Loading...
05-1856-011PLUMBING SYMBOL LEGEND AFF - ABOVE FINISH FLOOR CD - CONDENSATE DRAIN CD - CONDENSATE DRAM REMARKS - DOMESTIC COLD WATER CO - CLEANOUT 3/g" - SANITARY CONT - CONTINUATION LAVATORY - SANITARY VENT CW - DOMESTIC COLD WATER WALL HUNG - STOR1 DN - DOWN 3411 - DOMESTIC HOT WATER DWG - DRAWING --�— - HOSE BIBB EXIST - EXISTING: WALL HUNG - CLEAN OUT PLUG FD - FLOOR DRAIN 3 '6" - OAS HB - HOSE BIBS O CO - FLOOR CLEAN OUT IE - INVERT ELEVATION ANTI -SCALD MIXING VALVE 5RSK BREAK RM. SINK V/2 11 @C - FLOOR DRAM KW - KILOWATT JANITOR SINK 11 /2" LBS - POUNDS 6) - BALL VALVE NIC - NOT IN CONTRACT - BALANCWCs VALVE NTS - NOT TO SCALE NOTES:_ 1. SEE ARCHITECTURAL- DRAWINGS FOR EXACT MOUNTING LOCATION OF ALL WITS. - CHECK VALVE(SWING) PRV - PRESSURE REDUCING VALVE ' - PRESSURE REDUCING VALVE PSI - POUNDS PER SQUARE INCH 4 - SOLENOID OPERATED VALVE FRO - ROOF DRAIN - REDUCED PRESSURE BACKFLOW RPBP - REDUCED PRESSURE BACKFLOW PREVENiER PREVENTER WITH STRAINER SAN - SANITARY - RELIEF OR SAFETY VALVE SD - STORM DRAM i 0 - VALVE ON RISER SF - SQUARE FEET I - CAP ST - STORM - ELBOW, TURNED UP V -VENT VTR - VENT THRU ROOF C - ELBOW, TURNED DOWN - TEE - TEE, TURNED UP - TEE, TURNED DOWN SHEET INDEX P -001 PLUMBING LEGEND, GENERAL NOTES, SHEET INDEX AND SCHEDULES P -101 PLUMBING THIRD FLOOR PLAN P -102 PLUMBING FOURTH FLOOR PLAN P -103 PLUMBING FIFTH FLOOR PLAN P -201 SANITARY t VENT RISER DIAGRAM A P-202 SANITARY a VENT RISER DIAGRAM B P -203 DOMESTIC WATER RISER DIAGRAM NQM: 1. ALL PIPING BETWEEN WATER HEATER AND FAUCET SHALL BE MINIMUM Y. 2. ALL SUPPLY PIPING TO TWH SHALL BE 344 MIN. 3. COORDINATE WITH ARCHITECTURAL DRIM FOR EXACT LOCATION OF TANKLESS WATER HEATER PRIOR TO ROUGH -IN COUNTERTOP USE TWH -1 TO FEED A SINGLE MLV AND TWH -2 FOR 2 OR 3 MLV ON S, WATER HEATER WITH FLOW CONTROL VALVE FAUCET PLUMBING SPECIFICATIONS 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT SHOWN IN THESE DRAWINGS INCLUDING THOSE ITEMS NOT NORMALLY SHOWN BUT NECESSARY FOR A COMPLETE PLUMBING SYSTEM TO PERFORM AS INTENDED. FURNISH ALL LABOR TO INSTALL ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE LOCAL PLUMBING AND BUILDING CODES AS ENFORCED BY THE AUTHORITIES HAVING JURISDICTION. 2. COORDINATE WORK WITH ALL TRADES AND NOTIFY A/E OF RECORD OF ANY POSSIBLE CONFLICTS PRIOR TO COMMENCING WORK, DO NO WORK UNTIL ALL ISSUES ARE RESOLVED. BEGINNING INSTALLATION IMPLIES AN ACCEPTANCE OF JOB CONDITIONS. 3. VERIFY ALL POINTS OF CONNECTION WITH UTILITIES PRIOR TO START INSTALLATION. 4. VERIFY EXACT LOCATION OF ALL EQUIPMENT WITH ARCHITECTURAL DRAWINGS AND COORDINATE WITH EQUIPMENT'S MANUFACTURER SHOP DRAWINGS PRIOR TO ROUGH -IN. DO NOT SCALE PLUMBING DRAWINGS. 5. PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED TO COMPLETE INSTALLATION AS INTENDED. 6. PROVIDE COMPLETE ACCESS t0 ALL SYSTEM. LOCATE GLEAN -OUTS ON WALLS AND OR FLOORS AND PROVIDE ACCESS PANELS TO REACH WATER DISTRIBUTION SYSTEM'S VALVES. 1. PROVIDE FLASHING AND PITCH PANS AS REQUIRED TO MAKE ALL ROOF PENETRATIONS WATER TIGHT. 8. BUILDING DRAINAGE SYSTEM DESIGN BASED ON V8" FT. MINIMUM FALL. S. PROVIDE P MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL ROOM AND METER ROOM FOR GROUND. 10. ALL VALVES UNDERGROUND TO BE INSTALLED IN PRECAST CONCRETE BOXES, BROOKS OR EQUAL. 11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV (ASTM -D- 2662). B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C. C HOT AND COOL WATER LINES SHALL BE COPPER (ASTM -5-88) TYPE "L" ABOVE GROUND t TYPE "K" UNDERGROUND. D PROVIDE DIELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO DIFFERENT MATERIALS SHUTOFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SUPPLY. E INSULATE ALL HOT WATER LINES WITH }2" FIBERSLASS WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KOHLER, CRANE OR EQUAL. G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR EQUAL, FLOOR DRAINS SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLAS51LINED, 5 YEARS GUARANTEED A.O., SMITH OR EQUAL. I VALVES - 125 PSI N15CO SCOTT OR EQUAL. J HOSE 5I555 CHICAGO 952, OR EQUAL. K ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED ESCUTCHEON'S AS REQUIRED. 12. PERFORM THE FOLLOWING TESTS: A WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 PSIG. FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRIEE SYSTEM BUT NOT LESS THAN ONE HOUR B DRAINAGE PIPING INSTALLATION OF ANY DRAINS, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION 18 MADE AND WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS PRIOR TO PLACING SYSTEM IN OPERATION. 13. STERILIZE ALL WATER LINES WITH MIXTURE OF CHLORINATED LIME t0 EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE), RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPLACE AND REPAIR FREE OF CHARGE ANY AND ALL EQUIPMENT AND INSTALLATION WHICH BECOMES DEFECTIVES DURING THAT PERIOD. PERFORATED VENT CAP TYPICAL MEDICAL SINK (MLV). Z C.O. PLUG A/C UNIT lV„ — 3/4110 DRAIN PAN SLOPE Y8° UNION CW SUPPLY TO FIXTURE 3" 3�4n0 SUPPLY STOP CHROME PLATED WAL ESCUTCHEON CONDENSATE TRAP DETAIL SUPPLY STOP FLOW CONTROL NOT TO SCALE UNION TANKLESS ELECTRIC WATER HEATER NTS I PLUMBING FIXTURE CONECTION SCHEDULE MARKS DESCRIPTION WASTE C.W. H.W. REMARKS WC WATER CLOSET 3" 3/g" - WALL MOUNTED, FLUSH TANK LAV LAVATORY 11/4" '�" - WALL HUNG 1-1CU1C WATER CLOSET HANDICAPED USE 3" 3411 _ WALL MOUNTED, FLUSH TANK HC LAV LAVATORY HANDICAPED USE I1/4" 3 /8" _ WALL HUNG MLV MEDICAL LAVATORY 11/411 3 '6" 3/8" COUNTERTOP SH SHOWER 2" J6" )5" ANTI -SCALD MIXING VALVE 5RSK BREAK RM. SINK V/2 11 VI V" COUNTERTOP JSK JANITOR SINK 11 /2" VI VI SEE ARCH DWGS. TANKLESS WATER HEATER SCHEDULE MARK * P.D.I. SIZE CONN. SIZE INPUT TEMP WATER HA -2 5 (12 -32 F.U.) 3/4" HA -3 C (33400 F.U.) UNIT NO MODEL MAX/MIN RISE FLOW VOLT AMPS CIRC. EFF WEIGHT TWH -1 EEMAXSP4208 56' F 05 GPM 208 -1 19.1 EA. 1 999e 30 LBS TWH -2 EEMAX SPW0& 51' F 1 GPM 208 -1 40 EA. 1 99go 30 LBS TWH -3 � WATER HEA 220 60• F 3.0 GPM 240 -1 93.6 EA. I 985 90 120 L58 NOTES:_ 1. SEE ARCHITECTURAL- DRAWINGS FOR EXACT MOUNTING LOCATION OF ALL WITS. 2. PROVIDE AX' C414 WATER LINE INSTALL A FLOW STOP ON CW SUPPLY LINE. 3. PROVIDE AN EWH -I WITH A 05 GPM AERATOR ON ALL EXAM ROOM, LABORATORY SINKS AND LAVATORIES. 4. PROVIDE AN EWH -2 WITH A 1.0 GPM AERATOR ON ALL BREAK ROOM AND KITCHEN SINKS. 5. PROVIDE AN EWH -3 FOR JANITOR SINKS AND AS INDICATED ON THE DRAWINGS. THE HANDLE OF THE FLUSH LEVER SHALL FACE THE WIDE SIDE OF THE STALL(NO EXCEPTIONSU WATER CLOSET ACCESSIBLE NTS WATER HAMMER ARRESTER SCHEDULE MARK * P.D.I. SIZE CONN. SIZE HA -1 A (1 -II RU-) 1/2" HA -2 5 (12 -32 F.U.) 3/4" HA -3 C (33400 F.U.) I" • PLUMBING AND DRAINAGE INSTITUTE STANDARD WH -201 diez architecture, inc. 5001 sw 74th court suite 105 miami, florida 33155 phone: (305) 663 -1970 fax:- (305) 663 -2312 e —mail: peter®diezarchitecture.com pedro diez, ra president or 0008996 ENGINEERING CONSULTANT PRV ENGINEERING, INC. Mecha6hl - Owtricd - Plumbing y-,Fxe Protection east NW 77 CL, Mmn,. FL,'016e - Pn 3os 859 8827. FS' I 8:8.5956 Board of Professional ineem AulhoAzation Mechanical Eng der`` .P. Robert Aitlpsr�PE P1325 Electrical E r :' �Rigdberto nprediPE 76 PROJWp:.$ �_'DQSbg : ri b- o ff CO PE #: 31326 'fi 6141 Sunset 6141 SUNSET DRIVE SOUTH MIAMI. FLORIDA PROJECT No. 03 -115 REVISIONS i SCHEDULES DETAILS AND LEGEND SCALE: AS NOTED DATE: Nov. 14. 2005 ■ 3