06-1324-003TYPICAL SECTION AT WD. POST SHORE
SCALE: 1/2"=l'--O"
'4" PLYWOOD
4 "x 4" STRINGER
2"x 4" JOISTS
POST SHORES 0
3t__„"
SLAB
TYP,
TYPICAL SECTION AT CONC.
BEAM 16"x24" &16x26"
SCALE: 1/2 ",_1 >_O"
_OP OF SI4AB ^y -
CONC. SLAB TYP
3/4" PLYWOOD TYP.
2x4 WOOD JOISTS
Cg 16" 0, c.
(2) 2x4 WOOD
STRINGER TYP.
40 WD. POST
SH ORE
EXIST. CONC.
SLAB TYP.
Gp. OF SLAB �
r -- -SEE DETAIL '"A"
TYPICAL ISOMETRIC FOR POST SHORE
SCALE 3 /8"- 1'-- 0"
TYPICAL SECTION AT
CONC. BEAM 12"x24"_
SCALE: 1/2"=V-0"
'4 PLYWOOD
4 "x 4" STRINGER
2 "x 4" JOISTS
POST SHORES 0(
41-00-
SLAB
TYP.
SLAB
FA %L "A„
" PL'YVOOD
DETAIL "A"
)D POST
SLAB
CONC. BEAM 12"x3O"
SCALE: 1/2"=V-0"
/4" PLYWOOD
4 "x 4" STRINGER
2 "x 4" JOISTS
POST SHORES 0
SLAB
TYP.
Yv�w
i • s • u
i • • a
.. ' • • ••vim
GENERAL NOTES j •; •"'• , .
• •
•
f •
ALL CHANGES IN THE DRAWING LAYOUT AND SPF CI�'ICATICNS MUST BE APPROVED BY THE
ENGINEER.
THESE DRAWING HAS BEEN PREPARED BASED ON CONFIRMATION FURNISH BY THE
CONTRACTOR.
THE APPLICABLE RECOMMENDED PRACTICES OF THE SCAFFOLDING; SHORING AND FORMING
INSTITUTE, INC. AND OSHA SHALL BE FOLLOWED.
ALL EQUIPMENT MUST BE ERECTED PLUMED AND LEVEL.
IT IS THE CONTRACTOR RESPONSIBILITY FOR SAFETY REQUIREMENTS DURING ERECTiCN, USE
AND DISMANTLING OF ASSEMBLY.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE F I��LD PRIOR TO START
OF WORK AND NOTIFY ENGINEER OF ANY DISCREPANCY IN THE DRAWINGS AND OBTAIN HIS
APPROVAL BEFORE PROCEEDING WITH WORK.
THIS WORK REQUIRES A BUILDING PERMIT, DO NOT BEGIN WORKING UN71L A BUILDING PERMIT
IS OBTAINED.
CONTRACTOR TO FURNISH ALL LABOR, MATERiAL.S, SERVICES AND EQUIPMENT NECESSARY TO
COMPLETE ALL WORK SHOWN ON THE DRA'NINGS AND SPECIFIED HEREIN,
00 NOT SCALE DRAWINGS, DIMENSIONS GOVERN.
ENGINEER'S VISITS AT THE SITE DURING CONSTRUCTION SHALL BE SCHEDULED WITH
CONTRACTOR BEFORE COMMENCING OF WORK AND DURING CONSTRUCTION SHAI._I._ BE
COORDINATED WITHIN 24 HOURS IN ADVANCE PRIOR TO INSPECTION.
THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL SERVICES OR WORK 'vWITHOUT
PRIOR NOTIFICATION TO THE OWNER, FOLLOWED BY A CHANGE ORDER.
THE CONTRACTOR SHALL MAKE REQUIRED ARRANGEMENTS, SECURE AND PAY FOR ALL
SANITARY FACILITIES, BARRICADES, ENCLOSURES, AND FENCING AS NEEDED FOR AND DURING
THE PROGRESS OF CONSTRUCTION. CON. TRACTOR SHALL PROTECT ;"ADJACENT PROPERTIES.
CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF CHANGE ORDERS AND VARIATIONS
THROUGHOUT THE PROGRESS OF THE WORK. USE ONE SET OF DOCUMENTS EXCLUSIVELY FOR
THIS JOB. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING HIS CONSTRUCTION
DOCUMENTS WITH ANY REVISED DRAWINGS AND SPECIFICATIONS, FIELD ORDERS, CHANGE
ORDERS, AND CLARIFICATION SKETCHES ISSUED DURING _I HIE COURSE. OF CONSTRUCTION.
CONTRACTOR SHALL_ DELIVER THE ANNOTATED JOB RECORD SET TO THE OWNER UPON
COMPLETION OF THE WORK, AS A CONDITION OF ACCEPTANCE:,
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS OP' CONSTRUCTION, AND
'FOR THE SEQUENCES AND PROCEDURES TO BE USED.
T HESE DWGS. ARE NOT VALID WITHOUT 'THE SIGNATURE AND RAISED SEAL OF THE
STRUCTURAL ENGINEER
'THESE DWGS. ARE ONLY VALID FOR THE ADDRESS LISTED IN THE TITLE BLOCK OF ABBE R AND
ASSOC.
I
3, O ".
A sip"
ml
SCALE 3/8 " -- l'-- 0" � - - - --
Y i •
i
.•.
•
Y i
(2)2X4 WOOD
STRINGER (TYP,)
2'X 4 . WOOS}. _
f J6Ist fir;,,
1
•
S T RINGER (TYP.)
i
DATE; 04-2706)
i
t
y�N
4 Z( 4j ELMS
I SH - -11
4
SHORE'!, (TYP. )
wo, 0'
4,,POS 5H 2,
•
•
�
i
s
u •
Iz
MAY 0 2 2ZINS
0
•
• w v
LL'
J •
0
€
0
I
GENERAL NOTES j •; •"'• , .
• •
•
f •
ALL CHANGES IN THE DRAWING LAYOUT AND SPF CI�'ICATICNS MUST BE APPROVED BY THE
ENGINEER.
THESE DRAWING HAS BEEN PREPARED BASED ON CONFIRMATION FURNISH BY THE
CONTRACTOR.
THE APPLICABLE RECOMMENDED PRACTICES OF THE SCAFFOLDING; SHORING AND FORMING
INSTITUTE, INC. AND OSHA SHALL BE FOLLOWED.
ALL EQUIPMENT MUST BE ERECTED PLUMED AND LEVEL.
IT IS THE CONTRACTOR RESPONSIBILITY FOR SAFETY REQUIREMENTS DURING ERECTiCN, USE
AND DISMANTLING OF ASSEMBLY.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE F I��LD PRIOR TO START
OF WORK AND NOTIFY ENGINEER OF ANY DISCREPANCY IN THE DRAWINGS AND OBTAIN HIS
APPROVAL BEFORE PROCEEDING WITH WORK.
THIS WORK REQUIRES A BUILDING PERMIT, DO NOT BEGIN WORKING UN71L A BUILDING PERMIT
IS OBTAINED.
CONTRACTOR TO FURNISH ALL LABOR, MATERiAL.S, SERVICES AND EQUIPMENT NECESSARY TO
COMPLETE ALL WORK SHOWN ON THE DRA'NINGS AND SPECIFIED HEREIN,
00 NOT SCALE DRAWINGS, DIMENSIONS GOVERN.
ENGINEER'S VISITS AT THE SITE DURING CONSTRUCTION SHALL BE SCHEDULED WITH
CONTRACTOR BEFORE COMMENCING OF WORK AND DURING CONSTRUCTION SHAI._I._ BE
COORDINATED WITHIN 24 HOURS IN ADVANCE PRIOR TO INSPECTION.
THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL SERVICES OR WORK 'vWITHOUT
PRIOR NOTIFICATION TO THE OWNER, FOLLOWED BY A CHANGE ORDER.
THE CONTRACTOR SHALL MAKE REQUIRED ARRANGEMENTS, SECURE AND PAY FOR ALL
SANITARY FACILITIES, BARRICADES, ENCLOSURES, AND FENCING AS NEEDED FOR AND DURING
THE PROGRESS OF CONSTRUCTION. CON. TRACTOR SHALL PROTECT ;"ADJACENT PROPERTIES.
CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF CHANGE ORDERS AND VARIATIONS
THROUGHOUT THE PROGRESS OF THE WORK. USE ONE SET OF DOCUMENTS EXCLUSIVELY FOR
THIS JOB. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING HIS CONSTRUCTION
DOCUMENTS WITH ANY REVISED DRAWINGS AND SPECIFICATIONS, FIELD ORDERS, CHANGE
ORDERS, AND CLARIFICATION SKETCHES ISSUED DURING _I HIE COURSE. OF CONSTRUCTION.
CONTRACTOR SHALL_ DELIVER THE ANNOTATED JOB RECORD SET TO THE OWNER UPON
COMPLETION OF THE WORK, AS A CONDITION OF ACCEPTANCE:,
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS OP' CONSTRUCTION, AND
'FOR THE SEQUENCES AND PROCEDURES TO BE USED.
T HESE DWGS. ARE NOT VALID WITHOUT 'THE SIGNATURE AND RAISED SEAL OF THE
STRUCTURAL ENGINEER
'THESE DWGS. ARE ONLY VALID FOR THE ADDRESS LISTED IN THE TITLE BLOCK OF ABBE R AND
ASSOC.
I
3, O ".
A sip"
ml
SCALE 3/8 " -- l'-- 0" � - - - --
Y i •
i
.•.
•
Y i
(2)2X4 WOOD
STRINGER (TYP,)
2'X 4 . WOOS}. _
f J6Ist fir;,,
1
S T RINGER (TYP.)
i
DATE; 04-2706)
i
t
y�N
4 Z( 4j ELMS
I SH - -11
4
SHORE'!, (TYP. )
wo, 0'
4,,POS 5H 2,
I
I
I
�
i
I
e
I
I
I
'
z_
RECEIVED
Iz
MAY 0 2 2ZINS
0
RAC IVED
MAY 2 3 2008
GF GOINSULTiNG ENGINEERS
jp,q,
GF CONSULTING ENGINEERS .r • .
•;��� Xv
Jr` ,
. �p7E
,}iii � i♦ .. �����
REVISIONS:
1
i
DATE; 04-2706)
i
t
I SH - -11
4
�
I
I
I
�
i
I
e
I
I
I
'
z_
Iz
0
LL'
0
€
0
I
i I
I it
�
I
I
�
f
Iz
1
F
t
t
k
I
'
E
}
I
} LLJ
0
Q
i ry
S
Q
U
_J
!
W
1O 11
(V)
I LL LLJ
X f
o !
i
w z
i
O €
0
Iz
! X
I•--
Q
O I
0 c0
U
W
n
E
W
Q UJ !� E
L:_j
0 0
V) }-'-j r-f) n
T
�� I
. •M�s,yif��
(,�i
�...�
�Cr
0
Tyr
< j
_: !
,}iii � i♦ .. �����