Loading...
06-51-012P -001 PLUMBING LEGEND, GENERAL NOTES, PLUMBING SYMBOL LEGEND AFF - ABOVE FINISH FLOOR CD - CONDENSATE DRAIN CD - CONDENSATE DRAIN P -202 - DOMESTIC COLD WATER CO - CLEANOUT WALL MOUNTED, FLUSH TANK - SANITARY CONT - CONTINUATION FLOW - SANITARY VENT CW - DOMESTIC COLD WATER LAVATORY - STORM DN - DOWN WALL HUNG - DOMESTIC HOT WATER DWG - DRAWING -� - - HOSE BIBB EXIST - EXISTING MEDICAL LAVATORY - CLEAN OUT PLUG FD - FLOOR DRAIN COUNTERTOP - GAS HB - HOSE BIBB Q CO - FLOOR CLEAN OUT IE - INVERT ELEVATION BREAK RM. SINK 1' /2" y" y11 COUNTERTOP - FLOOR DRAIN KW - KILOWATT y" Y" LB5 - POUNDS � - BALL VALVE NIC -NOT IN CONTRACT lX - BALANCING VALVE - NOT TO SCALE SWING) VALVE(SWING) CHECK VALVE( PRV - PRESSURE REDUCING VALVE -' - PRESSURE REDUCING VALVE P51 - POUNDS PER SQUARE INCH NOTES: - SOLENOID OPERATED VALVE RD - ROOF DRAIN RPBP - REDUCED PRESSURE BACKFLOW RPBP - REDUCED PRESSURE BACKFLOW PREVENTER 4. PROVIDE AN EWH -2 WITH A I-0 GFM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS. PREVENTER WITH STRAINER SAN - SANITARY -- - RELIEF OR SAFETY VALVE SD - STORM DRAIN L n - VALVE ON RISER SF - SQUARE FEET E ' CAP 5T - STORM n - ELBOW, TURNED UP V - VENT VTR - VENT THRU ROOF C - ELBOW, TURNED DOWN - TEE 13- - TEE, TURNED UP i - TEE, TURNED DOWN SHEET INDEX P -001 PLUMBING LEGEND, GENERAL NOTES, NOTE: I. ALL PIPING BETWEEN WATER HEATER AND FAUCET SHALL BE MINIMUM 1r2". 2. ALL SUPPLY PIPING TO TWH SHALL BE 3/4 "0 MIN. 3. COORDINATE WITH ARCHITECTURAL DRWGS FOR EXACT LOCATION OF TAXLESS WATER HEATER PRIOR TO ROUGH -1N. COUNTERTOP USE TWH -I TO FEED A SINGLE MLV AND [WH-IM R 2 OR 3 MLV ON 8o"'" FAUCET 3/4 li 0 N \\- FLOW CONTROL WATER HEATER WITH UNION FLOW CONTROL VALVE TANKLESS ELECTRIC WATER HEATER NTS PLUMBING SPECIFICATIIONS 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FORA COMPLETE PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH AILL LABOR TO INSTALL ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL- PLUMBING AND BUILDING CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION. 2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY FOSSI13LEE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB CONDITIONS. 3. VERIFY ALL POINTS OF CONNECTION WITH UTILITIES PRIOR'. TO START INSTALLATION. 4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCH17TECTURAL DRAWINGS AND COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS. 5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED TO COMPLETE INSTALLATION AS INTENDED. 6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AND PROVIDE ACCESS PANELS TO REACH UATEER DISTRIBUTION SYSTEM'S VALVES. 1. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF PENETRATIONS WATER TIGHT. 6. BUILDING DRAINAGE SYSTEM DESIGN BASED ON 1 /8" FT. MINIMUM FALL. 9. PROVIDE P MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND METER ROOM FOR GROUND. 10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES, BROOKS OR EQUAL. 11, ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS IFOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV (A5TM- D- 26(o2). B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.`V.C. C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -5-88) TYPE "L" ABOVE GROUND 4 TYPE "K" UNDERGROUND. D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SUPPLY. E INSULATE ALL HOT WATER LINES WITH y" FIBERGLASS) WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KOHLER, CRANE OR EQUAL. G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAIL, FLOOR DRAINS SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLA55LINED, 5 YEARS GUARANTEED A.O., SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL - J NOSE BIBBS CHICAGO 952, OR EQUAL, K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED ESCUTCHEON'S AS REQUIRED. 12. PERFORM THE FOLLOWING TESTS: A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 P51G. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION 15 MADE ANC WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS PRIOR TO PLACING SYSTEM IN OPERATION. 13, STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFIECTIVE5 DURING THAT PERIOD. PERFORATED VENT CAP TYPICAL MEDICAL SINK (MLV). 7, Z G.O. PLUG a A/C UNIT iv 3�4u� DRAIN PAN SLOWUNION SUPPLY STOP CONDENSATE TRAP DETAIL NOT TO SCALE FINISHED WALL GRAB BAR (BY OTHERS) i ♦sav i i i.l i.: •ii a • � ,.. iiia� - - J VPLUM 81NG FIXTURE CONECTION SCHEDULE SHEET INDEX AND SCHEDULES P -101 PLUMBING THIRD FLOOR PLAN P -102 PLUMBING FOURTH FLOOR PLAN P -103 PLUMBING FIFTH FLOOR PLAN P -201 SANITARY t VENT RISER DIAGRAM A P -202 SANITARY 4 VENT RISER DIAGRAM B P -203 DOMESTIC WATER RISER DIAGRAM NOTE: I. ALL PIPING BETWEEN WATER HEATER AND FAUCET SHALL BE MINIMUM 1r2". 2. ALL SUPPLY PIPING TO TWH SHALL BE 3/4 "0 MIN. 3. COORDINATE WITH ARCHITECTURAL DRWGS FOR EXACT LOCATION OF TAXLESS WATER HEATER PRIOR TO ROUGH -1N. COUNTERTOP USE TWH -I TO FEED A SINGLE MLV AND [WH-IM R 2 OR 3 MLV ON 8o"'" FAUCET 3/4 li 0 N \\- FLOW CONTROL WATER HEATER WITH UNION FLOW CONTROL VALVE TANKLESS ELECTRIC WATER HEATER NTS PLUMBING SPECIFICATIIONS 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FORA COMPLETE PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH AILL LABOR TO INSTALL ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL- PLUMBING AND BUILDING CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION. 2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY FOSSI13LEE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB CONDITIONS. 3. VERIFY ALL POINTS OF CONNECTION WITH UTILITIES PRIOR'. TO START INSTALLATION. 4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCH17TECTURAL DRAWINGS AND COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS. 5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED TO COMPLETE INSTALLATION AS INTENDED. 6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AND PROVIDE ACCESS PANELS TO REACH UATEER DISTRIBUTION SYSTEM'S VALVES. 1. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF PENETRATIONS WATER TIGHT. 6. BUILDING DRAINAGE SYSTEM DESIGN BASED ON 1 /8" FT. MINIMUM FALL. 9. PROVIDE P MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND METER ROOM FOR GROUND. 10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES, BROOKS OR EQUAL. 11, ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS IFOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV (A5TM- D- 26(o2). B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.`V.C. C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -5-88) TYPE "L" ABOVE GROUND 4 TYPE "K" UNDERGROUND. D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SUPPLY. E INSULATE ALL HOT WATER LINES WITH y" FIBERGLASS) WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KOHLER, CRANE OR EQUAL. G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAIL, FLOOR DRAINS SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLA55LINED, 5 YEARS GUARANTEED A.O., SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL - J NOSE BIBBS CHICAGO 952, OR EQUAL, K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED ESCUTCHEON'S AS REQUIRED. 12. PERFORM THE FOLLOWING TESTS: A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 P51G. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION 15 MADE ANC WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS PRIOR TO PLACING SYSTEM IN OPERATION. 13, STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFIECTIVE5 DURING THAT PERIOD. PERFORATED VENT CAP TYPICAL MEDICAL SINK (MLV). 7, Z G.O. PLUG a A/C UNIT iv 3�4u� DRAIN PAN SLOWUNION SUPPLY STOP CONDENSATE TRAP DETAIL NOT TO SCALE FINISHED WALL GRAB BAR (BY OTHERS) i ♦sav i i i.l i.: •ii a • � ,.. iiia� - - J VPLUM 81NG FIXTURE CONECTION SCHEDULE MARKS DFSCRIPJION WASTE C.W. I.W. REMARKS WC WATER CLOSET 3" 3/811 - WALL MOUNTED, FLUSH TANK LV LAVATORY 11/4" 3/8" - WALL HUNG HCWC WATER CLOSET 3" 3/81, - WALL MOUNTED, FLUSH TANK MODEL HANDICAPED USE RISE FLOW VOLT AMPS HC LV LAVATORY 11/411 3 /811 - WALL HUNG 56• F HANDICAPED USE 208 -1 19.1 EA. 1 999. ML MEDICAL LAVATORY 11/4„ 3/811 31811 COUNTERTOP Is SHOWER 2" y" y" ANTI -SCALD MIXING VALVE BRSK BREAK RM. SINK 1' /2" y" y11 COUNTERTOP J5 JANITOR SINK II /z" y" Y" SEE ARCH DWGS. NOTE: SOME FIXTURES MAY NOT BE USED ON THIS FLOOR. 5EE DRAWINGS. TANKLE S S WATER HEATER SCHEDULE MARK * P.U.I. SIZE CONN. SIZE HA -1 A (1 -II F.U.) INPUT TEMP WATER 3/4" HA -3 UNIT NO MODEL MAX/MIN RISE FLOW VOLT AMPS CIRC. EFF WEIGHT TWH -1 EEMAXSP4208 - 56• F 0.5 GPM 208 -1 19.1 EA. 1 999. 3.0 LBS TWH -2 EEMAXSP8208 - 57• F 1 GPM 208 -1 40 EA. 1 99% 3.0 LBS TWH -3 T E WATER 60, F 3.0 GPM 240 -1 93.6 EA. 1 98.5 16 12.0 LB8 HEATER 220 NOTES: I. SEE ARCHITECTURAL DRAWINGS FOR EXACT MOUNTING LOCATION OF ALL UNITS. 2. PROVIDE Ay" CIIH WATER LINE. INSTALL A FLOW STOP ON CW SUPPLY LINE. 3. PROVIDE AN EWH -I WITH A 05 GPM AERATOR ON ALL EXAM ROOM, LABORATORY SINKS AND LAVATORIES. 4. PROVIDE AN EWH -2 WITH A I-0 GFM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS. 5. PROVIDE AN EWH -3 FOR JANITOR SINKS AND AS INDICATED ON THE DRAWINGS. WATER HAMMER ARRESTER SCHEDULE MARK * P.U.I. SIZE CONN. SIZE HA -1 A (1 -II F.U.) 1/2" HA -2 B (12 -32 F.U.) 3/4" HA -3 • PLUMBING AND DRAINAGE INSTITUTE: STANDARD WH -201 REFER TO FLOOR PLANS FOR TYPE OF FIXTURE CONNECTED TO P -TRAP ` JAY R SMITH(FIG. NO. 26W) THE HANDLE of THE FLUSH LEVER WATER SAVER P -TRAP WITH SHALL FACE THE WIDE SIDE OF PRIMER TUBE(CHROME PLATED) THE STALL(NO EXCEPTIONS!). CW SUPPLY TO FIXTURE o _ PRIMER TUBE(CHROME PLA CHROME PLATED WALL �, t .7 {� ESCUTCHEON - ac ' . ; ATER CLOSET <,• ' SUPPLY ST OP I � �.... a ..� ..... 4 ....Z ............. .......{ - t j FLOOR DRAIN WATER CLOSET ACCESSIBLE NTS ESCUTCHEON �- CLEANOUT PLUG FINISHED WALL FINISHED FLOOR O. .. a.- G d d a. . P -TRAP In " TYPE W SOFT SEAMLESS COPPER WITH NO JOINTS BELOW FLOOR SLAB. SLOPE AT 1/6 " PER FOOT MINIMUM TO FLOOR DRAIN CONNECTION. diez 41 architecture, inn, 7430 sw 48th street miami, florida 33155 phone: (305) 663 -1970 fax: (305) 663 -2312 e -mail: peter ®diezarchitecture.com pedro diez, ra president or 0008996 ENGINEERING CONSULTANT PRV ENGINEERING, INC. Mechanical - Electrical - Plumbing - fire Protection 6452 NW 77 Ct., Miami, FL 33166 - Ph: 305.859.8827 - Fx: 305.856.5955 Board of Professional Enginee W, jho ization No.: 00009635 Mechanical Enginee` %S% \P oo ert Valdes YFt� PE 31326 Electrical Engvi''" % ertb Ventre y jai E 32076 PROJE be v P. ROBERT VAlOE�,`� PE #: 31326 ,,►���`�� 6747 Office Building 4th Floor 6141 SUNSET DRIVE SOUTH MIAMI, FLORIDA PROJECT No. 04- 158.04 REVISIONS SCHEDULES NOTES, AND DETAILS SCALE: AS SHOWN GREY WATER TRAP PRIMER DATE: DECEMBER 112, 2003 NTS ■ TOTAL 4