Loading...
05-1856R-002FIRE SPRINKLER GENERAL NOTES ) Al 1- THE SCOPE OF WORK FOR THIS PROJECT INCLUDE THE ADJUSTMENT OF EXISTING= UPRIGHT � SPRINKLER HEADS TO A NEW PENDANT SYSTEM ACCORDINGLY TO THE NEW OFFICE LAYOUT. CONTRACTOR SHALL PROVIDE ALL THE ADDITIONAL PIPING -s, FITTINGS AND HEADS TO FURNISH A SYSTEM AS SHOWN IN THIS DRAWING. 2- COORDINATE LOCATION OF FIRE SPRINKLER LINES AND HEADS WITH OTHER TRADES 3- COORDINATE HEIGHT OF SPRINKLER HEADS WITH FINISHED CEILING HEIGHTS AS INDICATED ON THE ARCHITECTURAL DRAWINGS 4- MAXIMUM AREA AND DISTANCE COVERAGE PER SPRINKLER HEAD SHALL BE AS SET FORTH BY NF.PA. BULLETIN 13 5- MINIMUM DISTANCE FROM SPRINKLER HEAD TO ANY OBSTRUCTIVE ELEMENT SUCH AS LIGHT, AIR DISTRIBUTION DEVICES, ETC. SHALL BE AS SET FORTH BY NF.PA. BULLETIN 13. 6- ALL PIPING SHALL BE AS SET FORTH BY NF.PA. BULLETIN 13 '1- TEST ALL NEW PIPING AS REQUIRED AT 250 PSIG. 8- CONTRACTOR SHALL PROVIDE A COMPLETE SET OF SHOP DRAWING INCLUDING CALCULATIONS. 9- HEADS TO BE CENTERED IN TILES 8' -6' OR OIL 9' -0' A.F.F. ACOUSTICAL LAY -IN PANEL FINISHED FACE OF WALL GALVANIZED STEEL WIRE HANCsER METAL CEILING SUSPENSION SYSTEM CEILING ANGLES CONTINUOUS TYPICAL SUSPENDED ACOUSTICAL TILE CEILING 4 : 3 518' 20 CAA STUDS w 24' OC ANCHORED TO JOISTS ABOVE a EDGE OF SOr'� ACCOUSTICAL CEILING S' -6' OR OL 9' -0' AFF. 1 8' -6' AFF. GYP. BD. HEADER NTS DETAIL AT CORRIDOR NTS 08 WIRE HANGERS AT 4' -0' ON CENTER 1 1/2' C.R. CHANNEL AT 4' -0' ON CENTER I 1 /2'DRYWALL FURRING CHANNEL CLIP 8' -0' 'm TOILETS OR WHERE NOTED 5 /a'GYPSUM BOARD '1/8' FURRING CHANNELS AT 24' ON CENTER FINISHED FACE OF WALL TYPICAL SUSPENDED GYPSUM BOARD CEILING NTS .+ti \� °z ,;` mm miami, florida 33155 phone: (305) 663 -1970 'iix 663 -2312 iZw re.com pedro diez, ra president or 0008996 ci i w xaa a rc I u re e cr+°v 3 a, 7430 sw 48th street miami, florida 33155 phone: (305) 663 -1970 fax: (305) 663 -2312 peter ®d ieza rch itectu re.com pedro diez, ra president or 0008996 ENGINEERING CONSULTANT 6747 office Building 3rd Floor 6141 SUNSET DRIVE SOUTH MIAMI, FLORIDA PROJECT No. 04- 158.03 REVISIONS A 11 -14 -2005 0 08-11-2006 THIRD FLOOR REFLECTED CEILING Cl) 491 . �; '`acc:,,,,,,w,,,,.a,,,,,,.aa,,, ,,,.a»a:i?wa\;`w��iaw r""o•�.�'�:i<ia;�.a:: V.,a�,:..'�:.', ,, .1 SCALE: AS SHOWN DATE: NOVEMBER 2, 2005 A3.0