Loading...
05-1856-017FLOOR GLAD SEQUENCE OF OPERATION A. THE UNIT EVAPORATOR FAN SHALL RUN CONTINUOUSLY. B A RISE OF LEAVING AIR TEMPERATURE ABOVE SETPOINT WILL CAUSE THE COMPRESSOR TO START. THE ELECTRONICALLY CONTROLLED HOT GAS VALVE WILL MODULATE IN RESPONSE TO THE ELECTRONIC LEAVING AIR TEMPERATURE SENSOR TO MAINTAINING LEAVING AIR TEMPERATURE SETPONT. C. WHEN TM RETURN AIR TEMPERATURE FALLS BELOW THE LEAVING AIR TEMPERATURE SET FONT, THE COMPRE86OR SHALL TUIW40FP AND THE BYPASS VALVE SHALL CLOGS D. THE STATIC PRESSURE SENSOR SHALL MODULATE THE DYPABG DAMPER TO MAINTAIN THE SUPPLY DUCT PRESSURE SETPONT. E BOTH, THE RETURN AND OUTSIDE AIR DAMPERS 814ALL WORK N CONJUNCTION TO MAINTAIN SPECIFIED OUTSIDE - RETURN AIR RATIO DURMCs NORMAL OPERATING HOUR& OUTSIDE AIR DAMPER SHALL GO TO MINIMUM 10081TICN AND RETURN AIR DAMPER TO MAXIMUM DURING UNOCCUPIED TIME 804EDULE. DDC CONTROLLER 120 VAC POWER SOURCE (BY DIVISION 16) NOTE: L PROVIDE ALL SYSTEM INF ATION AT ONE CENTRAL LOCATION. CONTROLLER TO HAVE LCD OPERATOR'S DISPLAY PROVIDE SCHEDULING 4 EXPANSION CAPABILITY 2. DUCT SMOKE DETECTOR AS REQUIRED BY NATIONAL FIRE PROTECTION ASSOCIATION (AFPA) REGULATIONS AND N ACCORDANCE WITH NATIONAL AND LOCAL ELECTRICAL CODES. GEE MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATION AND GLIANTITIES. PROVIDED 4 WIRED BY DIVISION 16. TO VAV UNITS CONSTANT VOLUME AC UNIT WITH HOT GAS BYPASS CONTROL SEE MECHANICAL PLANE AND 8CHECULE8 FOR QUANTITIES FAN BECT JBULATION AS SPECIFIED PASSES, HROUG.44 PIPE SLEEVE. PROVIDE 0AMCA.A6 INSULATION THROUGH SMOKE VIBRATION 160LATICN ND /OR FIRE FLOOR SLAB PAD ALL AROUND TOP OF CURD UNDER IR U - 24 ...:a. PIPE FLOOR SLAB PENETRATION No Sea Is PROVIDE MIANF. RECD SERVICE CLEARANCES (rt -44 Wbx12 CROSSBEAM WITH #• Gu88ET PLATE WELDED ON SITE FACTORY FABRICATED ROOF CURB rC —COIL SECTION FILTER SECTION MVD BIRDSCREEN MIN. SUPPLY RETURN DUCT DUCT NOTE: ALL ROOF MOUNTED EQUIPMENT MUST ADHERE TO CURRENT HURRICANE CODES REGARDING ROOF TIE -N AND WIND RESISTANCE ROOFTOP UNIT No Seale CONDENSING UNITS FLEX CONK. (TYPj ROUTE CONDENSATE LINE TO NEAREST ROOF DRAIN, FULL SIZE ROOF TOP WIT HOUSING OR FAN HOUSING. ROOFING -SEES ARCH. DRAW w.4 7\ 3/8" x 3" •TAPCCN" GALVANIZED CONCRETE ANC44ORS (TYPICAL OF ErsW- 2 PER UNIT 61DE) 3/8' x 2' GALVANIZED CARRIAGE BOLTS WITH 1 -1/1' FENDER WASHERS (TYPICAL OF Er -49 -2 PER BIDE OF UNIT) CURB CsASKETING (CONTINJ008) AIR CONDITIONING UNIT MFG. PREFABRICATED CURB PITCHED TO MATCH ROOF SLOPE 77 .r,.. .. 3/S,' BABE PLATE ATTACHED TO MFR'S w ROOF CURB TYPICAL ROOFTOP EQUIPMENT CURB MOUNTING Vol (a BOLTS a to 12 �/-4, BOLTS to WIDTH OF MEC 4AWAL UNIT (A) BAS INPUT /OUTPUT POINTS LIST TAG POINT NAME AIP AOP DIP DOP NOTES: 1 OUTSIDEM ETURd AIR DAMPERB 48 0008996 X 2 DIRTY FILTER SWITCH X 3 DY -PASS AIR DAMPER 4 CONDENSING UNIT - COMPRESSOR 5 FAN STATUS, SWITCH X 6 SUPPLY FAN START/BTOP X i LEAVING AIR TEMPERATURE X e THERMOSTATIC EXPANSION VALVE X 5 STATIP PRESSURE SENSOR X 1O RETURN AIR TEMPERATURE X 11 ELECTRONIC HOT GAS VALVE I X DDC CONTROLLER 120 VAC POWER SOURCE (BY DIVISION 16) NOTE: L PROVIDE ALL SYSTEM INF ATION AT ONE CENTRAL LOCATION. CONTROLLER TO HAVE LCD OPERATOR'S DISPLAY PROVIDE SCHEDULING 4 EXPANSION CAPABILITY 2. DUCT SMOKE DETECTOR AS REQUIRED BY NATIONAL FIRE PROTECTION ASSOCIATION (AFPA) REGULATIONS AND N ACCORDANCE WITH NATIONAL AND LOCAL ELECTRICAL CODES. GEE MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATION AND GLIANTITIES. PROVIDED 4 WIRED BY DIVISION 16. TO VAV UNITS CONSTANT VOLUME AC UNIT WITH HOT GAS BYPASS CONTROL SEE MECHANICAL PLANE AND 8CHECULE8 FOR QUANTITIES FAN BECT JBULATION AS SPECIFIED PASSES, HROUG.44 PIPE SLEEVE. PROVIDE 0AMCA.A6 INSULATION THROUGH SMOKE VIBRATION 160LATICN ND /OR FIRE FLOOR SLAB PAD ALL AROUND TOP OF CURD UNDER IR U - 24 ...:a. PIPE FLOOR SLAB PENETRATION No Sea Is PROVIDE MIANF. RECD SERVICE CLEARANCES (rt -44 Wbx12 CROSSBEAM WITH #• Gu88ET PLATE WELDED ON SITE FACTORY FABRICATED ROOF CURB rC —COIL SECTION FILTER SECTION MVD BIRDSCREEN MIN. SUPPLY RETURN DUCT DUCT NOTE: ALL ROOF MOUNTED EQUIPMENT MUST ADHERE TO CURRENT HURRICANE CODES REGARDING ROOF TIE -N AND WIND RESISTANCE ROOFTOP UNIT No Seale CONDENSING UNITS FLEX CONK. (TYPj ROUTE CONDENSATE LINE TO NEAREST ROOF DRAIN, FULL SIZE ROOF TOP WIT HOUSING OR FAN HOUSING. ROOFING -SEES ARCH. DRAW w.4 7\ 3/8" x 3" •TAPCCN" GALVANIZED CONCRETE ANC44ORS (TYPICAL OF ErsW- 2 PER UNIT 61DE) 3/8' x 2' GALVANIZED CARRIAGE BOLTS WITH 1 -1/1' FENDER WASHERS (TYPICAL OF Er -49 -2 PER BIDE OF UNIT) CURB CsASKETING (CONTINJ008) AIR CONDITIONING UNIT MFG. PREFABRICATED CURB PITCHED TO MATCH ROOF SLOPE 77 .r,.. .. 3/S,' BABE PLATE ATTACHED TO MFR'S w ROOF CURB TYPICAL ROOFTOP EQUIPMENT CURB MOUNTING Vol (a BOLTS a to 12 �/-4, BOLTS to WIDTH OF MEC 4AWAL UNIT (A) HK CLEARM2 ADM ROOF OJWAM (0) (NOW <24' 14 24" < 36" 18 36" < 48" 24 48" < 60" 30 > 60" 48 TABLE 1510 FBC MULTIPLE CONDENSING UNIT MOUNTING DETAIL N.T.B. WIDTH OF MECHAMAL UNIT (A) MN. CLEARANCE ABOVE ROOF SURFACE (D) 424 14 24 436 t8 36 G 48 24 48,960 31a 260 48 TABLE 1511.1 FBC SINGLE CONDENSING UNIT MOUNTING DETAIL NOTE: ALL ROOF MOUNTED EQUIPMENT SHALL. COMPLY WITH FLORIDA MECHANICAL CODE SECTION 301.13 DUCT SIZE ANGLE 30Nxi2N 1'xl • • 1'X1 " ■ ■ I- "XI- e —mail: peter®diezarchitecture.com exim EXPANSION �IWaLL DOWL�T���p • .. ........... . ......... .y..... ............ r..:.. MOLL IRON RISER SUPPORTS NTS /01" 111. ,kr x �i a 2 �1 SLIP ON NEOPRENE CLAMPS C 2" INSULATION —� BUILT -UP ROOF :... ............................... PIPE diez architecture, inc. 5001 sw 74th court suite 105 Miami, florida 33155 phone: (305) 663 -1970 fax: (305) 663 -2312 e —mail: peter®diezarchitecture.com pedro diez. ra president ar 0008996 ENGINEERING CONSULTANT PRV ENGINEERING, INC. Yedlahw - Electrical - Plumbing - In Protection 64U Nw n cc, rr im* FL 33188 • Pe: 305.&.x.WV - Fx 30b.&%-%M Boadof rmEngineers aili&ml Engin &fib i gm No.: 00009635 MMechenical Engineer. P. Robert `/aidesA PE 31328 Electrical Englneer t l lRwwb Vene PE 32076 ".0ROJF;Q'f No., DROp1 ne Ev kj till' M - } `.r , I • '.y 'vJ:•� •'• 1, `, \ • t oo,�f1111itINw`` 6141 Sunset 6141 SUNSET DRIVE SOUTH MIAMI, FLORIDA KTB- PROJECT No. 03 -115 PIPINCs ACRYLIC CLAD 18 GA. GALV. COVER NAILER 2" INSULATION CANT. STRIP AND COUNTER FLAWING lRSF� CURD INSULATION (REFJ WE PIPING FLOOR STRUCTURAL ROOF PENETRATION DETAIL (RAJ ROOF PIPING PENETRATION No Sca le REVISIONS HVAC DETAILS SCALE: 3/16" ■: l' —O" DATE: NOV -14 -2005 M -1.03 6