Loading...
05-1856R-004Al FINISH SCHEDULE FLOOR ROOM NAME FLOOR BASE WALLS CEILING LC% REMARKS WOO D PAINT PAINT 0008996 ENGINEERING CONSULTANT S E NOTES 9 1 6 SEE NOTES 1 N O U. z v g ., z SEE NOTES 1 N U� � SEE NOTES 1 °•3 � � SEE NOTES 14, I6 K C4 c� Q Q in 0 Q O Q O SEE NOTES 14 U Q SEE NOTES 14 a> U> U WW SEE NOTES 14 a S SEE NOTES 1 to W a5 C�7 CORRIDORS • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS ac WAITING ROOM • • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS SEXAM ROOMS • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS u- Q MEN • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS WOMEN • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS LAB/DRUG OFFICE • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS OFFICES • • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS X STORAGE • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS BREAKROOM • • } • • REFER TO REFLECTED CEILING FOR ELEVATIONS CONFERENCE ROOMS • • • • REFER TO REFLECTED CEILING FOR ELEVATIONS JANITOR ROOM • • } • • REFER TO REFLECTED CEILING FOR ELEVATIONS PBX ROOM L • - • - SEE NOTES 1, 11 } • - - - • WINDOW NOTES 1. FIELD VERIFY ALL OPENINGS PRIOR TO ORDERING WINDOWS 2. INTERIOR WINDOWS TO BE 1/4' CLEAR CATEGORY 2 TEMPERED GLASS IN ALUM FRAMES, FOR INTERIOR APPLICATIONS 3. SUBMIT SHOP DRAWINGS OF ALL WINDOWS, TO ARCHITECT FOR REVIEW FINISH NOTES: I. ALL GYP. BOARD SHALL BE TAPED, SPACKLED AND SANDED SMOOTH TO RECEIVE TWO COATS OF SEMI GLOSS INTERIOR LATEX PAINT. COLOR SELECTED BY DEVELOPER 2. ALL FLOORING t0 BE SELECTED BY DEVELOPER 3. AGCOUSTICAL CEILING TO BE ARMSTRONG OR EQUAL 2'x2' ON A WHITE 15/16' GRID, GEORGIAN TEGULAR STYLE. 4. SUBMIT SAMPLES OF TILES TO ARCHITECT 4 VCT TO ARCHITECT FOR REVIEW 5. PROVIDE CARPET REDUCERS AT ALL CHANGE OF MATERIAL LOCATIONS 6. PROVIDE A I' WIDE SOLID COLOR VINYL STRIP is ALL CORRIDOR TO DOOR LOCATIONS WHERE FLOORING MATERIALS CHANGE 1. INTERIOR FINISHES SHALL BE OF CLASS B. FLAMESPREAD 26 -15, SMOKE DEVELOPED 0 -450. TYPICAL 6. WOOD DOORS TO BE PAINTED FINISH. S. CERAMIC TILE WORK a TOILETS TO HAVE COVED BASES AND ASSOCIATED TRIM. TENANT TO SELECT COLOR, 10. PROVIDE A 2' WIDE MARBLE THRESHOLD ® DOORS FROM TOILETS TO CORRIDOR AND a LOBBY TO HALLWAY. PAMMON LEGEND W -1 EXISTING W CONC. BLOCK WALL, PROVIDE 5/8' GYP. BD. OVER 1/8' METAL FURRING a 24' OC. TD 9' -6' A.F.F. is INTERIOR W/ ALFOIL R -4.2 INSULATION TO UNDERSIDE OF DECK P -1 NEW 3 5/8' 25 GA METAL STUDS a 24' OC W/ 5/8' GYP. BD 9 EACH SIDE TO V -6' AFF., PROVIDE 4' THICK FIBERGLASS INSULATION WHERE SHOUJN IN PLANS PROVIDE 20 GA STUDS 9 PHONE ROOMS 4 WHERE CABINETRY IS SUPPORTED, PARTITION TO BE BRACED TO STRUCTURE ABOVE ® 4'•0' OC P -2 NEW I HR FIRE RATED PARTITION 3 5/8'25 GA METAL STUDS s 24' OC. W/ ONE FULL LENGTH LAYER OF 5/8' TYPE 'X' GYP. BD APPLIED VERTICALLY WITH 1' LONG % DRYWALL SCREWS TO EACH SIDE SCREWS ARE 8' O.G. is PERIMETER AND 12' OC. AT THE INTERMEDIATE STUDS. UL • 465 P -3 NEW 6' 25 GA METAL STUDS a 24' OC W/ 5/8' GYP. BD 9 EACH SIDE TO 8' -6' AFF. VERIFY MOUNTING OF CABINETS, COUNTERTOPS, ETC t PROVIDE 12 GAUGE ANCHOR PLATES BETWEEN STUDS THE LENGTT OF THE ITEM. 4' SOUND INSULATION s WALLS. WHERE NOTED. P -4 NEW 15/8' 25 GA METAL STUDS s 24' OC W/ 5/8' GYP. BD e EACH SIDE TO V -6' AFF. P -5 NEW 3 5/8' 25 GA METAL STUDS 9 24' OC W/ 5/8' GYP. BD 4 SOUND BATTING TO UNDERSIDE OF STRUCTURE P -6 NEW 3 5/8' 25 GA METAL STUDS a 24' OC W/ 5/8' GYP. BD a INTERIOR SIDE TO 9' -6' A.F.F. P -1 NEW 3 5/8'25 GA METAL STUDS a 24' OC W/ 5/8' GYP. BD TO UNDERSIDE OF STRUCTURE )K NOTE: REFER TO REFLECTED CEILING FOR ROOMS RECEIVING GYP. BD. SOFFIT d ELEVATIONS DOOR NOTES: 1- ALL WOOD DOORS SHALL BE PAINTED SEMI GLOSS LATEX FINISH 2- NOT USED 3- SUBMIT SHOP DRAWINGS OF ALL DOORS 4 FRAMES TO ARCHITECT FOR REVIEW 4- ALL DOORS AND HARDWARE SHALL COMPLY WITH SECURITY AND FORCED ENTRY REQUIREMENTS AND ALL OTHER REQUIREMENTS AND THE AMERICAN DISABILITIES ACT. 5- ALL HOLLOW METAL AND WOOD DOORS TO HAVE LATCHSET OR LOCKSETS, LEVER DESIGN. BRUSHED SS FINISH. 6- ALL METAL AND SOLID CORE DOORS TO HAVE 1V2' PAIR OF STEEL HAGER HINGES FULL MORTISE 02'4/2' 1- PROVIDE WALL DOOR STOP, HAGER MODEL 232W, STAINLESS STEEL AND FLOOR STOP HAGER MODEL 241F OR EQUAL 8- INTERIOR STOREFRONT DOORS TO BE 1/4' CLEAR TEMPERED GLASS CATEGORY 2 IN WHITE ESP, ALUM FRAMES, W/ CONCEALED CLOSER 4 SS OFFSET PUSH/ FULL HANDLES a EACH SIDE 1' P SUBMIT SHOP OU65 OF ALL GLAZING SYSTEMS. 9- PROVIDE DOOR CLOSER s FIRE RATED DOORS 10- SYMBOL ®= EXISTING FIRE RATED DOOR TO REMAIN. II- HINGES TO ALLOW FOR 180 DEGREE DOOR SWING. PROVIDE DOOR STOP a BOTH ENDS OF SWING AS REQUIRED. CLOSER TO RETURN TO CLOSED POSITION. 12- DOOR TO BE I HOUR FIRE RATED - 4' -0' - - TOW VE TUlO PAIR OF HINGES. - - - - - - - - B- UNDERCUT ALL TOILET ROOM DORS 1'. 16- DOOR TO HAVE NO LOCKING DEVICES ON EITHER SIDE. DOOR NOT SUBJECT TO LOCKING. c. FI 01 C DOOR TYPE ELEVATIONS 1/4 X PHEDULE: THIRD FLOOR TRIAL FINISH LABEL / FIRE RATING UNDER CUT HDW. REMARKS 663 -2312 peter ®diezarchitecture.com WOO D PAINT PAINT 0008996 ENGINEERING CONSULTANT S E NOTES 9 1 6 SEE NOTES 1 SEE NOTES 16 SEE NOTES 1 SEE NOTES 1 SEE NOTES 14, I6 SEE NOTES 1 SEE NOTES 14 SEE NOTES 14 SEE NOTES 14 SEE NOTES 14 SEE NOTES 1 } } } } - - - SEE NOTES 1, 11 } - - - SEE NOTES 1 r r r r r r r r r r r r SEE NOTES 13 r SEE NOTES 13 r SEE NOTES 13 r SEE NOTES 13 } SEE NOTES 13 } - - SEE NOTE 11 r r METAL I HOUR - - SEE NOTE 1, 9 WOOD - - - SEE NOTE 1 r CATEGORY 2 SAFETY GLAZING TYPICAL DOUBLE SWING DOOR A AS BUI!_TS THE REVISIONS SHOWN ON THESE SET OF DRAWINGS HAVE BEEN COPIED FROM THE CONTRACTOR'S AS -BUILT MARK UP SET. SUCH REVISIONS REFLECT CHANGES AND FIELD COORDINATIONS DONE BY THE CONTRACTOR DURING THE COURSE OF CONSTRUCTION. DIEZ ARCHITECTURE, INC. IS NOT RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION CONTAINED HEREIN. APPROWD BY MIAWBADE COUNTY FIRE K SPy�.__B DG. PERMIT WATER AIN EXTISN DATEq ,- _ - - - - -- - -- Z A. >a> u re, . , 7430 sw 48th street miami, florida 33155 phone: (305) 663 -1970 fax: (305) 663 -2312 peter ®diezarchitecture.com pedro diez, ra president Or 0008996 ENGINEERING CONSULTANT G141 Office Building 3rd Floor 6141 SUNSET DRIVE SOUTH MIAMI, FLORIDA PROJECT No. 04- 158.03 REVISIONS 10 11 -14 -2005 08-11-2006 DOOR + FINISH SCHEDULES THIRD FLOOR 9 : . _•`' SCALE: AS SHOWN DATE: NOVEMBER 2. 2005 A7.0