13-1358R-015GENERAL PLUMBING NOTES
SYMBOL LEGEND
SYMBOL
DESCRIPTION
1t PLUMBING CONTRACTOR SHALL PRESSURE TEST ALL PIPING AS
Z ALL WORK SHALL CONFORM WITH FLORIDA BUILDING CODE 2010
A INSTALL MATERIALS AND EQUIPMENT IN A NEAT AND FIRST
REQUIRED BY CODE TEST SHALL BE WITNESSED AND APPROVED
EDITION (FB.Ci 2010), FEDERAL ORDINANCES GOVERNING THE
CLASS WORKMANLIKE MANNER THE OWNER RESERVES THE
BY PROPER AUTHORITIES.
INSTALLATION OF THE PLUMBING SYSTEM IF WORK AS LAID
RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ITEMS WHICH,
EXISTING SANITARY DRAIN
OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS
IN HIS OPINION, DO NOT PRESENT A NEAT AND WORKMANLIKE
12 THE PLUMBING CONTRACTOR SHALL WARRANT ALL
WITH LOCAL ORDINANCES, BUILDING CODES AND REGULATIONS,
APPEARANCE REMOVAL AND REPLACEMENT IS TO BE DONE
WORKMANSHIP AND MATERIALS FOR ONE YEAR FROM THE DATE
THE CONTRACTOR SHALL REPORT IN WRITING TO THE
IMMEDIATELY WHEN DIRECTED BY THE OWNER IN WRITING, AT
OF FINAL WORK ACCEPTANCE BY OWNER ANY BREAKDOWN
ARCHITECT/ENGINEER BEFORE SUBMITTING A BID. THE
THE SOLE EXPENSE OF CONTRACTOR
OCCURRING IN FIRST YEAR SHALL BE REPAIRED AT NO EXPENSE
ARCHITECT/ENGINEER WILL THEN ISSUE INSTRUCTIONS AS
6 START OF WORK BY CONTRACTOR SHALL BE CONSIDERED AS
TO THE OWNER
HOW TO PROCEED.
ACCEPTANCE BY HIM OF ALL CLAIMS OR QUESTIONS AS TO
13. PROVIDE BATHROOM FIXTURES AS SPECIFIED OR AS SELECTED BY
2 THE DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT
SUITABILITY OF THE WORK OF OTHER TRADES OR OTHER
OWNER AND TO COMPLY W/FB.C2001 SPECIALLY CHAPTER 11
NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL OF THE
CONTRACTORS TO RECEIVE HIS WORK. THIS CONTRACTOR
COLD WATER
MINOR ITEMS UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE
SHALL REMOVE AND REPLACE AT HIS EXPENSE ALL PLUMBING
A PROVIDE SHUTOFF VALVE FOR EACH FIXTURE
STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS SHALL
WORK WHICH MAY HAVE TO BE REMOVED BECAUSE OF
15 WHEREVER NOT SIMILAR METALS ARE TO BE JOINED, A DIELECTRIC
GOVERN THE EXACT LOCATIONS CONTRACTOR SHALL FOLLOW
INTERFERENCE WITH OTHER TRADES
FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
DRAWINGS IN LAYING OUT WORK CHECK DRAWINGS OF ALL
1/2-
--
TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED
& THIS CONTRACTOR SHALL OBTAIN AND PAY ALL INSURANCE
16; PLUMBING CONTRACTOR SHALL.. PROVIDE AIR CONDITIONING
AND MAINTAIN MAXIMUM HEAD ROOM, AND SPACE CONDITIONS
FEES, PERMITS, ASSOCIATION DUES, ROYALTIES AND TAXES OF
CONDENSATE DRAIN AND TRAP. SEE AIR CONDITIONING PLANS
AT ALL POINTS. WHERE HEAD ROOM, OR SPACE CONDITIONS
WHATEVER NATURE SHALL APPLY TO THIS WORK HE SHALL ALSO
FOR LOCATION OF UNITS AND DRAINS
APPEAR INADEQUATE ARCHITECT/ ENGINEER SHALL BE
PAID ALL THE INSPECTION FEES AS MAY REQUIRED BY LAW OR
3"
NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS
ORDINANCE AND SHALL KEEP THE OWNER HARMLESS FROM ANY
IT ALL SANITARY SHALL BE DIRECTIONAL TYPE
CONTRACTOR SHALL, WITHOUT EXTRA CHARGE MAKE FIELD
DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF LAWS,
1a MATERIALS
MODIFICATION IN LAYOUT AS NEEDED TO PREVENT CONFLICT
RULES OR ORDINANCES
A COLD WATER PIPING DOWNSTREAM OF WATER METER SHALL BE
WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION
1
PVCOPVC BELOW GROUND AND ABOVE GROUND
OF THE WORK,
7. PROVIDE MEANS "FURNISH AND INSTALLt
13. COLD WATER PIPES INSIDE OF SLAB SHALL BE PVC -CPVC
a EXAMINE ALL DRAWINGS CAREFULLY PF40R TO SUBMITTING A BID.
a DO A COMPLETE JOB, EVERYTHING CONNECTED, READY FOR USE
INSTALL INSIDE POLYETHYLENE CONDUIT. NO JOINTS PERMITTED INSIDE SLAB.
CONTRACTOR WILL BE REQUIRED TO FURNISH, INSTALL AND /OR
SHOP DRAWINGS CONTRACTOR SHALL FURNISH THE ENGINEER
C. SANITARY WASTE AND VENT 4% AND SMALLER SHALL BE P.VC. SCHEDULE 40
CONNECT WITH APPROPRIATE SERVICES ALL PLUMBING ITEMS
WITH SHOP DRAWINGS OF EQUIPMENT PRIOR TO PURCHASE
S STORM LINES INSIDE BUILDING SHALL BE PV.C. SCHEDULE 40
SHOWN ON ANY OF THE ARCHITECTURAL, AIR CONDlT10NING,
FOR APPROVAL
E IN COASTAL AREAS ALL SANITARY AND STORM PIPING OUTSIDE OF BUILDING
ELECTRICAL AND SPRINKLER DRAWINGS WITHOUT ADDITIONAL
1/2"
SHALL BE SCHEDULE 40, PVC
EXPENSE TO THE OWNER IF DISCREPANCIES. CONFLICTS,
10. AT COMPLETION OF JOB THE PLUMBING CONTRACTOR SHALL
F CONDENSATE DRAIN PIPE SHALL BE SCHEDULE 40, PVC PIPE AND FITTINGS.
INTERFERENCE OR OMISSIONS OCCUR BETWEEN DRAWINGS,
GIVE THE OWNER AN AS -BUILT SET OF REPRODUCIBLE SEPIAS
1/2"
NOTIFY IN WRITING THE ARCHITECT/ ENGINEER IN AMPLE TIME
SHOWING THE EXACT LOCA71ON OF ALL INSTALLATIONSS,
O WATER HEATER RELIEF AND DRAIN LINE SHALL. BE TYPE 9..' CU, MIN. 3/4' DIA
PLUMBING
SYMBOL LEGEND
SYMBOL
DESCRIPTION
COLD
NEW SANITARY WASTE LINE
— — — — — — — —
SANITARY VENT LINE
- -
NEW COLD WATER LINE
- - - -
NEW HOT WATER LINE
— — — ® — —
EXISTING SANITARY DRAIN
—
EXISTING WATER LINE
CID
NEW GREASE DRAIN
013
CONDENSATE DRAIN LINE
"
*
1/2-
GATE VALVE
G --) 00
CLEANOUT
44h FID
FLOOR DRAIN
9
PIPE DOWN
3/4- /
"
POINT OF CONNECTION TO DOSTNG
VTR
VENT THRU ROOF
EWA
ELECTRIC WATER HEATER
FFID
FLOOR DRAIN
V TR
COLD WATER
IN
HOT WATER
F.U.
FIXTURE UNITS
ARRESTOR : HAMMER
i - HAMMER ARRESTOR O-W SHALL BE "AM
APPROVED EQUAL I
E. HA SHALL BE INSTALLED WHERE
QUICK-CLOSING VALVES ARE Er
1 • -• �r
• r WITHIN AN EFFECTIVE 11
RANGE OF QUICK-CLOSING
IIIIIIIIIIIIIIIIIIIIIIIII
�r • •
III
�i FOR FIRE RATED PENIETRATION REFER TO ARCHffECTURAL PLANS, I
_
PARTITION NOTE.
PLUMBING CONTRACTOR SHALL COORDINATE WITH THE
PARTITION CONTRACTOR TO INSTALL 6' WALL WHEN 3' OR 4'
PLUMBING STACK IS INSTALLED.
RESTROOM FIXTURE CONNECTION SCHEDULE
ITEM
ASTE & SOIL
(AS PER
TABLE 70RI
WATER (AS PER TABLE 604.5)
COLD
HOT
WATER CLOSET'
3'
V2"
- -
LAVATORY
1 -1/4"
V2'
- -
FLOOR DRAINS
3'
--
- -
ICE 0 MATIC ICE0500HA
"
1/2- TO F.S.
"
*
1/2-
__
NOTE: ALL TRAPS SHALL BE CONSISTENT W/ FIXTURE OUTLET SIZE
NOTE: ALL FIXTURE SHALL COMPLY W/ FBC. TABLE 604Ai
• • NOTES
i - ALL SANITARY PIPE 2 M OR SMALLER %ALL RJN 0 VV SLOPE
PER r •r:. SLOPE PER LFE
I - ALL PIPES TO r SC - r I( r °-O •,
SPLICE • v .•
%IALL BE r ■ S • ' •:' SEPARATION
enuinmenk wnEer /snniknru ennnerkinn schedule
■ v
ITEM
QTY.
EQUIPMENT CATEGORY
MODEL NO.
WASTE
COLD WATER
HOT WATER
1
1
LAMARZOCCO GB -5
GB -5 3 GROUP
__
" *
1 2
/
__
7
1
ICE MACHINE
ICE 0 MATIC ICE0500HA
"
1/2- TO F.S.
"
*
1/2-
__
19
1
ECOLAB DISHWASHER
ECOLAB APEXTSC SINGLE
2 "
--
3/4- /
"
23
1
BREWER
BUNN MODEL DUAL TF DBC
--
"
1/2 *
--
27
1
HOT WATER DISPENSER
BUNN MODEL H5E /H5X
__
1/2" *
__
31
1
HAND SINK
KROWNE METAL HS -9
1 -1 /4"
1/2-
--
32
1
MOP SINK
ZURN 21996 -24
3"
3/4"
3/4-
33
1
3 COMPARTMENT SINK
JOHN BOOS 3816204 -2D18
3"
--
--
34
1
SINK FAUCET
--
3/4"
3/4"
35
1
BARISTA SINK
EAGLE SR22 -22- 13.5 -1
1 -1/2"
1/2"
1/2"
54
1
PITCHER RINSER
EXPRESSO PART S STEAMING
PITCHER RINSER 6x6 x2
1_1/2"
1/2"
1/2-
55
1
SODA GUN
--
1/2"
--
58
1
WATER FILTER
3M EXPRESSO ESP
--
1/2"
--
NOTES :
1. EQUIPMENT LAYOUT & SCHEDULE SHOWN IS PER KITCHEN CONSULTANT . .............0. REFER TO EQUIPMENT SHOP
DRAWINGS PREPARED BY .. ..........................." SHOP DRAWINGS FOR DETAILS.
2. WATER SUPPLY FROM ADJACENT WATER FILTER
3. REFER TO EQUIPMENT SHOP DRAWINGS FOR NOTES AND DETAILS.
�////
F/'/"��/
CONNECT TO EXISTING
STUB UP 4U SANITARY LINE,
VERIFY IN FIELD
1
4
1
/
11 I
" __7 Y WOMEN'S
RESTROOM
MEN'S '
!ESTROQ -
i /��_'
= - =- -- ° _" =- _
;\
,�- _
c 3 f ::
tE/ - T
:E__
,.
Ii t, _'--_ /`�
:B ;i;
� t__ H J '.� FD'
;�
CW
I
I
\ 61
., IL
t
�l
I
Y gi
:ta
f
� - I � �.
PIZZA
8 PREP ARE/
/—
.' -
,1 I 0
f__
s
.� 6 r . ,.- ,- -.. -.q - - f -_ -�. ,
,: f S - t 4 i i E z
.,
r:'; : p 2 -�-- -t s
-- -- _________ - -- 1 6 ; i s
: >.::
w;'. >;
#....
,.
:::
T.
r::
, %..
...
! i 4 - -W' - I \ ( �/
:$
' I{.
t . .., /':
i ' i` -`r w _ ` g
; ---- -- - -- - - - -- -- -- -- -- -,,. _. - ":,_,...._.. w:°.°__:e. ,�
r/ _
�_
_ M -
>>
- $ €k::.
:
:`
u�
.;;;
r- E
$ � __
Li..ri -.
I (: s ,
� - /� ,
' I 0 is
` + s
1. / f °'
j/:: ; d
. f - Z € fi PREP �-t' I I I'll
:. ". I I r' .; AREA ;s7;
- . Ii ; ! 4___ f E ,
rr I F ml.-_� �-: 1 Cyy - -_ a ;: -� IOC---- -
#: i : � , I I rte/
,r ,,,,� -: _ I ytr@ :::I ,
r'' -
>;:; >: }:
: g
_
S
/ : f` I F.A I s s
3°
I fi
g
fi;
1
:.
z
e^
3
:.:...... .
.......................
I' 1f ,
"�'s
I :.
tMSyj ` 3 � s
7, w f
�a
e R
€::::,;
r` $' >:,
. ; ',
„` ELECTRICAL :<
! ° . ROOM e'`
r "t^
$.,
I ifz
:' I I ! ;: i ,t CE I l i E s
, °,
;: ;; ti -. t: i I I
, .__ __ —._ -__ —;_ -- _
___ __ It
, FI I a; '
$ •
_ ._.
IF,
3 E fi li
;: GI,
$;i ,�, r# ;4> SINK
I }.V 1a d f I
: r
/ • - - -- / / ( `�
f
f�
�.
`. j.:
3
I
/ <:.
B
•. r 11 a
.... �1
..:..
r ,
r ,
.
r r 1.: ,p i
r `'} , r :E ! 3/4' CW 6ACK OP I is 'tier ;
;
'� KITCHEN I :fir-
::
:I
:; 1 r
g
/ ` -I _ _ P.C.S.
.
µ •.
It
TRAM R M'
FD
r
t
i f I, +f
$ -; s- - ` p ,; U TER ; ,
lf+.'T. `E: i!/ /`� J .r° ;, I. $ f.- 'y.••a I -_., 3, 4 4'i p f• g /ff /, j. /., `r Ir`r
/ r' g i €... :.'. :: I °',Gf$ !� 2�• S , Y / ,,. ,�,feJr //f /'
f f I €. is �._ t �, ♦ F s
f F: f 1 f i f: S -'..� �� I A..4' f C °•• //
i11
r
. r i : w/ :'� p� RF 1. t ,
r.L<L::
` f - fzI
.....
:::::::
:: -:: ° �-
.. : r •
i S
I_..
l Q
:;,ti- ----:-:� G-
- s
"
i
E— —
;f{
• a ,•' - it;iriiii "+iii : i;:iiiit
:$# y,
..:
' S: :i:::.E ..,:... C f K IIY ::
5 ;: {1
:� $
fi
I
:
,__.� _ r�
EWH- 1..:::.:. ............. ,
J .: / }
•/ k, : i,r ,f I o o _ : fi O
_ „Y:,
_- , I
{ ::::::: ; WALK -IN j I. AHU -2 COOLER ' { a`
e� f .. '.'.,',�. Y
.S•
t
I `ti f":: �:::::::: i : %::':ti'.':':: : :;T:i::::5:i::: is i:::::::::.: q //���
:I ><
fi
/ {
'' , 6
g
? o P ; 8
- = 4 �=—
Im/ I- fi O s — Z p
: 11 0 r I:;:`,'
RRR
1,,...':::.
fi
I
.
Vi ' fi r' '' t :':`' itiit3tisi I.'�, 8 I :✓ S
r.. •.
-.
,r', /.r '°a f d t:E::EEE:i �'< : ;•py`tk^t^s^Tt*::FF `• , :; ; ^ g
f' t' { . g :5 ii-." iii r. •••'• •.i ;;� '44;f' #i# E } v/
q tE.,...... : i' :, �a - Z
d
I ....
s
W
F i °_._ {
�{
fi
S
i $
R
Fe LL
,
_°--
-
__ 1tI I , 11 / ;::;::`
i °. _
._.._._._ ___
: • - - - - -- -,..., -
s ,- I
, :' !
S
S
. r ''.� i : Imo:`
f $':::4:
A
1- ---- -- _ -cam-_
/ :.. :::. : ,:: STORAGE i I `
::
AF r .'F__. :.;.. 5':Si• + iS} j f «.f t • '°
.
..w::
.
I $:
v ; e . } fi I __- - g _ _ -.._..._._-°- ,.-- _ ... .. ....... .. .... ....___
::
... /j' €..... ? / cry
EXISTING 1250 GAL GREASE TRAP. TO -° --'--'-- -° ___._.__ -__
f XXI.Al li' #
r < ¢ : =- MANAGER'S 41,-----------
I z
REMAIN. CONNECT WITH NEW 3' GREASE � ;: <j «; >y >r . ; I E
i. , '.: -,.
-::
r:' ......
DRAIN AND PROVIDE 3' SANITARY DRAIN TO ' ,: `'` > s i t `' Z -: -..:
. OFFICE
EXISTING SANITARY LATERAL. /' ...> I °'� ;i'
;r €::«:: ¢: t ; fi RAISED
�r S $.;i:::. fi 2 1
°/ .............
r f° � I I fi s -, LOUNGE
: .....
::::: U 11 ......
/' ,,rr'' ii•aaitrwi I �?.: --�Y: 4E- ::'__ I ! ,!' —0 Ii 's I
11 " /' #:> _._
r I
- f -- •R
:•
.,..
_
:..:: --
--- - - - - -- ---------------- - - - - -- - fi I
.:...
/' : ..:.:;:::.:: x l;e
-i$$: " i ii. ' 'i: " }fFy''� `yjfE$f {} j{f{ 'j {£F 4
✓ F F:>: -. .°._--.__..._..__________ _____- _,___`__ °.._.- ,,,.__..i'v S::::;:::x: s Fiii i p
I
CONNECT NEW 3' DRAIN TO EXISTING / ` / �$ ' € =i :'_
SANITARY LATERAL VERIFY EXACT LOCATION ; ` / !$ _ :: em __ - - -___-
AND INCERT ELEVATION IN FIELD. ; / t f ; Al: . rr < _ °- .,..._
, x (�( { $ I ;
I = I \ I
:'
€:::{
:i
:.r:,-..
: : - -- L ................. I ....... � .......
h 1
: :. r:.�.�: :: - -..
r .::.::ii::::::
-,....
.4:::.
,°
,,
. . / ;
/' 'rs I I I
:. -. ,
f_--- l
..
E I t
0
:
I \' \' / I I
floor Plan -Plum in �__ _____� )
EXISTING S ER LATERAL
SCALE- . ]14"=I'-0' �-- — — — — —
W _s ;;
cr �\,
�`� ,� is
< I ..__`/
I.
z Ir�
; �,F .
) I R
%I I<
\1- -.__ /
M : €.
9::.::__-_; _
:
' • i• e '
Y --- -
• i;
I I ``
I! ___.__ -___.-__.___- __- _- _- __________'
I 9 i
1"_______'i -__ -_- _ -____ ___ -_. _.
.
: . '
L_'____-.1 t-1_-------__t �=�==ti' i E
. : ::
OUTDOOR
I
SITTING
DIN G
r�',
�—_
A
/� E ��� I
/ f i
... "...
---:.:,
( ---�1. a : :� --, -.
I;
I EXIST, 1-1/ MFI�! CONNECT EW I
1 -V4 CW UIE BUiI
i
I %, j ' } , e `} I
C'
i tt c
'at t
_ .___--__--_.--_-____.-_-_-_____
0 i r .,,_ j.,��f � '
i; f
I^f/ W j
0 ._ --
I
ff >/— s '�
I r
(r 1 } E '.
l
W % f % i j
s a
;
W
a.........
�_...'
2 pp
WER (9 Z - - --
0
r
�. _____ __
m
[ ;:w.s
N
: t::
j
0 _ 11-
I- ( ,. : I
m
a €
_
W I : ! ..
I /
�\ °
/
/
/ F'r'f
\\
`'. --
.4
_a I w-
>
W
W
J
6
J
., G
ject info
revisions
UQ
wZ
K a
a
FI EDE P ARTMENT
10 - 19 - 13
3:0
uJ
i
�
mix
ow
3
BUILD. DEPT.
01-17-14
17
(1)
E
OWNER CHANGES
2-
02-20-14
•
E:
I
i
•
0
0
•
U
r
C'
-
.0
C:)
—
�mw
E
M
?:
L�
E �;
•
r
'
i
0
•
+
+
•
•
r
•
•
•
•
>_ ,` c y , '
a "t O axy�[e
U3 _ 0 9 4°
.
c� n
W I � . '
U •;• S ,-f " 7 F
W 'f a _ w... ,. -5r. °2014
,., ' -
ROLANDO MA�ENGNE �RPE�55482
O FLORIDA PROFESSIONAL
Z
65,
revisions
UQ
wZ
K a
a
FI EDE P ARTMENT
10 - 19 - 13
3:0
uJ
�
mix
ow
3
BUILD. DEPT.
01-17-14
17
a Z
w3
=o
4
a
OWNER CHANGES
2-
02-20-14
OZ
5
a
OWNER CHANGES
03 -30 -24
o
h�_
3.0
QO
aU
'G
.
I
i FLOOR PLAKI
PLUMBING
a
•
project number:
drawing scale :
a As Shown
Se P tembe-r 16 2013
Permit Set
i_J