11-1026-004DEMOLITION PLAN
SCALE:
DEMOLITION NOTES
1- CONTRACTOR IS RESPONSABLE FOR VERIFYING
ALL EXISTING CONDITION PRIOR TO COMMENCING WORK
2 -G.C. IS RESPONSABLE FOR THE STORAGE AND DISPOSAL OF DEBRIS
CAUSED BY ANY DEMOLITION REQUIRED BY THIS JOB
3- G.C. IS RESPONSABLE FOR PROVIDING BARRICADES TO STOP
ANY PEDESTRIAN TRAFFIC AT THE AREA FOR CONSTRUCTION
4- IN THE EVENT THAT ANY DISCREPANCES ARE FOUND DURING THE DEMOLITION
STAGE, THE G.C. IS RESPONSABLE FOR NOTIFYING THE ARCHITECT PRIOR TO
PROCEEDING WITH THE WORK
5- ALL ABANDONED PLUMBING PIPES BELOW SLAB AND INSIDE WALLS
SHALL BE CAPPED OFF
6- ALL ELECTRICAL OUTLETS, FIXTURES AND EQUIPMENT THAT IS REMOVED
SHALL HAVE ALL WIRES PULL BACK ALL THE WAY TO THE POINT OF ORIGING
PROVIDE 3 -1/2" BATT INSULATION WITHING
7- G.C. IS RESPONSABLE FOR NOTIFYING THE ARCHITECT OF ANY GAS LINES,OR
FUEL STORAGE TANKS FOUND IN THE PATH OF CONSTRUCTION PRIOR TO
REMOVAL
8- G.C. SHALL KEEP THE JOB SITE CLEAN AND CLEAR OF ANY DEBRIS THAT MAY
OCCUR DUE TO THE SCOPE OF WORK.
9- G.C. IS RESPONSABLE FOR PATCHING UP ANY AREA DAMAGED DUE TO
THE DEMOLITION OR CONSTRUCTION OF THIS PROJECT.
10- G.C. SHALL DISCONNECT ALL EXISTING UTILITIES PRIOR TO COMENCING WORK.
DEMOLITION WALL LEGEND
EXISTING BUILDING ELEMENT TO REMAING
® EXISTING BUILDING ELEMENT TO BE REMOVED
ry r'
rn �
C.0
z po (D O
_ I o r,,
Lu
U? 0 CL 0
raj �E I
rn Q =
n-
N
W
n
0
W
0 `°
CD
n
_.
REVISIONI
REVISION2
REVISION3
REVISION4
SHEET
DEMO
0
LL
M
Lil
z
Lil
Q
W�
CO
0
U)
Q
0 `°
CD
n
_.
REVISIONI
REVISION2
REVISION3
REVISION4
SHEET
DEMO