIS SHORES SHALL BE NOMINAL 4 "X4 ", NO. f GRADE DOUGLAS FIR OR YELLOW PINE, FREE FROM KNOTS, CRACKS AND ROT. lz 3 - MUD SILLS, 3/4" PLYWOOD, TWO LAYERS, 16 "X16 ", SHALL BE USED WHEN ELLIS SHORES ARE SUPPORTED ON FILL; THREE LAYERS, 3/4" PLYWOOD, 24 "X24 ". TIERED, SHALL BE USED WITH SCAFFOLD FRAMES. 4 - THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROPER COMPACTION OF THE SOIL TO SUPPORT THE SHORING LOADS. THE SHORING LOADS ARE BASED ON 3000 PSF SBEARING CAPACITY. 5 - THE INTERMEDIATE SHORES ARE TO BE SET AT AN ELEVATION ABOVE THE ELEVATION OF THE ENDS OF THE JOISTS ACCORDING TO THE "SHORE SET" OR "CROWN" DIMENSIONS SHOWN ON THE JOIST ERECTION DRAWINGS. 6 - THE INTERMEDIATE SHORES SHALL REMAIN IN PLACE UNTIL THE SLAB CONCRETE HAS REACHED 70% OF THE DESIGN STRENGTH. THE END SHORES MAY BE REMOVED AFTER 24 HOURS. 7 - THE DECK FORMING FOR JOISTS SPACED 4' -8" AND LESS MAY BE STRIPPED AFTER 24 HOURS. DECK FORMING ON LARGER SPACINGS MAY BE REMOVED AFTER 48 HOURS. 8 - STRUCTURES WITH MULTI - LEVELS OF JOISTS AND /OR SOFFIT BEAMS REQUIRE RESHORING OF THE POURED LEVELS BEFORE SHORING THE NEXT LEVEL. THE SHORING POINTS MUST BE LOCATED AS SHOWN ON THE RESHORING DIAGRAMS. EXISTING SHORES THAT ARE TO BE USED AS RESHORES MUST BE LOOSENED AND RESET TO TOUCH THE BOTTOM OF JOIST OR SOFFIT BEAM. 9 - DESIGN OF THE DECKING AND SUPPORTS AND BEAM FORMING IS BY OTHERS. 10 - INSPECTION OF THE INSTALLATION OF THE SHORING IS BY OTHERS. DESIGN LOADS: 4%" SLAB 8" JOIST 12" JOIST 16" JOIST 24" JOIST CONSTRUCTION LOAD ONE FLOOR OF SHORING UNDER FLOOR BEING POURED, WITH TWO FLOORS OF RESHORING BELOW. SHORES AT ENDS OF SOFFIT BEAMS AT COLUMNS AND SHORES AT ENDS OF JOISTS AT BEAMS NOT REQUIRED ON RESHORED FLOORS. ® 5/30/05 m 3/17/06 A 4/6/06 JOHN MCGREW & ASSOCIATES 301 RYAN AVENUE KEY LARGO, FLORIDA 33037 305 453 -0945 - 57 PSF - 48 PLF - 68 PLF - 93 PLF - 174 PLF - 50 PSF ELI + 63 -6 I 5TH FLOOR EU�+ 5�'_6 4TH FLOOR EU�+ 377• -6• 3RD FLOOR ELi� + 24'_6• 2ND FLOOR ELF; 14 _0, IRECEIVEfj APR 12 202j- GF CONSULTING ENGINEERS l PROJECT OXFORD UNIVERSAL OFFICE BUILDING •" �` SCALE N.T.S. CONTRACTOR DRAWN BY DMC DATE: JAN 11, 2005 FLORIDA ERECTORS, INC. CHECKED JMC ARCHITECT ENGINEER: MARK REARDON R.A. GF CONSULTING ENGINEERS INC. ' ' i � � '• • ".. •' � �' JOB ADDRESS: DRAWING NUMBER: ' "'t}OHN P ^•I�tG�R��N,,.R�E. 6141 SW 72 STREET, MIAMI, FLORIDA 1/ FLOF2IDA . L {�ENSE''�26641