Loading...
13-1358R-015GENERAL PLUMBING NOTES SYMBOL LEGEND SYMBOL DESCRIPTION 1t PLUMBING CONTRACTOR SHALL PRESSURE TEST ALL PIPING AS Z ALL WORK SHALL CONFORM WITH FLORIDA BUILDING CODE 2010 A INSTALL MATERIALS AND EQUIPMENT IN A NEAT AND FIRST REQUIRED BY CODE TEST SHALL BE WITNESSED AND APPROVED EDITION (FB.Ci 2010), FEDERAL ORDINANCES GOVERNING THE CLASS WORKMANLIKE MANNER THE OWNER RESERVES THE BY PROPER AUTHORITIES. INSTALLATION OF THE PLUMBING SYSTEM IF WORK AS LAID RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ITEMS WHICH, EXISTING SANITARY DRAIN OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS IN HIS OPINION, DO NOT PRESENT A NEAT AND WORKMANLIKE 12 THE PLUMBING CONTRACTOR SHALL WARRANT ALL WITH LOCAL ORDINANCES, BUILDING CODES AND REGULATIONS, APPEARANCE REMOVAL AND REPLACEMENT IS TO BE DONE WORKMANSHIP AND MATERIALS FOR ONE YEAR FROM THE DATE THE CONTRACTOR SHALL REPORT IN WRITING TO THE IMMEDIATELY WHEN DIRECTED BY THE OWNER IN WRITING, AT OF FINAL WORK ACCEPTANCE BY OWNER ANY BREAKDOWN ARCHITECT/ENGINEER BEFORE SUBMITTING A BID. THE THE SOLE EXPENSE OF CONTRACTOR OCCURRING IN FIRST YEAR SHALL BE REPAIRED AT NO EXPENSE ARCHITECT/ENGINEER WILL THEN ISSUE INSTRUCTIONS AS 6 START OF WORK BY CONTRACTOR SHALL BE CONSIDERED AS TO THE OWNER HOW TO PROCEED. ACCEPTANCE BY HIM OF ALL CLAIMS OR QUESTIONS AS TO 13. PROVIDE BATHROOM FIXTURES AS SPECIFIED OR AS SELECTED BY 2 THE DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT SUITABILITY OF THE WORK OF OTHER TRADES OR OTHER OWNER AND TO COMPLY W/FB.C2001 SPECIALLY CHAPTER 11 NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL OF THE CONTRACTORS TO RECEIVE HIS WORK. THIS CONTRACTOR COLD WATER MINOR ITEMS UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE SHALL REMOVE AND REPLACE AT HIS EXPENSE ALL PLUMBING A PROVIDE SHUTOFF VALVE FOR EACH FIXTURE STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS SHALL WORK WHICH MAY HAVE TO BE REMOVED BECAUSE OF 15 WHEREVER NOT SIMILAR METALS ARE TO BE JOINED, A DIELECTRIC GOVERN THE EXACT LOCATIONS CONTRACTOR SHALL FOLLOW INTERFERENCE WITH OTHER TRADES FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. DRAWINGS IN LAYING OUT WORK CHECK DRAWINGS OF ALL 1/2- -- TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED & THIS CONTRACTOR SHALL OBTAIN AND PAY ALL INSURANCE 16; PLUMBING CONTRACTOR SHALL.. PROVIDE AIR CONDITIONING AND MAINTAIN MAXIMUM HEAD ROOM, AND SPACE CONDITIONS FEES, PERMITS, ASSOCIATION DUES, ROYALTIES AND TAXES OF CONDENSATE DRAIN AND TRAP. SEE AIR CONDITIONING PLANS AT ALL POINTS. WHERE HEAD ROOM, OR SPACE CONDITIONS WHATEVER NATURE SHALL APPLY TO THIS WORK HE SHALL ALSO FOR LOCATION OF UNITS AND DRAINS APPEAR INADEQUATE ARCHITECT/ ENGINEER SHALL BE PAID ALL THE INSPECTION FEES AS MAY REQUIRED BY LAW OR 3" NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS ORDINANCE AND SHALL KEEP THE OWNER HARMLESS FROM ANY IT ALL SANITARY SHALL BE DIRECTIONAL TYPE CONTRACTOR SHALL, WITHOUT EXTRA CHARGE MAKE FIELD DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF LAWS, 1a MATERIALS MODIFICATION IN LAYOUT AS NEEDED TO PREVENT CONFLICT RULES OR ORDINANCES A COLD WATER PIPING DOWNSTREAM OF WATER METER SHALL BE WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION 1 PVCOPVC BELOW GROUND AND ABOVE GROUND OF THE WORK, 7. PROVIDE MEANS "FURNISH AND INSTALLt 13. COLD WATER PIPES INSIDE OF SLAB SHALL BE PVC -CPVC a EXAMINE ALL DRAWINGS CAREFULLY PF40R TO SUBMITTING A BID. a DO A COMPLETE JOB, EVERYTHING CONNECTED, READY FOR USE INSTALL INSIDE POLYETHYLENE CONDUIT. NO JOINTS PERMITTED INSIDE SLAB. CONTRACTOR WILL BE REQUIRED TO FURNISH, INSTALL AND /OR SHOP DRAWINGS CONTRACTOR SHALL FURNISH THE ENGINEER C. SANITARY WASTE AND VENT 4% AND SMALLER SHALL BE P.VC. SCHEDULE 40 CONNECT WITH APPROPRIATE SERVICES ALL PLUMBING ITEMS WITH SHOP DRAWINGS OF EQUIPMENT PRIOR TO PURCHASE S STORM LINES INSIDE BUILDING SHALL BE PV.C. SCHEDULE 40 SHOWN ON ANY OF THE ARCHITECTURAL, AIR CONDlT10NING, FOR APPROVAL E IN COASTAL AREAS ALL SANITARY AND STORM PIPING OUTSIDE OF BUILDING ELECTRICAL AND SPRINKLER DRAWINGS WITHOUT ADDITIONAL 1/2" SHALL BE SCHEDULE 40, PVC EXPENSE TO THE OWNER IF DISCREPANCIES. CONFLICTS, 10. AT COMPLETION OF JOB THE PLUMBING CONTRACTOR SHALL F CONDENSATE DRAIN PIPE SHALL BE SCHEDULE 40, PVC PIPE AND FITTINGS. INTERFERENCE OR OMISSIONS OCCUR BETWEEN DRAWINGS, GIVE THE OWNER AN AS -BUILT SET OF REPRODUCIBLE SEPIAS 1/2" NOTIFY IN WRITING THE ARCHITECT/ ENGINEER IN AMPLE TIME SHOWING THE EXACT LOCA71ON OF ALL INSTALLATIONSS, O WATER HEATER RELIEF AND DRAIN LINE SHALL. BE TYPE 9..' CU, MIN. 3/4' DIA PLUMBING SYMBOL LEGEND SYMBOL DESCRIPTION COLD NEW SANITARY WASTE LINE — — — — — — — — SANITARY VENT LINE - - NEW COLD WATER LINE - - - - NEW HOT WATER LINE — — — ® — — EXISTING SANITARY DRAIN — EXISTING WATER LINE CID NEW GREASE DRAIN 013 CONDENSATE DRAIN LINE " * 1/2- GATE VALVE G --) 00 CLEANOUT 44h FID FLOOR DRAIN 9 PIPE DOWN 3/4- / " POINT OF CONNECTION TO DOSTNG VTR VENT THRU ROOF EWA ELECTRIC WATER HEATER FFID FLOOR DRAIN V TR COLD WATER IN HOT WATER F.U. FIXTURE UNITS ARRESTOR : HAMMER i - HAMMER ARRESTOR O-W SHALL BE "AM APPROVED EQUAL I E. HA SHALL BE INSTALLED WHERE QUICK-CLOSING VALVES ARE Er 1 • -• �r • r WITHIN AN EFFECTIVE 11 RANGE OF QUICK-CLOSING IIIIIIIIIIIIIIIIIIIIIIIII �r • • III �i FOR FIRE RATED PENIETRATION REFER TO ARCHffECTURAL PLANS, I _ PARTITION NOTE. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE PARTITION CONTRACTOR TO INSTALL 6' WALL WHEN 3' OR 4' PLUMBING STACK IS INSTALLED. RESTROOM FIXTURE CONNECTION SCHEDULE ITEM ASTE & SOIL (AS PER TABLE 70RI WATER (AS PER TABLE 604.5) COLD HOT WATER CLOSET' 3' V2" - - LAVATORY 1 -1/4" V2' - - FLOOR DRAINS 3' -- - - ICE 0 MATIC ICE0500HA " 1/2- TO F.S. " * 1/2- __ NOTE: ALL TRAPS SHALL BE CONSISTENT W/ FIXTURE OUTLET SIZE NOTE: ALL FIXTURE SHALL COMPLY W/ FBC. TABLE 604Ai • • NOTES i - ALL SANITARY PIPE 2 M OR SMALLER %ALL RJN 0 VV SLOPE PER r •r:. SLOPE PER LFE I - ALL PIPES TO r SC - r I( r °-O •, SPLICE • v .• %IALL BE r ■ S • ' •:' SEPARATION enuinmenk wnEer /snniknru ennnerkinn schedule ■ v ITEM QTY. EQUIPMENT CATEGORY MODEL NO. WASTE COLD WATER HOT WATER 1 1 LAMARZOCCO GB -5 GB -5 3 GROUP __ " * 1 2 / __ 7 1 ICE MACHINE ICE 0 MATIC ICE0500HA " 1/2- TO F.S. " * 1/2- __ 19 1 ECOLAB DISHWASHER ECOLAB APEXTSC SINGLE 2 " -- 3/4- / " 23 1 BREWER BUNN MODEL DUAL TF DBC -- " 1/2 * -- 27 1 HOT WATER DISPENSER BUNN MODEL H5E /H5X __ 1/2" * __ 31 1 HAND SINK KROWNE METAL HS -9 1 -1 /4" 1/2- -- 32 1 MOP SINK ZURN 21996 -24 3" 3/4" 3/4- 33 1 3 COMPARTMENT SINK JOHN BOOS 3816204 -2D18 3" -- -- 34 1 SINK FAUCET -- 3/4" 3/4" 35 1 BARISTA SINK EAGLE SR22 -22- 13.5 -1 1 -1/2" 1/2" 1/2" 54 1 PITCHER RINSER EXPRESSO PART S STEAMING PITCHER RINSER 6x6 x2 1_1/2" 1/2" 1/2- 55 1 SODA GUN -- 1/2" -- 58 1 WATER FILTER 3M EXPRESSO ESP -- 1/2" -- NOTES : 1. EQUIPMENT LAYOUT & SCHEDULE SHOWN IS PER KITCHEN CONSULTANT . .............0. REFER TO EQUIPMENT SHOP DRAWINGS PREPARED BY .. ..........................." SHOP DRAWINGS FOR DETAILS. 2. WATER SUPPLY FROM ADJACENT WATER FILTER 3. REFER TO EQUIPMENT SHOP DRAWINGS FOR NOTES AND DETAILS. �//// F/'/"��/ CONNECT TO EXISTING STUB UP 4U SANITARY LINE, VERIFY IN FIELD 1 4 1 / 11 I " __7 Y WOMEN'S RESTROOM MEN'S ' !ESTROQ - i /��_' = - =- -- ° _" =- _ ;\ ,�- _ c 3 f :: tE/ - T :E__ ,. Ii t, _'--_ /`� :B ;i; � t__ H J '.� FD' ;� CW I I \ 61 ., IL t �l I Y gi :ta f � - I � �. PIZZA 8 PREP ARE/ /— .' - ,1 I 0 f__ s .� 6 r . ,.- ,- -.. -.q - - f -_ -�. , ,: f S - t 4 i i E z ., r:'; : p 2 -�-- -t s -- -- _________ - -- 1 6 ; i s : >.:: w;'. >; #.... ,. ::: T. r:: , %.. ... ! i 4 - -W' - I \ ( �/ :$ ' I{. t . .., /': i ' i` -`r w _ ` g ; ---- -- - -- - - - -- -- -- -- -- -,,. _. - ":,_,...._.. w:°.°__:e. ,� r/ _ �_ _ M - >> - $ €k::. : :` u� .;;; r- E $ � __ Li..ri -. I (: s , � - /� , ' I 0 is ` + s 1. / f °' j/:: ; d . f - Z € fi PREP �-t' I I I'll :. ". I I r' .; AREA ;s7; - . Ii ; ! 4___ f E , rr I F ml.-_� �-: 1 Cyy - -_ a ;: -� IOC---- - #: i : � , I I rte/ ,r ,,,,� -: _ I ytr@ :::I , r'' - >;:; >: }: : g _ S / : f` I F.A I s s 3° I fi g fi; 1 :. z e^ 3 :.:...... . ....................... I' 1f , "�'s I :. tMSyj ` 3 � s 7, w f �a e R €::::,; r` $' >:, . ; ', „` ELECTRICAL :< ! ° . ROOM e'` r "t^ $., I ifz :' I I ! ;: i ,t CE I l i E s , °, ;: ;; ti -. t: i I I , .__ __ —._ -__ —;_ -- _ ___ __ It , FI I a; ' $ • _ ._. IF, 3 E fi li ;: GI, $;i ,�, r# ;4> SINK I }.V 1a d f I : r / • - - -- / / ( `� f f� �. `. j.: 3 I / <:. B •. r 11 a .... �1 ..:.. r , r , . r r 1.: ,p i r `'} , r :E ! 3/4' CW 6ACK OP I is 'tier ; ; '� KITCHEN I :fir- :: :I :; 1 r g / ` -I _ _ P.C.S. . µ •. It TRAM R M' FD r t i f I, +f $ -; s- - ` p ,; U TER ; , lf+.'T. `E: i!/ /`� J .r° ;, I. $ f.- 'y.••a I -_., 3, 4 4'i p f• g /ff /, j. /., `r Ir`r / r' g i €... :.'. :: I °',Gf$ !� 2�• S , Y / ,,. ,�,feJr //f /' f f I €. is �._ t �, ♦ F s f F: f 1 f i f: S -'..� �� I A..4' f C °•• // i11 r . r i : w/ :'� p� RF 1. t , r.L<L:: ` f - fzI ..... ::::::: :: -:: ° �- .. : r • i S I_.. l Q :;,ti- ----:-:� G- - s " i E— — ;f{ • a ,•' - it;iriiii "+iii : i;:iiiit :$# y, ..: ' S: :i:::.E ..,:... C f K IIY :: 5 ;: {1 :� $ fi I : ,__.� _ r� EWH- 1..:::.:. ............. , J .: / } •/ k, : i,r ,f I o o _ : fi O _ „Y:, _- , I { ::::::: ; WALK -IN j I. AHU -2 COOLER ' { a` e� f .. '.'.,',�. Y .S• t I `ti f":: �:::::::: i : %::':ti'.':':: : :;T:i::::5:i::: is i:::::::::.: q //��� :I >< fi / { '' , 6 g ? o P ; 8 - = 4 �=— Im/ I- fi O s — Z p : 11 0 r I:;:`,' RRR 1,,...':::. fi I . Vi ' fi r' '' t :':`' itiit3tisi I.'�, 8 I :✓ S r.. •. -. ,r', /.r '°a f d t:E::EEE:i �'< : ;•py`tk^t^s^Tt*::FF `• , :; ; ^ g f' t' { . g :5 ii-." iii r. •••'• •.i ;;� '44;f' #i# E } v/ q tE.,...... : i' :, �a - Z d I .... s W F i °_._ { �{ fi S i $ R Fe LL , _°-- - __ 1tI I , 11 / ;::;::` i °. _ ._.._._._ ___ : • - - - - -- -,..., - s ,- I , :' ! S S . r ''.� i : Imo:` f $':::4: A 1- ---- -- _ -cam-_ / :.. :::. : ,:: STORAGE i I ` :: AF r .'F__. :.;.. 5':Si• + iS} j f «.f t • '° . ..w:: . I $: v ; e . } fi I __- - g _ _ -.._..._._-°- ,.-- _ ... .. ....... .. .... ....___ :: ... /j' €..... ? / cry EXISTING 1250 GAL GREASE TRAP. TO -° --'--'-- -° ___._.__ -__ f XXI.Al li' # r < ¢ : =- MANAGER'S 41,----------- I z REMAIN. CONNECT WITH NEW 3' GREASE � ;: <j «; >y >r . ; I E i. , '.: -,. -:: r:' ...... DRAIN AND PROVIDE 3' SANITARY DRAIN TO ' ,: `'` > s i t `' Z -: -..: . OFFICE EXISTING SANITARY LATERAL. /' ...> I °'� ;i' ;r €::«:: ¢: t ; fi RAISED �r S $.;i:::. fi 2 1 °/ ............. r f° � I I fi s -, LOUNGE : ..... ::::: U 11 ...... /' ,,rr'' ii•aaitrwi I �?.: --�Y: 4E- ::'__ I ! ,!' —0 Ii 's I 11 " /' #:> _._ r I - f -- •R :• .,.. _ :..:: -- --- - - - - -- ---------------- - - - - -- - fi I .:... /' : ..:.:;:::.:: x l;e -i$$: " i ii. ' 'i: " }fFy''� `yjfE$f {} j{f{ 'j {£F 4 ✓ F F:>: -. .°._--.__..._..__________ _____- _,___`__ °.._.- ,,,.__..i'v S::::;:::x: s Fiii i p I CONNECT NEW 3' DRAIN TO EXISTING / ` / �$ ' € =i :'_ SANITARY LATERAL VERIFY EXACT LOCATION ; ` / !$ _ :: em __ - - -___- AND INCERT ELEVATION IN FIELD. ; / t f ; Al: . rr < _ °- .,..._ , x (�( { $ I ; I = I \ I :' €:::{ :i :.r:,-.. : : - -- L ................. I ....... � ....... h 1 : :. r:.�.�: :: - -.. r .::.::ii:::::: -,.... .4:::. ,° ,, . . / ; /' 'rs I I I :. -. , f_--- l .. E I t 0 : I \' \' / I I floor Plan -Plum in �__ _____� ) EXISTING S ER LATERAL SCALE- . ]14"=I'-0' �-- — — — — — W _s ;; cr �\, �`� ,� is < I ..__`/ I. z Ir� ; �,F . ) I R %I I< \1- -.__ / M : €. 9::.­­::__-_; _ : ' • i• e ' Y --- - • i; I I `` I! ___.__ -___.-__.___- __- _- _- __________' I 9 i 1"_______'i -__ -_- _ -____ ___ -_. _. . : . ' L_'____-.1 t-1_-------__t �=�­==ti' i E . : :: OUTDOOR I SITTING DIN G r�', �—_ A /� E ��� I / f i ... "... ---:.:, ( ---�1. a : :� --, -. I; I EXIST, 1-1/ MFI�! CONNECT EW I 1 -V4 CW UIE BUiI i I %, j ' } , e `} I C' i tt c 'at t _ .___--__--_.--_-____.-_-_-_____ 0 i r .,,_ j.,��f � ' i; f I^f/ W j 0 ._ -- I ff >/— s '� I r (r 1 } E '. l W % f % i j s a ; W a......... �_...' 2 pp WER (9 Z - - -- 0 r �. _____ __ m [ ;:w.s N : t:: j 0 _ 11- I- ( ,. : I m a € _ W I : ! .. I / �\ ° / / / F'r'f \\ `'. -- .4 _a I w- > W W J 6 J ., G ject info revisions UQ wZ K a a FI EDE P ARTMENT 10 - 19 - 13 3:0 uJ i � mix ow 3 BUILD. DEPT. 01-17-14 17 (1) E OWNER CHANGES 2- 02-20-14 • E: I i • 0 0 • U r C' - .0 C:) — �mw E M ?: L� E �; • r ' i 0 • + + • • r • • • • >_ ,` c y , ' a "t O axy�[e U3 _ 0 9 4° . c� n W I � . ' U •;• S ,-f " 7 F W 'f a _ w... ,. -5r. °2014 ,., ' - ROLANDO MA�ENGNE �RPE�55482 O FLORIDA PROFESSIONAL Z 65, revisions UQ wZ K a a FI EDE P ARTMENT 10 - 19 - 13 3:0 uJ � mix ow 3 BUILD. DEPT. 01-17-14 17 a Z w3 =o 4 a OWNER CHANGES 2- 02-20-14 OZ 5 a OWNER CHANGES 03 -30 -24 o h�_ 3.0 QO aU 'G . I i FLOOR PLAKI PLUMBING a • project number: drawing scale : a As Shown Se P tembe-r 16 2013 Permit Set i_J