06-1828-013GENERAL HN.A.iC. NOTES
1. GENERAL
1.1 ALL WORK TO BE PERFORMED UNDER THESE DOCUMENTS SHALL CONFORM WITH THE
FLORIDA BUILDING CODE, AND ALL OTHER APPLICABLE STATE AND LOCAL
REGULATIONS AND ORDINANCES.
1.2 ALL WORK SHALL BE PERFORMED BY A LICENSED AND INSURED MECHANICAL
CONTRACTOR, IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM
SHALL BE FULLY OPERATIVE AFTER COMPLETION OF WORK.
1.3 MECHANICAL CONTRACTOR SHALL FURNISH WRITTEN GUARANTEE THAT THE INSTALLED
SYSTEM SHALL BE FREE OF MATERIALS AND WORKMANSHIP DEFECTS FOR A PERIOD
OF ONE YEAR FROM FINAL ACCEPTANCE BY THE OWNER.
1.4 MECHANICAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING HIS OWN PERMIT AND
PAYING ALL PERMIT AND INSPECTION FEES.
1.5 SUBMIT SHOP DRAWINGS FOR ACCEPTANCE BY THE ARCHITECT AND /OR ENGINEER
BEFORE PROCEEDING WITH PURCHASE OR INSTALLATION OF THE EQUIPMENT AND
MATERIALS
1.6 THE CONTRACTOR SHALL PROVIDE A SET OF PRINTS CLEARLY MARKED TO SHOW
AS -BUILT CONDITIONS AT THE COMPLETION OF CONSTRUCTION.
1.7 INTERRUPTION OF EXISTING FACILITIES AND / OR SERVICES SHALL BE KEPT
TO A MINIMUM. THE CONTRACTOR SHALL FURNISH ALL MATERIALS REQUIRED
WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY
OF SERVICES. COORDINATE ALL INTERRUPTIONS WITH OWNER.
1.8 PRECAUTIONS SHALL BE TAKEN TO PREVENT CONTAMINATION OF OWNER EQUIPMENT,
FURNITURE AND CARPETING WITHIN THIS BUILDING. COVER AND WRAP EQUIPMENT,
FURNITURE AND CARPETING AS NECESSARY. DUST AND DEBRIS SHALL BE STRICTLY
CONTROLLED. CLOSE COORDINATION WITH OWNER WILL BE REQUIRED. DURING
CONSTRUCTION CONTRACTOR SHALL FOLLOW THE "SMACNA" 1995 "INDOOR AIR
QUALITY GUIDELINES FOR OCCUPIED BUILDINGS UNDER CONSTRUCTION ".
1.9 ALL BUILDING CONSTRUCTION AFFECTED BY THE REMOVAL, RELOCATION OR
INSTALLATION OF ANY PIECE OF EQUIPMENT SHALL BE REPAIRED AND FINISHED
AS REQUIRED TO MATCH EXISTING CONDITIONS, OR AS DIRECTED BY T HE
ARCHITECTURAL DRAWINGS AND/ OR SPECIFICATIONS.
1.10 IF ANY CONFLICT IS ENCOUNTERED WITHIN THE DESIGN DOCUEMN TS, REGARDLESS
OF TRADE OR RESPONSIBILITY, THE GREATER SCOPE OF WORK SHALL PREVAIL.
2. FIELD VERIFICATION
2.1 ALL WORK SHALL BE FIELD VERIFIED BEFORE INSTALLATION AND COORDINATED
WITH ALL OTHER TRADES.
2.2 WHERE INTERFERENCES OCCUR AND DEPARTURES FROM INDICATED DESIGN
WILL BE REQUIRED TO DETERMINE CHANGES ON LOCATIONS, SIZES AND ELEVATIONS
OF PIPING, DUCTWORK, ETC. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST
FOR THE CHANGE ACCOMPANIED BY A DETAILED DRAWING FOR APPROVAL FROM
ARCHITECT/ ENGINEER PRIOR TO PROCEEDING WITH ANY CHANGE OR DEPARTURES
FROM EXISTING CONTRACT.
2.3 COORDINATE LOCATION OF DUCTWORK WITH OTHER TRADES, PARTICULARLY WHERE
DUCTS RUN THROUGH STRUCTURAL ELEMENTS. PROVIDE ALL NECESSARY SLEEVES
BEFORE CONCRETE IS POURED.
2.4 CONTRACTOR SHALL VERIFY EXISTING DUCTWORK SIZES WHICH CONNECT TO NEW
DUCTWORK BEFORE FABRICATION AND INSTALLATION.
2.5 CONTRACTOR SHALL VERIFY EXISTING PIPING SIZES WHICH CONNECT TO NEW
PIPING BEFORE FABRICATION AND INSTALLATION.
2.6 BEFORE CUTTING OR MAKING OPENINGS IN ANY BUILDING COMPONENT, CONTRACTOR
SHALL VERIFY USING ANY REQUIRED MEANS THAT ITS LOAD BEARING CAPABILITY
IS NOT COMPROMISED IN ANY MATTER.
3. NOT USED
4. NEW EQUIPMENT
4.1 ALL MECHANICAL EQUIPMENT LOCATED ON THE EXTERIOR OF THE BUILDING SHALL BE
CONSTRUCTED AND INSTALLED TO WITHSTAND HURRICANE FORCE WINDS FROM ANY
DIRECTION AS PER F.B.C.
4.2 MECHANICAL EQUIPMENT SHALL BE SUPPORTED PER MANUFACTURER RECOMMENDATIONS
AND AS REQUIRED FOR APPLICABLE CODES AND STANDARDS, USING SOUND INDUSTRY
STANDARD PRACTICES. STRUCTURAL ENGINEER DESIGN AND RECOMMENDATIONS SHALL
BE FOLLOW. SUBMIT SHOP DRAWINGS OF ALL SUPPORTING STRUCTURES THAT CLEARLY
INDICATE SIZES, MATERIAL, DESIGN AND PRODUCT APPROVAL NUMBERS.
4.3 VIBRATION ISOLATORS SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT WITH
MOVING AND /OR ROTARY PARTS. SUBMIT SHOP DRAWINGS SHOWING, BUT NOT LIMITED,
ISOLATION PERFORMANCE AND ALLOWABLE SUPPORTING LOADS.
4.4 PROVIDE FOR ALL OUTDOOR MOUNTED EQUIPMENT SURFACE AND COIL PROTECTION
AGAINST CORROSION DUE TO PROXIMITY TO MARINE AND /OR CORROSIVE ENVIRONMENT.
4.5 CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
THE CONTRACTOR SHALL FURNISH ALL MOTORS, STARTERS AND RELAYS, ETC., TO
CONFORM A FULLY OPERATING SYSTEM. COORDINATE WITH THE ELECTRICAL DIVISION
ALL WORK RELATED TO THE MECHANICAL SYSTEMS.
4.6 CONDENSATE DRAIN PIPING INSTALLED ON NON -AIR CONDITIONED SPACES SHALL BE
PROPERLY INSULATED.
4.7 PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. THE MANUAL SHALL
ESTABLISH ALL REQUIRED SCHEDULED MAINTENANCE THAT SHALL BE PERFORMED
DURING THE LIFE OF THE BUILDING TO GUARANTEE THE WORKING CONDITION OF THE
INSTALLED SYSTEM AND THE MAINTENANCE OF A PROPER I.A.Q. IN THE BUILDING.
MANUALS SHALL BE SUBMITTED TO THE ENGINEER FOR ACCEPTANCE.
4.8 EQUIPMENT DATA SHOWN IN THE EQUIPMENT SCHEDULES IS BASED ON MANUFACTURER'S
ACTUAL CATALOG, VERIFY THIS INFORMATION WITH MANUFACTURERS PRIOR TO
PURCHASING OR INSTALLING ANY EQUIPMENT. MANUFACTURER'S NAMES SHALL BE
INTERPRETED AS ESTABLISHMENT OF REQUIRED TYPE CLASS AND QUALITY. ALL
SUBSTITUTIONS SHALL BE APPROVED BY THE PROJECT ENGINEER.
4.9 PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE
MECHANICAL SYSTEM.
4.10 SEE EQUIPMENT SCHEDULES ON DRAWINGS FOR INFORMATION ON ALL SPECIFIED
EQUIPMENT FOR THIS JOB.
5. DUCTWORK
5.1 PROVIDE ALL NECESSARY ACCESS PANELS TO CONTROL VALVES, DAMPERS, SENSORS,
AND ANY OTHER DEVICES NON- ACCESSIBLE OTHERWISE.
5.2 ALL SIZES SHOWN FOR LINED AND UNLINED DUCTS ARE CLEAR INSIDE DUCT DIMENSIONS.
5.3 AIR CONDITIONED DUCTWORK, SHALL BE INSULATED CLASS "ONE" FIBER GLASS DUCT
BOARD IN ACCORDANCE WITH SMACNA'S FIBROUS DUCT STANDARDS. INSULATION SHALL
HAVE THE REQUIRED DENSITY AND THICKNESS TO PROVIDE A MINIMUM INSULATION VALUE
OF R -6.
5.4 PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR
FLOW AND BALANCE. PROVIDE MULTIPLE VANE EXTRACTORS OR SPUTTERS WITH
CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO
MAIN SUPPLY DUCT AND WHERE SHOWN.
5.5 VENTILATION AND EXHAUST AIR DUCTWORK SHALL BE OF SHEET METAL CONSTRUCTION
PER SMACNA'S STANDARDS.
5.6 EXHAUST VENTS SHALL BE LOCATED 10' MINIMUM DISTANCE FROM ANY OUTSIDE
AIR INTAKE.
5.7 SEE SCHEDULES ON PLANS FOR AIR DISTRIBUTION DEVICES SPECIFICATIONS.
6. TEST AND BALANCING
6.1 BALANCE ALL SYSTEMS TO PROVIDE FLOW QUANTITIES AND CAPACITIES AS INDICATED
ON DRAWINGS, INCLUDING EXISTING SYSTEMS AND V.A.V.
6.2 PERFORM A COMPLETE OPERATING AND BALANCING TEST OF THE FINISHED SYSTEM.
PROVIDE WRITTEN REPORT OF THE RESULT OF THIS TEST STATING THE ACCEPTABILITY
OF THE SYSTEM AND COMPLIANCE WITH THE DESIGN DOCUMENTS. TEST AND BALANCE
AGENCY SHALL BE AN INDEPENDENT, AABC OR NEBB CERTIFIED AGENCY, AND SHALL
BE RETAINED BY THE OWNER. CONTRACTOR SHALL COORDINATE WITH OWNER AND TESTING
AND COMMISSIONING AGENCY ALL WORK FOR FINAL CERTIFICATION OF THE HVAC SYSTEM.
6.3 IT IS THE RESPONSIBILITY OF THE TEST AND BALANCING TO RESET AND BALANCE
ALL COMPONENTS OF THE AIR CONDITIONING UNITS SYSTEM SERVING THE TENANT,
AND ALL OTHER BUILDING SYSTEMS SUPPORTING THE ABOVE MENTIONED DEVICES.
OMECHANICAL FLOOR PLAN
1/4°
diez
architecture,
inc.
7430 sw 48th
street
miami, florido
33155
phone: (305)
663-1970
fax: (305)
663 -2312
e -mail: peter0diezarchitecture.com
pedro diez, ra
president or
0008996
ENGINEERING CONSULTANT
Puga and Associates, Inc.
Engineers /Consultants
# EB 0005813
7326 S.W. 48th Street
Miami, Florida 33155
(305) 661 -7700
17c J2"
Oak"
4th FLOOR
6141 SUNSET DRIVE
SOUTH MIAMI, FLORIDA
PROJECT No. 04.158.041
REVISIONS
'.
1`7`
u u:
Q
Y
t
.x. '~J QAVi`0 Pu s
�' i M .hNo. 4116.3