Loading...
9THE CITY OF PLEASANT LIVING To: FROM: Via: DATE: SUBJECT: BACKGROUND: VENDORS & AMOUNT: EXPENSE: FUND& ACCOUNT: AnACHMENTS: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Quentin Pough, Director of Parks and Recreation I'J December 15, 2015 Agenda Item NO.:~ A Resolution authorizing the City Manager to enter into a contract with Davco Electrical Contractors Corp. to repair athletic/sports field lighting at two (2) City parks. Park staff conducted an assessment at Palmer Park and Murray Park, and concluded that approximately fifty-five (55) lights need to be replaced. Proper lighting will help ensure a safer, quality playing environment for the public. Competitive proposals were sought from three (3) different sources of supply; Davco Electrical Contractors Corp. was the lowest and most responsive vendor. Please find below a breakdown of all proposals: VENDORS AMOUNT DAVCO ELECTRICAL CONTRACTORS CORP. $16,588 -/ HORSEPOWER ELECTRIC, INC. $25,250 CANSECO ELECTRICAL CONTRACTORS, INC. $31,000 Amount not to exceed $18,246.80. To account for any unknown factors that may arise, a $1,658.80 or 10% contingency over the proposal of $16,588 is requested. The vendor will receive a purchase order in the amount of $16,588 The expenditure shall be charged to the Parks Landscaping Division - Contractual Services account 001-1750-519-3450, which has a balance of $62,791 before this request was made. Resolution Vendor Proposals 1 RESOLUTION NO.: ________ _ 2 3 A Resolution authorizing the City Manager to enter into a contract with Davco Electrical 4 Contractors Corp. to repair athletic/sports field lighting at two (2) City parks. 5 6 WHEREAS, park staff conducted an assessment at Palmer Park and Murray Park, and 7 concluded that approximately fifty-five (55) lights need to be replaced; and 8 9 WHEREAS, proper lighting will help ensure a safer, quality playing environment for the 10 public; and 11 12 WHEREAS, competitive proposals were sought from three (3) different sources of 13 supply; Davco Electrical Contractors Corp. was the lowest and most responsive vendor. 14 15 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 16 CITY OF SOUTH MIAMI, FLORIDA THAT: 17 18 Section 1. The City Manager is authorized to expend an amount not to exceed $16,588 19 to Davco Electrical Contractors Corp. To account for any unknown factors that may arise, a 20 $1,658.80 or 10% contingency over the proposal of $16,588 is requested. The total expenditure 21 shall be charged to Parks Landscaping Division -Contractual Services account 001-1750-519- 22 3450, which has a balance of $62,791.01 before this request was made. 23 24 Section 2. Severability. If any section clause, sentence, or phrase of this resolution is 25 for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding 26 shall not affect the validity of the remaining portions of this resolution. 27 Section 3. Effective Date. This resolution shall become effective immediately upon 28 adoption by vote of the City Commission. 29 30 31 32 33 34 35 36 37 38 39 40 41 42 PASSED AND ENACTED this __ day of ____ -', 2015. ATIEST: CITY CLERK READ AND APPROVED AS TO FORM: LANGUAGE, LEGALITY AND EXECUTION THEREOF CITY ATIORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard: Vice Mayor Harris: Commissioner Edmond: Commissioner Liebman: Commissioner Welsh: November 12,2015 CONTRACTORS CORP. Attention: City of South Miami Parks & Recreation Gibson-Bethel Community Center 5800 Southwest 66 Street South Miami, FL 33143 Elisha Atkins-McGuire Administrative Assistant I Reference: Palmer Park and Murray Park Light Repairs Davco Electrical Contractors Corp. is pleased to provide this proposal to provide supervision, labor, equipment and materials to repair lights at the above reference parks as per e-mail request form Elisha Atkins-McGuire dated November 12, 2015 and as per the scope provided below for the total sum of: SIXTEEN THOUSAND FIVE HUNDRED EIGHTY-EIGHT DOLLARS $16,588.00 Scope of Work: 1. Provide and install 55----1000 watt Metal Halide Lamps $209.69 each Total $11,533.00 2. Provide and install 10----1000 watts Metal Halide Ballast $346.60 each Total $ 3,466.00 3. Provide and install 25-----Fuse with Fuse Holder $ 63.56 each Total $ 1,589.00 4. We will be billing you only for the parts that we replace based on the above cost. If there are any additional parts required this will be discussed prior to the commencement of that work. Notes & Conditions 1. PRICE IS BASED ON A NORMAL 40-HR WORK WEEK. 2. Permit and permit fee are excluded 3. Any additional work or material beyond this scope will be additional. Davco reserves the right to withdraw this proposal if not accepted and received in this office within (30) days. This proposal is also conditioned upon the premises being in the physical state that they are in as of this proposal date. In the event there is a change to the physical condition of the premises requiring additional work, in the sole discretion ofDavco Electrical Contractors Corp., additional costs may be incurred. Rect!ul~ h#:-;<,,''--_ '4;/ 4ff{:4~ e Goater, Sr. ;;. Sr. Estimator Davco Electrical Contractors Corp. Accepted: ___________________ D.ate: ____ _ Name & Title: ----------::---..,-==cc-.,-,,-:--~------­ Commercial. EC673 .lndilstriai Boynton Beach: (561) 732-3434 • Boca Raton: (561) 338-6847 • Fax: (561) 732-3414 • www.davcoelectric.com 4885 Park Ridge Boulevard. Boynton Beach, Flodda 33426-8316 Horsepower Electric Inc. 8105 West 20th Avenue Hialeah FL 33014 305-819-4060 www.horsepowerelectric.com NAME 1 ADDRESS City of South Miami Parks & Recreation 58008W 66 8T South Miami, FL 33143 DESCRIPTION Job Description: Sport Field Lighting Replacements Job Location: Palmer Park and Munay Park 1 OOOW MH Lamp Replacement illcluding re-aiming 1 OOOW MH Ballast Fuse Kit IPlI"oposa~ DATE ESTIMATE NO. 11123/2015 5449 QTY PRICE TOTAL 55 300.00 16,500.00 10 525.00 5,250.00 25 140.00 3,500.00 TOTAL $25,250.00 ACCEPTANCE OF PROPOSAL -The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized 10 do work as specified Payment will be made as outlined above. DATE OF ACCEPTANCE SIGNATURE ---_._-----------. '-'-.. ClEC Date: To: Attention: Project: Address: c_~ Electrical Contractors, Inc 7175 SW 43" ST. Miami, F133155 Tel (305) 265-9909 Fax (305) 265-9945 www.cansecoelectric.com Proposal November 18, 2015 City of South Miami Elisha Atkins-McGuire Athletic Field Lighting -Quote/Estimate to repair field lights 6130 Sunset Drive. South Miami, FL 33143 Canseco Electrical Contractors Inc is pleased to submit this proposal for the electrical work of the above project. OUf Proposal is based on the brief walkthrough performed on 03/26114. Proposal is quoted without the benefit of full specification, or plans. Park Locations: Palmer Park 6100 SW 67 Avenue South Miami, FL 33143 Includes: o 1000WattMH lamp o 1000WattMH Ballast Kit o Fuse Kit Excludes: Murray Park 5800 SW 66 Street South Miami, FL 33143 QTY 55 10 25 • Electrical permit fee, Bond fee, Prevailing & Davis bacon wages. • FPL Service; Any fee for local utility. • Light fixture housing, ballast housing/case, repair to existing electrical connections. o Deteriorating light fixture • Replace, repair any Electrical panels, disconnect, starter, lighting control, or other equipment. • Any survey / Underground locator, by others. • City Inspector or authority havingjurisdiction additional request, new/existing code violation Initial: -Print name: ______ • Date: __ I QuotelEstimate to repair field lights IPage I of2 Date: November 18,2015 Project: Athletic Field Lighting -Quote/Estimate to repair field lights Clarifications: o All work to be completed during Monday to Friday, 7:00 am to 4:00 pm. Overtime hour shall be considered as an extra charge; but it must be pre-approved in writing by the Park representative before the City will be liable for payment o Parts and material quoted are standard universal kit, not a specified part number. If existing part is specific, then part must be re-quoted. o Equipment Lift: o to relocate boom to another location there will be an extra charge for Pick-up and delivery, plus tax. o If equipment rental requires extra time because unforeseen condition or extra work, then the city will be responsible for additional rental time cost. o Equipment Lift can only be operated by Canseco Electrical Contractors, Inc., no city staff will be allowed to operate boom lift. o Light Fixture: (existing to remain.) o Any fixture light that shows signs of deterioration, and unsafe condition will be brought to the city staff attention. However, city will determine how to proceed and advice CEC. o Inspector request that affect this proposal will be an extra charge unless the request concerns code compliance of the actual work being performed and is necessary for the work to be in compliance with the code. However, any request to bring the current electrical system up to code will be an extra charge. • Any AdditionallExtralUnforeseen work which are not reflected in the plans or mentioned in this proposal as "includes", will be considered an additional cost to this proposal. Before additional work begins, "CEC" must receive signed and written authorization from "Owner/GC" to do such additional work. o Indemnification: You agree to defend, indemnifY and hold harmless "Canseco Electrical Contractors, Inc." from and against any and all claims, damages, cost and expenses, including attorney's fees, arising from or related to this proposal's scope of work. • Due to Market conditions, Items set forth on this quotation are subject to Price Increases through time. This Bid is valid for the next 15 days. BID AMOUNT: I Unit: QTY: Total: 1000Watt MH lamp $299.00 55 $16,445.00 1000Watt MH Ballast Kit $673.00 \0 $6,730.00 Fuse Kit $313.00 25 $7,825.00 ACCEPTANCE OF PROPOSAL & AGREEMENT This above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Standard Payment Method: 100% Lump Sum. (Authorized Signature) (print name) (Titie/Position) (Date) We appreciate the opportunity to bid and we wish you the best of luck. Thank you. Ramon] Canseco Jr. CANSECO ELECTRICAL CONTRACTORs, Inc. Initial: ___ ~ Print name: ______ ~ Date: __ I QuotelEstimate to repair field lights IPage 2 of2