06-51-012P -001 PLUMBING LEGEND, GENERAL NOTES,
PLUMBING
SYMBOL
LEGEND
AFF
- ABOVE FINISH FLOOR
CD
- CONDENSATE DRAIN
CD
- CONDENSATE DRAIN
P -202
- DOMESTIC COLD WATER
CO
- CLEANOUT
WALL MOUNTED, FLUSH TANK
- SANITARY
CONT
- CONTINUATION
FLOW
- SANITARY VENT
CW
- DOMESTIC COLD WATER
LAVATORY
- STORM
DN
- DOWN
WALL HUNG
- DOMESTIC HOT WATER
DWG
- DRAWING
-� -
- HOSE BIBB
EXIST
- EXISTING
MEDICAL
LAVATORY
- CLEAN OUT PLUG
FD
- FLOOR DRAIN
COUNTERTOP
- GAS
HB
- HOSE BIBB
Q CO
- FLOOR CLEAN OUT
IE
- INVERT ELEVATION
BREAK RM. SINK
1' /2"
y"
y11
COUNTERTOP
- FLOOR DRAIN
KW
- KILOWATT
y"
Y"
LB5
- POUNDS
�
- BALL VALVE
NIC
-NOT IN CONTRACT
lX
- BALANCING VALVE
- NOT TO SCALE
SWING)
VALVE(SWING)
CHECK VALVE(
PRV
- PRESSURE REDUCING VALVE
-'
- PRESSURE REDUCING VALVE
P51
- POUNDS PER SQUARE INCH
NOTES:
- SOLENOID OPERATED VALVE
RD
- ROOF DRAIN
RPBP
- REDUCED PRESSURE BACKFLOW
RPBP
- REDUCED PRESSURE BACKFLOW PREVENTER
4. PROVIDE AN EWH -2 WITH A I-0 GFM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS.
PREVENTER WITH STRAINER
SAN
- SANITARY
--
- RELIEF OR SAFETY VALVE
SD
- STORM DRAIN L n
- VALVE ON RISER
SF
- SQUARE FEET E
' CAP
5T
- STORM n
- ELBOW, TURNED UP
V
- VENT
VTR
- VENT THRU ROOF C
- ELBOW, TURNED DOWN
- TEE
13-
- TEE, TURNED UP
i
- TEE, TURNED DOWN
SHEET INDEX
P -001 PLUMBING LEGEND, GENERAL NOTES,
NOTE:
I. ALL PIPING BETWEEN WATER HEATER AND FAUCET
SHALL BE MINIMUM 1r2".
2. ALL SUPPLY PIPING TO TWH SHALL BE 3/4 "0 MIN.
3. COORDINATE WITH ARCHITECTURAL DRWGS FOR
EXACT LOCATION OF TAXLESS WATER HEATER
PRIOR TO ROUGH -1N.
COUNTERTOP
USE TWH -I TO FEED A SINGLE MLV AND
[WH-IM R 2 OR 3 MLV ON 8o"'"
FAUCET
3/4 li 0 N
\\- FLOW CONTROL
WATER HEATER WITH UNION
FLOW CONTROL VALVE
TANKLESS ELECTRIC WATER HEATER
NTS
PLUMBING SPECIFICATIIONS
1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS
INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FORA COMPLETE
PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH AILL LABOR TO INSTALL ALL
EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL- PLUMBING AND BUILDING
CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION.
2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY
FOSSI13LEE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES
ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB
CONDITIONS.
3. VERIFY ALL POINTS OF CONNECTION WITH UTILITIES PRIOR'. TO START INSTALLATION.
4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCH17TECTURAL DRAWINGS AND
COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO
ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS.
5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED TO COMPLETE
INSTALLATION AS INTENDED.
6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND
OR FLOORS AND PROVIDE ACCESS PANELS TO REACH UATEER DISTRIBUTION
SYSTEM'S VALVES.
1. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF
PENETRATIONS WATER TIGHT.
6. BUILDING DRAINAGE SYSTEM DESIGN BASED ON 1 /8" FT. MINIMUM FALL.
9. PROVIDE P MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND
METER ROOM FOR GROUND.
10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES,
BROOKS OR EQUAL.
11, ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS IFOLLOWS:
A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV
(A5TM- D- 26(o2).
B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.`V.C.
C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -5-88) TYPE "L"
ABOVE GROUND 4 TYPE "K" UNDERGROUND.
D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO
DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT
REQUIRING WATER SUPPLY.
E INSULATE ALL HOT WATER LINES WITH y" FIBERGLASS) WITH SELF SEALING
UNIVERSAL JACKET.
F PLUMBING FIXTURES- AMERICAN STANDARD, KOHLER, CRANE OR EQUAL.
G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAIL, FLOOR DRAINS SHALL
BE RESEALED.
H ELECTRICAL WATER HEATERS- GLA55LINED, 5 YEARS GUARANTEED A.O., SMITH
OR EQUAL.
I VALVES - 125 PSI NIBCO SCOTT OR EQUAL -
J NOSE BIBBS CHICAGO 952, OR EQUAL,
K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME
PLATED ESCUTCHEON'S AS REQUIRED.
12. PERFORM THE FOLLOWING TESTS:
A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100
P51G. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT
LESS THAN ONE HOUR
B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL
BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND
ALLOWED TO STAND UNTIL INSPECTION 15 MADE ANC WATER LEVEL REMAINS
CONSTANT.
C CORRECT ALL DEFECTS PRIOR TO PLACING SYSTEM IN OPERATION.
13, STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000
GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES
24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN
SERVICE.
14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST
AFTER COMPLETION OF THE INSTALLATION.
15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM
DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND
ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFIECTIVE5 DURING THAT
PERIOD.
PERFORATED
VENT CAP
TYPICAL MEDICAL
SINK (MLV). 7,
Z
G.O. PLUG a A/C UNIT
iv
3�4u� DRAIN PAN
SLOWUNION
SUPPLY STOP
CONDENSATE TRAP DETAIL
NOT TO SCALE
FINISHED WALL
GRAB BAR
(BY OTHERS)
i
♦sav i i i.l i.:
•ii a • � ,.. iiia�
-
-
J
VPLUM 81NG FIXTURE CONECTION SCHEDULE
SHEET INDEX AND SCHEDULES
P -101
PLUMBING THIRD FLOOR PLAN
P -102
PLUMBING FOURTH FLOOR PLAN
P -103
PLUMBING FIFTH FLOOR PLAN
P -201
SANITARY t VENT RISER DIAGRAM A
P -202
SANITARY 4 VENT RISER DIAGRAM B
P -203
DOMESTIC WATER RISER DIAGRAM
NOTE:
I. ALL PIPING BETWEEN WATER HEATER AND FAUCET
SHALL BE MINIMUM 1r2".
2. ALL SUPPLY PIPING TO TWH SHALL BE 3/4 "0 MIN.
3. COORDINATE WITH ARCHITECTURAL DRWGS FOR
EXACT LOCATION OF TAXLESS WATER HEATER
PRIOR TO ROUGH -1N.
COUNTERTOP
USE TWH -I TO FEED A SINGLE MLV AND
[WH-IM R 2 OR 3 MLV ON 8o"'"
FAUCET
3/4 li 0 N
\\- FLOW CONTROL
WATER HEATER WITH UNION
FLOW CONTROL VALVE
TANKLESS ELECTRIC WATER HEATER
NTS
PLUMBING SPECIFICATIIONS
1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS
INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FORA COMPLETE
PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH AILL LABOR TO INSTALL ALL
EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL- PLUMBING AND BUILDING
CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION.
2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY
FOSSI13LEE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES
ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB
CONDITIONS.
3. VERIFY ALL POINTS OF CONNECTION WITH UTILITIES PRIOR'. TO START INSTALLATION.
4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCH17TECTURAL DRAWINGS AND
COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO
ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS.
5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED TO COMPLETE
INSTALLATION AS INTENDED.
6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND
OR FLOORS AND PROVIDE ACCESS PANELS TO REACH UATEER DISTRIBUTION
SYSTEM'S VALVES.
1. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF
PENETRATIONS WATER TIGHT.
6. BUILDING DRAINAGE SYSTEM DESIGN BASED ON 1 /8" FT. MINIMUM FALL.
9. PROVIDE P MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND
METER ROOM FOR GROUND.
10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES,
BROOKS OR EQUAL.
11, ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS IFOLLOWS:
A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV
(A5TM- D- 26(o2).
B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.`V.C.
C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -5-88) TYPE "L"
ABOVE GROUND 4 TYPE "K" UNDERGROUND.
D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO
DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT
REQUIRING WATER SUPPLY.
E INSULATE ALL HOT WATER LINES WITH y" FIBERGLASS) WITH SELF SEALING
UNIVERSAL JACKET.
F PLUMBING FIXTURES- AMERICAN STANDARD, KOHLER, CRANE OR EQUAL.
G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAIL, FLOOR DRAINS SHALL
BE RESEALED.
H ELECTRICAL WATER HEATERS- GLA55LINED, 5 YEARS GUARANTEED A.O., SMITH
OR EQUAL.
I VALVES - 125 PSI NIBCO SCOTT OR EQUAL -
J NOSE BIBBS CHICAGO 952, OR EQUAL,
K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME
PLATED ESCUTCHEON'S AS REQUIRED.
12. PERFORM THE FOLLOWING TESTS:
A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100
P51G. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT
LESS THAN ONE HOUR
B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL
BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND
ALLOWED TO STAND UNTIL INSPECTION 15 MADE ANC WATER LEVEL REMAINS
CONSTANT.
C CORRECT ALL DEFECTS PRIOR TO PLACING SYSTEM IN OPERATION.
13, STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000
GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES
24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN
SERVICE.
14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST
AFTER COMPLETION OF THE INSTALLATION.
15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM
DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND
ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFIECTIVE5 DURING THAT
PERIOD.
PERFORATED
VENT CAP
TYPICAL MEDICAL
SINK (MLV). 7,
Z
G.O. PLUG a A/C UNIT
iv
3�4u� DRAIN PAN
SLOWUNION
SUPPLY STOP
CONDENSATE TRAP DETAIL
NOT TO SCALE
FINISHED WALL
GRAB BAR
(BY OTHERS)
i
♦sav i i i.l i.:
•ii a • � ,.. iiia�
-
-
J
VPLUM 81NG FIXTURE CONECTION SCHEDULE
MARKS DFSCRIPJION WASTE C.W. I.W. REMARKS
WC WATER CLOSET 3" 3/811 - WALL MOUNTED, FLUSH TANK
LV
LAVATORY
11/4"
3/8"
-
WALL HUNG
HCWC
WATER CLOSET
3"
3/81,
-
WALL MOUNTED, FLUSH TANK
MODEL
HANDICAPED USE
RISE
FLOW
VOLT
AMPS
HC LV
LAVATORY
11/411
3 /811
-
WALL HUNG
56• F
HANDICAPED USE
208 -1
19.1 EA.
1
999.
ML
MEDICAL
LAVATORY
11/4„
3/811
31811
COUNTERTOP
Is
SHOWER
2"
y"
y"
ANTI -SCALD MIXING VALVE
BRSK
BREAK RM. SINK
1' /2"
y"
y11
COUNTERTOP
J5
JANITOR SINK
II /z"
y"
Y"
SEE ARCH DWGS.
NOTE: SOME FIXTURES MAY NOT BE USED ON THIS FLOOR. 5EE DRAWINGS.
TANKLE S S WATER HEATER SCHEDULE
MARK
* P.U.I. SIZE
CONN. SIZE
HA -1
A (1 -II F.U.)
INPUT
TEMP
WATER
3/4"
HA -3
UNIT NO
MODEL
MAX/MIN
RISE
FLOW
VOLT
AMPS
CIRC.
EFF
WEIGHT
TWH -1
EEMAXSP4208
-
56• F
0.5 GPM
208 -1
19.1 EA.
1
999.
3.0 LBS
TWH -2
EEMAXSP8208
-
57• F
1 GPM
208 -1
40 EA.
1
99%
3.0 LBS
TWH -3
T E WATER
60, F
3.0 GPM
240 -1
93.6 EA.
1
98.5 16
12.0 LB8
HEATER 220
NOTES:
I. SEE ARCHITECTURAL DRAWINGS FOR EXACT MOUNTING LOCATION OF ALL UNITS.
2. PROVIDE Ay" CIIH WATER LINE. INSTALL A FLOW STOP ON CW SUPPLY LINE.
3. PROVIDE AN EWH -I WITH A 05 GPM AERATOR ON ALL EXAM ROOM, LABORATORY SINKS AND LAVATORIES.
4. PROVIDE AN EWH -2 WITH A I-0 GFM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS.
5. PROVIDE AN EWH -3 FOR JANITOR SINKS AND AS INDICATED ON THE DRAWINGS.
WATER HAMMER
ARRESTER SCHEDULE
MARK
* P.U.I. SIZE
CONN. SIZE
HA -1
A (1 -II F.U.)
1/2"
HA -2
B (12 -32 F.U.)
3/4"
HA -3
• PLUMBING AND DRAINAGE INSTITUTE: STANDARD WH -201
REFER TO FLOOR PLANS
FOR TYPE OF FIXTURE
CONNECTED TO P -TRAP
` JAY R SMITH(FIG. NO. 26W)
THE HANDLE of THE FLUSH LEVER WATER SAVER P -TRAP WITH
SHALL FACE THE WIDE SIDE OF PRIMER TUBE(CHROME PLATED)
THE STALL(NO EXCEPTIONS!).
CW SUPPLY TO FIXTURE o _ PRIMER TUBE(CHROME PLA
CHROME PLATED WALL �, t .7 {�
ESCUTCHEON - ac ' . ;
ATER CLOSET <,• '
SUPPLY ST OP I �
�.... a ..� ..... 4 ....Z ............. .......{ -
t j
FLOOR DRAIN
WATER CLOSET
ACCESSIBLE NTS
ESCUTCHEON
�- CLEANOUT
PLUG
FINISHED
WALL
FINISHED FLOOR
O. .. a.- G d
d a. .
P -TRAP
In " TYPE W SOFT SEAMLESS COPPER
WITH NO JOINTS BELOW FLOOR SLAB.
SLOPE AT 1/6 " PER FOOT MINIMUM TO
FLOOR DRAIN CONNECTION.
diez
41
architecture,
inn,
7430 sw 48th street
miami, florida 33155
phone: (305) 663 -1970
fax: (305) 663 -2312
e -mail: peter ®diezarchitecture.com
pedro diez, ra
president or 0008996
ENGINEERING CONSULTANT
PRV ENGINEERING, INC.
Mechanical - Electrical - Plumbing - fire Protection
6452 NW 77 Ct., Miami, FL 33166 - Ph: 305.859.8827 - Fx: 305.856.5955
Board of Professional Enginee W, jho ization No.: 00009635
Mechanical Enginee` %S% \P oo ert Valdes YFt� PE 31326
Electrical Engvi''" % ertb Ventre y jai E 32076
PROJE
be
v
P. ROBERT VAlOE�,`�
PE #: 31326 ,,►���`��
6747
Office Building
4th Floor
6141 SUNSET DRIVE
SOUTH MIAMI, FLORIDA
PROJECT No. 04- 158.04
REVISIONS
SCHEDULES
NOTES,
AND DETAILS
SCALE: AS SHOWN
GREY WATER TRAP PRIMER DATE: DECEMBER 112, 2003
NTS
■
TOTAL 4