11-1026-004DEMOLITION PLAN SCALE: DEMOLITION NOTES 1- CONTRACTOR IS RESPONSABLE FOR VERIFYING ALL EXISTING CONDITION PRIOR TO COMMENCING WORK 2 -G.C. IS RESPONSABLE FOR THE STORAGE AND DISPOSAL OF DEBRIS CAUSED BY ANY DEMOLITION REQUIRED BY THIS JOB 3- G.C. IS RESPONSABLE FOR PROVIDING BARRICADES TO STOP ANY PEDESTRIAN TRAFFIC AT THE AREA FOR CONSTRUCTION 4- IN THE EVENT THAT ANY DISCREPANCES ARE FOUND DURING THE DEMOLITION STAGE, THE G.C. IS RESPONSABLE FOR NOTIFYING THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK 5- ALL ABANDONED PLUMBING PIPES BELOW SLAB AND INSIDE WALLS SHALL BE CAPPED OFF 6- ALL ELECTRICAL OUTLETS, FIXTURES AND EQUIPMENT THAT IS REMOVED SHALL HAVE ALL WIRES PULL BACK ALL THE WAY TO THE POINT OF ORIGING PROVIDE 3 -1/2" BATT INSULATION WITHING 7- G.C. IS RESPONSABLE FOR NOTIFYING THE ARCHITECT OF ANY GAS LINES,OR FUEL STORAGE TANKS FOUND IN THE PATH OF CONSTRUCTION PRIOR TO REMOVAL 8- G.C. SHALL KEEP THE JOB SITE CLEAN AND CLEAR OF ANY DEBRIS THAT MAY OCCUR DUE TO THE SCOPE OF WORK. 9- G.C. IS RESPONSABLE FOR PATCHING UP ANY AREA DAMAGED DUE TO THE DEMOLITION OR CONSTRUCTION OF THIS PROJECT. 10- G.C. SHALL DISCONNECT ALL EXISTING UTILITIES PRIOR TO COMENCING WORK. DEMOLITION WALL LEGEND EXISTING BUILDING ELEMENT TO REMAING ® EXISTING BUILDING ELEMENT TO BE REMOVED ry r' rn � C.0 z po (D O _ I o r,, Lu U? 0 CL 0 raj �E I rn Q = n- N W n 0 W 0 `° CD n _. REVISIONI REVISION2 REVISION3 REVISION4 SHEET DEMO 0 LL M Lil z Lil Q W� CO 0 U) Q 0 `° CD n _. REVISIONI REVISION2 REVISION3 REVISION4 SHEET DEMO