Loading...
06-113(2)-014P -001 PLUMBING LEGEND, GENERAL NOTES, SHEET INDEX AND SCHEDULES P -101 PLUMBING FIFTH FLOOR PLAN P -201 SANITARY & VENT RISER DIAGRAM A P -202 DOMESTIC WATER RISER DIAGRAM COUNTERTOP USE TWH -1 TO FEED A SINGLE MLV AND TWH -2 FOR 2 OR 3 MLV ON S N FAUCET TYPICAL MEDICAL SINK (MLV). F- SUPPLY STOP FLOW CONTROL WATER HEATER NTH UNION FLOW CONTROL VALVE TANKLESS ELECTRIC WATER NEATER PERFORATED vENT CAP G.O. PLUG SLOPE Ya' r 3" r z NV 01-1 A/C UNIT DRAIN PAN CONDENSATE TRAP DETAIL NOT TO SCALE NOTE: 1. ALL PIPING BETWEEN WATER HEATER AND FAUCET SHALL BE MINIMUM \ ", 2. ALL SUPPLY PIPING TO TWH SHALL BE [ "- MIN. 3. COORDINATE WITH ARCHITECTURAL DRWGS FOR EXACT LOCATION OF TANKLESS WATER HEATER PRIOR TO ROUGH -IN, PLUMBING SPECIFICATIONS 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FOR A COMPLETE PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH ALL LABOR TO INSTALL ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL PLUMBING AND BUILDING CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION. 2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY POSSIBLE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB CONDITIONS. 3. VERIFY ALL POINTS OF CONNECTION WITH' UTILITIES PRIOR TO START INSTALLATION. 4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCHITECTURAL DRAWINGS AND COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS. 5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTIION REQUIRED TO COMPLETE INSTALLATION AS INTENDED. 6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AND PROVIDE ACCESS PANELS TO REACH WATER DISTRIBUTION SYSTEM'S VALVES. 7. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF PENETRATIONS WATER TIGHT. 8. BUILDING DRAINAGE SYSTEM DESIGN BASED ON -" FT. MINIMUM FALL. 9. PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND METER ROOM FOR GROUND. 10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES, BROOKS OR EQUAL. 11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTING'S SHALL BE PVC OR DWV (ASTM -D- 2662). B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C. C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -B -88) TYPE "L" ABOVE GROUND & TYPE "K" UNDERGROUND. D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED F'OR CONNECTION TO DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SUPPLY. E INSULATE ALL HOT WATER LINES WITH Y2" FIBERGLASS WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KO'HLER, CRANE OR EQUAL. G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAL, FLOOR DRAINS SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLASSLINED, 5 YEARS GUARANTEED A.O., SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL. J HOSE BIBBS CHICAGO 952, OR EQUAL. K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED ESCUTCHEON'S AS REQUIRED. 12. PERFORM THE FOLLOWING TESTS: A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 PSIG. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE: ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR. B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS PRIOR TO PLACING SYS-TEM IN OPERATION, 13. STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFECTIVES DURING THAT PERIOD. VACUUM RELIEF VALVE I S11T-11F VALVE t C &HW SEE FLOOR PLAN FOR SIZES EXPANSION TANK THERMOMETER T 0. O OCI ICC VAI \/C OF CW SUPPLY TO FIXTURE CHROME PLATED WALL ESCUTCHEON SUPPLY STOP �L a e ELECTRIC WATER HEATER INSTALLATION DETAIL NOT TO SCALE PLUMBING FIXTURE CONECTION SCHEDULE PLUMBING SYMBOL LEGEND AFF - ABOVE FINISH FLOOR CD - CONDENSATE DRAIN CD - CONDENSATE DRAIN 3" - DOMESTIC COLD WATER - CO - CLEANOUT LAVATORY - SANITARY MAX/MIN CON - CONTINUATION SK - SANITARY VENT 1 \° CW - DOMESTIC COLD WATER WALL MOUNTED, FLUSH TANK - STORM MEDICAL LAVATORY DN - DOWN - - DOMESTIC HOT WATER SH DWG - DRAWING -I - HOSE BIBB EXIST - EXISTING LOUNGE RM. SINK - CLEAN OUT PLUG Y2" FD - FLOOR DRAIN JSK - GAS 1 \" H13 - HOSE BIBB O CO - FLOOR CLEAN OUT IE - INVERT ELEVATION 98.5 % 12.0 LBS NOTE: SOME FIXTURES MAY NOT BE USED ON THIS FLOOR. SEE DRAWINGS. oc - FLOOR DRAIN KW - KILOWATT LBS - POUNDS NOTES: - BALL VALVE NIC -NOT IN CONTRACT L� - BALANCING VALVE NTS - NOT TO SCALE �p�p� - CHECK VALVE(SWING) PRV - PRESSURE REDUCING VALVE - PRESSURE REDUCING VALVE PSI - POUNDS PER SQUARE INCH - SOLENOID OPERATED VALVE RD - ROOF DRAIN RPBP - REDUCED PRESSURE BACKFLOW RPBP - REDUCED PRESSURE BACKFLOW PREVENTER PREVENTER NTH STRAINER SAN - SANITARY - RELIEF OR SAFETY VALVE SD - STORM DRAIN - VALVE ON RISER SF - SQUARE FEET - CAP ST - STORM - ELBOW, TURNED UP V -VENT C - ELBOW, TURNED DOWN VTR -VENT THRU ROOF -TEE SHEET INDEX - TEE, TURNED UP - TEE, TURNED DOWN P -001 PLUMBING LEGEND, GENERAL NOTES, SHEET INDEX AND SCHEDULES P -101 PLUMBING FIFTH FLOOR PLAN P -201 SANITARY & VENT RISER DIAGRAM A P -202 DOMESTIC WATER RISER DIAGRAM COUNTERTOP USE TWH -1 TO FEED A SINGLE MLV AND TWH -2 FOR 2 OR 3 MLV ON S N FAUCET TYPICAL MEDICAL SINK (MLV). F- SUPPLY STOP FLOW CONTROL WATER HEATER NTH UNION FLOW CONTROL VALVE TANKLESS ELECTRIC WATER NEATER PERFORATED vENT CAP G.O. PLUG SLOPE Ya' r 3" r z NV 01-1 A/C UNIT DRAIN PAN CONDENSATE TRAP DETAIL NOT TO SCALE NOTE: 1. ALL PIPING BETWEEN WATER HEATER AND FAUCET SHALL BE MINIMUM \ ", 2. ALL SUPPLY PIPING TO TWH SHALL BE [ "- MIN. 3. COORDINATE WITH ARCHITECTURAL DRWGS FOR EXACT LOCATION OF TANKLESS WATER HEATER PRIOR TO ROUGH -IN, PLUMBING SPECIFICATIONS 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FOR A COMPLETE PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH ALL LABOR TO INSTALL ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL PLUMBING AND BUILDING CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION. 2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY POSSIBLE CONFLICTS PRIOR TO COMMENCING WORK. DO NO WORK UNTIL ALL ISSUES ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB CONDITIONS. 3. VERIFY ALL POINTS OF CONNECTION WITH' UTILITIES PRIOR TO START INSTALLATION. 4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCHITECTURAL DRAWINGS AND COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS. 5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTIION REQUIRED TO COMPLETE INSTALLATION AS INTENDED. 6. PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AND PROVIDE ACCESS PANELS TO REACH WATER DISTRIBUTION SYSTEM'S VALVES. 7. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF PENETRATIONS WATER TIGHT. 8. BUILDING DRAINAGE SYSTEM DESIGN BASED ON -" FT. MINIMUM FALL. 9. PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND METER ROOM FOR GROUND. 10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES, BROOKS OR EQUAL. 11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTING'S SHALL BE PVC OR DWV (ASTM -D- 2662). B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C. C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -B -88) TYPE "L" ABOVE GROUND & TYPE "K" UNDERGROUND. D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED F'OR CONNECTION TO DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SUPPLY. E INSULATE ALL HOT WATER LINES WITH Y2" FIBERGLASS WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KO'HLER, CRANE OR EQUAL. G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAL, FLOOR DRAINS SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLASSLINED, 5 YEARS GUARANTEED A.O., SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL. J HOSE BIBBS CHICAGO 952, OR EQUAL. K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED ESCUTCHEON'S AS REQUIRED. 12. PERFORM THE FOLLOWING TESTS: A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 PSIG. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE: ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR. B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS PRIOR TO PLACING SYS-TEM IN OPERATION, 13. STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFECTIVES DURING THAT PERIOD. VACUUM RELIEF VALVE I S11T-11F VALVE t C &HW SEE FLOOR PLAN FOR SIZES EXPANSION TANK THERMOMETER T 0. O OCI ICC VAI \/C OF CW SUPPLY TO FIXTURE CHROME PLATED WALL ESCUTCHEON SUPPLY STOP �L a e ELECTRIC WATER HEATER INSTALLATION DETAIL NOT TO SCALE PLUMBING FIXTURE CONECTION SCHEDULE MARKS DESCRIPTION WASTE C.W. H.W. REMARKS WC WATER CLOSET 3" HA -3 - WALL MOUNTED, FLUSH TANK LV LAVATORY MODEL MAX/MIN RISE WALL HUNG SK SINK 1 \° \"- - WALL MOUNTED, FLUSH TANK ML MEDICAL LAVATORY 1I„ 0.5 GPM - COUNTERTOP SH SHOWER 2" Y2" Y2" ANTI -SCALD MIXING VALVE LSK LOUNGE RM. SINK 1 \" Y2" Y2" COUNTERTOP JSK JANITOR SINK 1 \" Y2" Y2" SEE ARCH DWGS. 240 -1 93.6 EA. 1 98.5 % 12.0 LBS NOTE: SOME FIXTURES MAY NOT BE USED ON THIS FLOOR. SEE DRAWINGS. TANKLESS WATER HEATER SCHEDULE MARK * P.D.I. SIZE CONN. SIZE HA -1 A (1 -11 F.U.) INPUT TEMP WATER 3/4" HA -3 C (33 -60 F.U.) 1" UNIT NO MODEL MAX/MIN RISE FLOW VOLT AMPS CIRC. EFF WEIGHT TWH -1 EEMAX SP4208 - 56' F 0.5 GPM 208 -1 19.7 EA. 1 99% 3.0 LBS TWH -2 EEMAX SP8208 - 57' F 1 GPM 208 -1 40 EA. 1 99% 3.0 LBS TWH -3 TANKLESS WATER HEATER 220 _ 60' F 3.0 GPM 240 -1 93.6 EA. 1 98.5 % 12.0 LBS NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR EXACT MOUNTING LOCATION OF ALL UNITS, 2. PROVIDE A Y" C &H WATER LINE. INSTALL A FLOW STOP ON CW SUPPLY LINE. 3. PROVIDE AN EWH -1 WITH A 0.5 GPM AERATOR ON ALL EXAM ROOM, LABORATORY SINKS AND LAVATORIES. 4. PROVIDE AN EWH -2 WITH A 1.0 GPM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS, 5. PROVIDE AN EM -3 FOR JANITOR SINKS AND AS INDICATED ON THE DRAWINGS. FINISHED WALL GRAB BAR (BY OTHERS) THE HANDLE OF THE FLUSH LEVER SHALL FACE THE WIDE SIDE OF THE STALL(NO EXCEPTIONS!). Q a O 'n C.) TER CLOSET I¢ 4 a a i e WATER CLOSET ACCESSIBLE NTS WATER HAMMER ARRESTER SCHEDULE MARK * P.D.I. SIZE CONN. SIZE HA -1 A (1 -11 F.U.) 1/2" HA -2 B (12 -32 F.U.) 3/4" HA -3 C (33 -60 F.U.) 1" * PLUMBING AND DRAINAGE INSTITUTE STANDARD WH -201 REFER TO FLOOR PLANS FOR TYPE OF FIXTURE CONNECTED TO P -TRAP JAY R. SMITH(FIG. NO. 2698) WATER SAVER P -TRAP NTH PRIMER TUBE(CHROME PLATED) FLOOR DRAIN ESCUTCHEON CLEANOUT PLUG PRIMER TUBE(CHROME PLATED) FINISHED WALL FINISHED FLOOR e J • wz 1/2 " TYPE "K" SOFT SEAMLESS COPPER NTH NO JOINTS BELOW FLOOR SLAB, SLOPE AT 1/8 " PER FOOT MINIMUM TO FLOOR DRAIN CONNECTION. GREY WATER TRAP PRIMER NTS diez architecture, inc. 7430 sw 48th street miami, florida 33155 phone: (305) 663 -1970 fax: (305) 663 -2312 peter©diezarchitecture.com pedro diez ar 0008996 ENGINEERING CONSULTANT PRV ENGINEERING, INC. Mechanical - E9eVkobl-- P@bW*q Ftrffeo%ofeation 645214W 77 Ct., Miami, FL 33(.6&- P%Alty .Y9.8827 • Fx 305- 856 -5955 Board of Professio,.I En ineA Authon�zhn No.: 00009635 Mechanical EnIJ Q.Fach at �j PE 31326 Electrical �+Vq1iMe>�r..' Rigoberto Vetie r E 32076 PRO,1f Nek .N DOP. QYB k P. ROBERT VALd1!����, PE #: 31326 G141 Office Building 5th Floor 6141 SUNSET DRIVE SOUTH MIAMI, FLORIDA PROJECT No. 04- 158.05 REVISIONS FIFTH FLOOR SCHEDULES, NOTE LEGEND + DETAILS 4