Loading...
06-745-001M `t i il) i 2' -0' MAX. L/4 SOFFIT BEAM SHORING JOIST SHORING: TYPE I ,0 SINGLE ELLIS SHORE M UNBRACED i DOUBLE ELLIS SHORES UNBRACED ,42' -0' 2' -0' MAX, L/2 L/2 MAX, i M i 21-01 MAX. TYPE III SINGLE ELLIS SHORE UNBRACED U_ 2' -0' MAX. 2' -0' _H MA X' L/3 L/3 L/3 TYPE IV TYPE V (u .-r ENDS OF SUPPORT SOFFIT B 4' -0' 4' -0' L/3 L/3 L/3 TYPE VI m L L/4 L L/4 L/4 I M i SINGLE ELLIS SHORE UNBRACED DOUBLE ELLIS SHORES UNBRACED - 2' -0' MAX. SINGLE ELLIS SHORE UNBRACED DOUBLE ELLIS SHORES UNBRACED MAX. JOISTS 20k Tower JOISTS 5" BEAM BRACING @ MID HEIGHT ENDS OF JOISTS REQUIRED OVER 16' SUPPORTED ON SOFFIT BEAMS 4' -0' 4' -0' L/3 L/3 L/3 20k Tower END SHORES NOT REQUIRED WHERE END OF JOIST IS SUPPORTED BY SOFFIT BEAM. TYPE VII A MAX. L/4 I L/4 L/4 L/4 DOUBLE ELLIS SHORE UNBRACED TRIPLE ELLIS SHORES UNBRACED -21-01 MAX. ,.dry +�M�,�,••'S'"•'�'� '.3`r " -'""" • • - _ - ° �:. -'�� �y � ��: REVI1ilhEO AND APPIROVLO ❑ REVIEWED, MARKED AND APPROVED RESUBMIT CORRECTED COPY FOR OILING O REVISE AND RESUBMIT O NOT AE:VIEVVED REVIEWED ONLY FOR THE LIMITED PURPOSE OF THE CHECKING FOA CONFORMANCE WITH THE INFORMATION GIVEN AND THE DE.Sfgk CONCEPT EXPRESSED IN THE FULL SET OF CONTRACT 0OCUMEHT5. IT DOES NOT AUTHORIZE CHANGES IN THE CONTRACT SUM, REV14 OF SHOP DRAWINGS IS NOT CONDUCTED FOR DETERMINING THE ACCURACY AND COMPLETENESS OF DETAILS. QUANTITIES OR FOP SUBSTANTIATING FABRICATION INSTALLATION INSTRUCTION OR PERFORMANCE OF EQUIPMENT OF SYSTEM, All OF WHICH SHALL REMAIN THE SOLE RESPONS18IL17Y OF THE CONTRACTOR. REVIEW OF SHOP DRAWINGS DOES NOT CONSTITUTE APPROVAL OF SAFETY PRECAUTIONS, CONSTRUCTION MEANS, METHODS, SE- QUENCES OR PROCEDURES, NOR DOES IT INDICATE APPROVAL CF ASSEMBLY OF WHICH THE ITEM IS A COMPONENT, COORDINATION 1 OF ALL TRADES SHALL REMAIN THE SOLE RESPONSIBILITY; OF THE CONTRACTOR, CONTRACTOR MUST REVIEW ALL QUANTITIES AND DIMENSIONS AT THE SITE. OF CONSULTING F___N INf_ERS BY, 7' -0 20k Tower 7' -0" Ma7X. 70 -0■ Max. DOUBLE ELLIS SHORES UNBRACED 20k Tower 20k Tower 7' -0" Mo�x. 7' -0" 7' -0" Max. F" DOUBLE ELLIS SHORES UNBRACED 5' -0" 5' -0" 5' -0' Max. Max. Max. Max. ALTERNATE SHORING FOR SB D571, DD572 & D753 EAST OF 18 LINE; 0507, D508, D509, D512 & D513 ON E LINE. DOUBLE ELLIS SHORES UNBRACED 20k Tower 7' -0" 20k Tower. 7' -0' Max. 1 —0■ Max. I —0" Max. DOUBLE ELLIS SHORES UNBRACED 7' -0 1,20k Tower 20k Tower, 7' -0" I,20k Tower, 7' -0" Max. 7' -0" 1 7' -0" 1 Max. 1 7' -0" 1 Max. DOUBLE ELLIS SHORES UNBRACED 7' -0' 1�20k Tower 7' -0" �20k TowerL 7' -0" 1,20k Tower l. 7' -0" Max. A 7' -0" 1 Max. 1 7' -0" 1 Max. 1 V -0, _1 ` —Max. DOUBLE ELLIS SHORES UNBRACED RESHORING; PA GE SHORING NOTES: 1 — SHORING POINTS MUST BE LOCATED AS SHOWN IN THE SHORING \ DIAGRAMS. 2 — ELLIS SHORES SHALL BE NOMINAL 4 "X4 ", NO. 1 GRADE DOUGLAS FIR OR YELLOW PINE, FREE FROM KNOTS, CRACKS AND ROT. 3 — MUD SILLS, 3/4" PLYWOOD, TWO LAYERS, 16 "X16 ", SHALL BE USED WHEN ELLIS SHORES ARE SUPPORTED ON FILL; THREE LAYERS, 3/4" PLYWOOD, 24 "X24 ". TIERED, SHALL BE USED WITH SCAFFOLD FRAMES. 4 — THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROPER COMPACTION OF THE SOIL TO SUPPORT THE SHORING LOADS, THE SHORING LOADS ARE BASED ON 3000 PSF SBEARING CAPACITY. 5 — THE INTERMEDIATE SHORES ARE TO BE SET AT AN ELEVATION ABOVE THE ELEVATION OF THE ENDS OF THE JOISTS ACCORDING TO THE "SHORE SET" OR "CROWN" DIMENSIONS SHOWN ON THE JOIST ERECTION DRAWINGS. 6 — THE INTERMEDIATE SHORES SHALL REMAIN IN PLACE UNTIL THE SLAB CONCRETE HAS REACHED 70% OF THE DESIGN STRENGTH. THE END SHORES MAY BE REMOVED AFTER 24 HOURS. 7 — THE DECK FORMING FOR JOISTS SPACED 4' -8" AND LESS MAY BE STRIPPED AFTER 24 HOURS. DECK FORMING ON LARGER SPACINGS MAY BE REMOVED AFTER 48 HOURS. 8 — STRUCTURES WITH MULTI— LEVELS OF JOISTS AND /OR SOFFIT BEAMS REQUIRE RESHORING OF THE POURED LEVELS BEFORE SHORING THE NEXT LEVEL. THE SHORING POINTS MUST BE LOCATED AS SHOWN ON THE RESHORING DIAGRAMS. EXISTING SHORES THAT ARE TO BE USED AS RESHORES MUST BE LOOSENED AND RESET TO TOUCH THE BOTTOM OF JOIST OR SOFFIT BEAM. 9 — DESIGN OF THE DECKING AND SUPPORTS AND BEAM FORMING IS BY OTHERS. 10 — INSPECTION OF THE INSTALLATION OF THE SHORING IS BY OTHERS. DESIGN LOADS: 4 -" SLAB — 57 PSF 8" JOIST — 48 PLF 12" JOIST — 68 PLF 16" JOIST — 93 PLF 24" JOIST — 174 PLF CONSTRUCTION LOAD — 50 PSF RD�F EL + '- sSTH QQR Et + FL 50'-b' 4TH IF �R EL' + 37'-6' • ®3RD FL6]IR EL, + 24'-6' • • 2ND FLOOR ®EL' + 14 �•a r ONE FLOOR OF SHORING UNDER FLOOR BEING POURED, WITH TWO FLOORS OF RESHORING BELOW. SHORES AT ENDS OF SOFFIT BEAMS AT COLUMNS AND SHORES AT ENDS OF JOISTS AT BEAMS NOT REQUIRED ON RESHORED FLOORS. A 5/30/05 A 3/17/06 JOHN MCGROEW & ASSOCIATES 301 RYAN AVENUE KEY LARGO, FLORIDA 33037 305 - 453 -0945 t li MAR 2 3 226 GE CONSULTING ENGINEERS PROJECT OXFORD UNIVERSAL OFFICE BUILDING F; o' ��� � •� .�.' SCALE N.T.S. CONTRACTOR DRAWN BY DMC o E: FLORIDA ERECTORS, INC. CHECKED j 6 - JAN 11, 2005 JMC 1 * AR HITECT ENGINEER: r 0.' MARK REARDON R.A. GF CONSULTING ENGINEERS INC. J00 DRESS: DRAWING NUMBER: JOHN P. M EW,' P.E. 6141 SW 72 STREET, MIAMI, FLORIDA 1/ FLORIDA LICENSE' 6641