GENERAL PLUMBING NOTES
I ALL WORK SHALL CONFORM WITH FLORIDA BUILDING CODE 2010
4 INSTALL MATERIALS AND EQUIPMENT IN A NEAT AND FIRST
EDITION (F,B.C. 2010), FEDERAL ORDINANCES GOVERNING THE
CLASS WORKMANLIKE MANNER THE OWNER RESERVES THE
INSTALLATION OF THE PLUMBING SYSTEM IF WORK AS LAID
RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ITEMS WHICH,
OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS
IN HIS OPINION, DO NOT PRESENT A NEAT AND WORKMANLIKE
WITH LOCAL ORDINANCES, BUILDING CODES AND REGULATIONS,
APPEARANCE REMOVAL AND REPLACEMENT IS TO BE DONE
THE CONTRACTOR SHALL REPC," ,T IN WRITING TO THE
IMMEDIATELY WHEN DIRECTED BY THE OWNER IN WRITING, AT
ARCHITECT/ENGINEER BEFORE SUBMITTING A BI D. THE
THE SOLE EXPENSE OF CONTRACT OR
ARCHITECT/ENGINEER WILL THEN ISSUE INSTRUCTIONS AS
HOW TO PROCEED,
S START OF WORK BY CONTRACTOR SHALL BE CONSIDERED AS
GATE VALVE
ACCEPTANCE BY HIM OF ALL CLAIMS OR QUESTIONS AS TO
2 THE DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT
SUITABILITY OF THE WORK OF OTHER TRADES OR OTHER
NECESSARILY SHOWING IN DETAIL OR TO SCALE ALL OF THE
CONTRACTORS TO RECEIVE HIS WORK THIS CONTRACTOR
MINOR ITEMS UNLESS SPECIFIC DIMENSIONS ARE SHOWN, THE
SHALL REMOVE AND REPLACE, AT HIS EXPENSE, ALL PLUMBING
STRUCTURAL. ARCHITECTURAL AND SITE CONDITIONS SHALL
WORK WHICH MAY HAVE TO BE REMOVED BECAUSE OF
GOVERN THE EXACT LOCATIONS. CONTRACTOR SHALL FOLLOW
INTERFERENCE WITH OTHER TRADES
DRAWINGS IN LAYING OUT WORK, CHECK DRAWINGS OF ALL
FD
TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED
65, THIS CONTRACTOR SHALL OBTAIN AND PAY ALL INSURANCE,
AND MAINTAIN MAXIMUM HEAD ROOM, AND SPACE CONDITIONS
FEES, PERMITS, ASSOCIATION DUES, ROYALTIES AND TAXES OF
AT ALL POINTS. WHERE HEAD ROOM, OR SPACE CONDITIONS
WHATEVER NATURE SHALL APPLY TO THIS WORK HE SHALL ALSO
APPEAR INADEQUATE ARCHITECT/ ENGINEER SHALL BE
NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS
PAID ALL THE INSPECTION FEES AS MAY REQUIRED BY LAW OR
ORDINANCE AND SHALL KEEP THE OWNER HARMLESS FROM ANY
CONTRACTOR SHALL WITHOUT EXTRA CHARGE, MAKE FIELD
DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF LAWS
MODIFICATION IN LAYOUT AS NEEDED TO PREVENT CONFLICT
RULES OR ORDINANCES
WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION
1
OF THE WORK.
T PROVIDE MEANS "FURNISH AND INSTALL!.
S EXAMINE ALL DRAWINGS CAREFULLY PRIOR TO SUBMITTING A BID,
S. DO A COMPLETE JOB, EVERYTHING CONNECTED, READY FOR USE
CONTRACTOR WILL BE REQUIRED TO FURNISH, INSTALL AND /OR
CONNECT WITH APPROPRIATE SERVICES ALL PLUMBING ITEMS
9• SHOP DRAWINGS: CONTRACTOR SHALL FURNISH THE ENGINEER
SHOWN ON ANY OF THE ARCHITECTURAL AIR CONDITIONING,
F OR SHOP DRAWINGS OF EQUIPMENT PRIOR TO PURCHASE
FOR APPROVAL
ELECTRICAL AND SPRINKLER DRAWINGS WITHOUT ADDITIONAL
3"
EXPENSE TO THE OWNER IF DISCREPANCIES, CONFLICTS,
1D. AT COMPLETION OF JOB THE PLUMBING CONTRACTOR SHALL
INTERFERENCE OR OMISSIONS OCCUR BETWEEN DRAWINGS,
GIVE THE OWNER AN AS -BUILT SET OF REPRODUCIBLE SEPIAS
NOTIFY IN WRITING THE ARCHITECT/ ENGINEER IN AMPLE TIME
SHOWING THE EXACT LOCATION OF ALL INSTALLATIONS
TO PERMIT REVISIONS BEFORE THE BIDS ARE SUBMITTED.
--
PLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION
Irwlwli--n rinnco I yr .-
HAMMER ARRESTOR (HA) SHALL BE JOSAA
ABSORBOTRON TYPE Na 75001 OR
APPROVED EQUAL
A WATER HA SHALL BE INSTALLED WHERE
QUICK- CLOSING VALVES ARE UTILIZED,
UNLESS OTHERWISE APPROVED.
SHALL BE LOCATED WITHIN AN EFFECTIVE
RANGE OF THE QUICK-CLOSING VAI VF.
It PLUMBING CONTRACTOR SHALL PRESSURE TEST ALL PIPING AS
REQUIRED BY CODE TEST SHALL BE WITNESSED AND APPROVED
BY PROPER AUTHORITIES.
12 THE PLUMBING CONTRACTOR SHALL WARRANT ALL
WORKMANSHIP AND MATERIALS FOR ONE YEAR FROM THE DATE
OF FINAL WORK ACCEPTANCE BY OWNER ANY BREAKDOWN
OCCURRING IN FIRST YEAR SHALL BE REPAIRED AT NO EXPENSE
TO THE OWNER
13. PROVIDE BATHROOM FIXTURES AS SPECIFIED OR AS SELECTED BY
OWNER AND TO COMPLY W/FB.C2001 SPECIALLY CHAPTER 1t
14, PROVIDE SHUTOFF VALVE FOR EACH FIXTURE
15. WHEREVER NOT SIMILAR METALS ARE TO BE JOINED, A DIELECTRIC
FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES
16 PLUMBING CONTRACTOR SHALL PROVIDE AIR CONDITIONING
CONDENSATE DRAIN AND TRAP, SEE AIR CONDITIONING PLANS
FOR LOCATION OF UNITS AND DRAINS,
17. ALL SANITARY FITTINGS SHALL BE DIRECTIONAL TYPE
16. MATERIALS
A COLD WATER PIPING DOWNSTREAM OF WATER METER SHALL BE
PVC -CPVC BELOW GROUND AND ABOVE GROUND.
B COLD WATER PIPES INSIDE OF SLAB SHALL BE PVC -CPVC
INSTALL INSIDE POLYETHYLENE CONDUIT. NO JOINTS PERMITTED INSIDE SLAB
C. SANITARY WASTE AND VENT 4 "0 AND SMALLER SHALL BE RVC, SCHEDULE 40
S STORM LINES INSIDE BUILDING SHALL BE RVC. SCHEDULE 40
E IN COASTAL AREAS ALL SANITARY AND STORM PIPING OUTSIDE OF BUILDING
SHALL BE SCHEDULE 40, PVC.
F. CONDENSATE DRAIN PIPE SHALL BE SCHEDULE 40, PVC PIPE AND FITTINGS
G. WATER HEATER RELIEF AND DRAIN LINE SHALL BE TYPE "L" CU, MIN, 3/4" DIA
RESTROOM FIXTURE CONNECTION SCHEDULE
NEW SANITARY WASTE LINE
— — — — — — — —
SANITARY VENT LINE
- -
NEW COLD WATER LINE
- - - -
NEW HOT WATER LINE
— — — — —
EXISTING SANITARY DRAIN
LAVATORY
EXISTING WATER LINE
QD
NEW GREASE DRAIN
013
CONDENSATE DRAIN LINE
1
GATE VALVE
a 00
CLEANOUT
FD
FLOOR DRAIN
Ct
PIPE DOWN
ECOLAB DISHWASHER
POINT OF CONNECTION TO EXISTING
VT.R
VENT THRU ROOF
E.W.H.
ELECTRIC WATER HEATER
FD
FLOOR DRAIN
CW
COLD WATER
HW
HOT WATER
F.U.
FIXTURE UNITS
Irwlwli--n rinnco I yr .-
HAMMER ARRESTOR (HA) SHALL BE JOSAA
ABSORBOTRON TYPE Na 75001 OR
APPROVED EQUAL
A WATER HA SHALL BE INSTALLED WHERE
QUICK- CLOSING VALVES ARE UTILIZED,
UNLESS OTHERWISE APPROVED.
SHALL BE LOCATED WITHIN AN EFFECTIVE
RANGE OF THE QUICK-CLOSING VAI VF.
It PLUMBING CONTRACTOR SHALL PRESSURE TEST ALL PIPING AS
REQUIRED BY CODE TEST SHALL BE WITNESSED AND APPROVED
BY PROPER AUTHORITIES.
12 THE PLUMBING CONTRACTOR SHALL WARRANT ALL
WORKMANSHIP AND MATERIALS FOR ONE YEAR FROM THE DATE
OF FINAL WORK ACCEPTANCE BY OWNER ANY BREAKDOWN
OCCURRING IN FIRST YEAR SHALL BE REPAIRED AT NO EXPENSE
TO THE OWNER
13. PROVIDE BATHROOM FIXTURES AS SPECIFIED OR AS SELECTED BY
OWNER AND TO COMPLY W/FB.C2001 SPECIALLY CHAPTER 1t
14, PROVIDE SHUTOFF VALVE FOR EACH FIXTURE
15. WHEREVER NOT SIMILAR METALS ARE TO BE JOINED, A DIELECTRIC
FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES
16 PLUMBING CONTRACTOR SHALL PROVIDE AIR CONDITIONING
CONDENSATE DRAIN AND TRAP, SEE AIR CONDITIONING PLANS
FOR LOCATION OF UNITS AND DRAINS,
17. ALL SANITARY FITTINGS SHALL BE DIRECTIONAL TYPE
16. MATERIALS
A COLD WATER PIPING DOWNSTREAM OF WATER METER SHALL BE
PVC -CPVC BELOW GROUND AND ABOVE GROUND.
B COLD WATER PIPES INSIDE OF SLAB SHALL BE PVC -CPVC
INSTALL INSIDE POLYETHYLENE CONDUIT. NO JOINTS PERMITTED INSIDE SLAB
C. SANITARY WASTE AND VENT 4 "0 AND SMALLER SHALL BE RVC, SCHEDULE 40
S STORM LINES INSIDE BUILDING SHALL BE RVC. SCHEDULE 40
E IN COASTAL AREAS ALL SANITARY AND STORM PIPING OUTSIDE OF BUILDING
SHALL BE SCHEDULE 40, PVC.
F. CONDENSATE DRAIN PIPE SHALL BE SCHEDULE 40, PVC PIPE AND FITTINGS
G. WATER HEATER RELIEF AND DRAIN LINE SHALL BE TYPE "L" CU, MIN, 3/4" DIA
RESTROOM FIXTURE CONNECTION SCHEDULE
ITEM
WASTE &
SOIL (AS PER
TABLE 700
WATER (AS PER TABLE 6045)
COLD
HOT
WATER CLOSET
3"
1/2"
- -
LAVATORY
1 -1/4"
1/2"
1/2" *
FLOOR DRAINS
3"
1
ICE MACHINE
ICE 0 MATIC ICE0500HA
1/2" TO F.S.
1/2" *
--
NOTE ALL TRAPS SHALL BE CONSISTENT W/ FIXTURE OUTLET SIZE
NOTE: ALL FIXTURE SHALL COMPLY W/ F.B.C. TABLE 604,A
L.VNa 1 KUL; 1 IUN NU 1 1'5
- ALL SANITARY PIPE 21/2'0 OR SMALLER SHALL RUN • Ve SLOPE
PER LFT, 3' AND LARGER • 1/1" SLOPE PER LFT.
ALL PIPES TO DISCHARGE MIR 12' FROM STRUCTURE
ALL PLUMBING WATER DEVICE PROVIDE SHUT-OFF VALVE
NO SPLICE ALLOWED UNDER SLAB.
AI I VTR SHAT 1 RF rwTsU -T 1 RAIN CIF 111M FAf1AI n1w QC■A■AW)m um i
EXISTING 1250 GAL GREASE TRAP, TO
REMAIN. CONNECT WITH NEW 3" GREASE
DRAIN AND PROVIDE 3" SANITARY DRAIN TO
EXISTING SANITARY LATERAL
CONNECT NEW 3" DRAIN TO EXISTING
SANITARY LATERAL VERIFY EXACT LOCATION
AND INCERT ELEVATION IN FIELD,
CONNECT TO EXISTING
STUB UP 4" SANITARY LINE
VERIFY IN FIELD
Fir%r%r
SCALE: 114 * =1' -0"
.'
ITEM
QTY.
EQUIPMENT CATEGORY
MODEL NO.
WASTE
COLD WATER
HOT WATER
1
1
LAMARZOCCO GB -5
GB -5 3 GROUP
--
1/2" *
W u w
7
1
ICE MACHINE
ICE 0 MATIC ICE0500HA
1/2" TO F.S.
1/2" *
--
19
1
ECOLAB DISHWASHER
ECOLAB APEXTSC SINGLE
2"
--
3/4"
23
1
BREWER
BUNN MODEL DUAL TF DBC
--
1/2" *
27
1
HOT WATER DISPENSER
BUNN MODEL H5E /H5X
__
1/2" *
_-
31
1
HAND SINK
KROWNE METAL HS -9
1 -1/4"
1/2"
ELu
32
1
MOP SINK
ZURN Z1996 -24
3"
3/4"
3/4"
33
1
3 COMPARTMENT SINK
JOHN BOOS 3B16204 -2D18
3"
--
--
34
1
SINK FAUCET
LL
--
3/4"
3/4"
35
1
BARISTA SINK
EAGLE SR22- 22- 13.5 -1
1-1/2-
1/2-
1/2-
54
1
PITCHER RINSER
EXPRESSO PART S STEAMING
"x6 "x2"
1_1/2"
1/2"
1/2"
PITCHER RINSER 6
55
1
SODA GUN
_T
__
1/299
rWY
58
1
WATER FILTER
3M EXPRESSO ESP
_-
1 /2"
-_
NOTES
1. EQUIPMENT LAYOUT & SCHEDULE SHOWN IS PER KITCHEN CONSULTANT ................ REFER TO EQUIPMENT SHOP
DRAWINGS PREPARED BY " ..........................." SHOP DRAWINGS FOR DETAILS.
2. WATER SUPPLY FROM ADJACENT WATER FILTER
3, REFER TO EQUIPMENT SHOP DRAWINGS FOR NOTES AND DETAILS.
EXISTING 1250 GAL GREASE TRAP, TO
REMAIN. CONNECT WITH NEW 3" GREASE
DRAIN AND PROVIDE 3" SANITARY DRAIN TO
EXISTING SANITARY LATERAL
CONNECT NEW 3" DRAIN TO EXISTING
SANITARY LATERAL VERIFY EXACT LOCATION
AND INCERT ELEVATION IN FIELD,
CONNECT TO EXISTING
STUB UP 4" SANITARY LINE
VERIFY IN FIELD
Fir%r%r
SCALE: 114 * =1' -0"
.'
•
!
air
0;
�•• r r
r
r
� �
Y
"
r
' '
rlrr.
W u w
v
d
r
• •
�
�• c��
V •
v
@uiY
r r u
•rr
o
06 G! •!•
•
! r,urr.,
air
�•• r r
r
r
� �
Y
"
r
' '
rlrr.
W u w
v
d
r
• •
�
�• c��
V •
v
@uiY
r r u
•rr
o
M
uJ
.::.
E
r-I
W
O
w
Q
O
.�
o ,.
CL
l: 4 :::} V
W V
1 W
•!
i
ELu
j Y
r u
w •
• u
r
J
J
r
y
r
!
!
• W
CL
LL
cli
Lo Lo
Q
-4
w
�
cn
c�
!
rWY
r!•r
J
Y •
[
uriy
•
r
6
!
i
Y
!
r
/
?
U)
u •
uuVV
• ,�•r
*
rU r
u
7rYY
r ! r
r 0 U41r /
W
0
w
i
U)
co
w
J
U
co
O
}
z
[
Of
O
LL
ow
zo
0
Z2
LL=
z�
wa
no
�U
Cnw
o=
z.2
Cw
F-z
ww
W0f
Do
n=
Ln2
-0
U
i
�_z
zw
LUO
to z
zo
0�
TU
F-_
�.(n
o_
W_
a.
0
U
fif
0
(L
w
w
w
r
0
F-
0
z
U)
U
J
J
ui
U
w
U
LL
maqueira
LU
CL
gine,ering Cr
O
consultants
INC.
GG9.5595
ueiraxem
U)
of
J
•
x r
4,. r..
R
A2 n
r
SEP i'' 2ofi
ROLANDO MAQUEIRA, PE
FLORIDA PROFESSIONAL ENGINEER # PE 55432
(drawing data
FLOOR PLAN
PLUMBING
ffproject number
11
[drawing scale
AsShown
[drawing date
September • 1
gphase . �7
i
Permit
sheet number .
f
,
V'f
M
N
M
r-I
o
M
E
r-I
W
O
>
o
Q
O
.�
o ,.
CL
o
Ln
,
ELu
O
0O
U
CL
M
cli
Lo Lo
Q
-4
�
cn
x r
4,. r..
R
A2 n
r
SEP i'' 2ofi
ROLANDO MAQUEIRA, PE
FLORIDA PROFESSIONAL ENGINEER # PE 55432
(drawing data
FLOOR PLAN
PLUMBING
ffproject number
11
[drawing scale
AsShown
[drawing date
September • 1
gphase . �7
i
Permit
sheet number .