Loading...
13-645-002N DEMOLITION U PARTIAL NORTH ELEVATION AA A 1 r_ A IA" 41 A" TOP OF BEAD, W-4" FIN. FLOOR ELEV$ _ 0' -0" EXISTING DEMOLITION NORTH ELEVATION SCALE: 1/4" = T -0" i s A s s s 4 D � s 18 1 1 18 1 1 1 1 1 DEMOLITION y CI C \/A T1nK1 2 DEMOLITION U&JIMM DEMOLITION EAST ELEVATION SCALE: 1/4" = T -0" PROJECT: _- RENS';DELING AND WINDOW RERLACEMENT TO THE RESIDENCE MRS. _ - -_ - . = SUE NICHOLS - -- -- - - -- - --- -6585 SW 69 AVENUE SOUTH MIAMI FL OWNER: SUE NICHOLS 6585 SW 69 AVENUE SOUTH MIAMI FL (305) 558 -4663 ►:`l"TowoI1110yr1J;Ia P. A. II 1� 6625 MIAMI LAM DRIVE MAN LADS SWE 238 MIAMI FLORIDA 33014 TEIJ✓PHONE (" 594 3961 EAGRENOT@BELLSOUTH.NW--- AR 0015411 AA 003254 DEMOLITION KEY NOTES lOREMOVE EXISTING HR WINDOW AND WD. BUCKS PREPARE OPENING TO RECEIVE NEW WINDOW (REFER TO WINDOW SCHEDULE) O REMOVE PENING TO RECEIVE SLIDING EW PAIR FRENCH DOORS BUCKS, PREPARE (REFER TO DOOR — SCHEDULE) REMOVE EXISTING DOOR AND WOOD BUCKS PREPARE OPENING 3 TO RECEIVE NEW DOOR (REFER TO DOOR SCHEDULE) REMOVE EXISTING MARBLE TUB AND ASSOCIATED PLUMBING/ 4 REMOVE OLD DRYWALL PREPARE FLOORS AND WALLS TO RECEIVE NEW SHOWER ENCLOUSURE (REFER TO NEW WORN TEMPORARLY CAP OFF PLUMBING LINES AT THIS POINT. REMOVE EXISTING MARBLE TOP AND WOOD CABINETS AND 5 SINK TEMPORARLY CAP OFF PLUMBING LINES AT THIS POINT 6 REMOVE EXISTNG TOILET REPLACE WITH NEW TOILET SAME LOCATION TEMPORARILY'CAP OFF PLUMBING LINES AT THIS POINT OREMOVE EXISTING DRYWALL CEILING AND LIGHTS TO UNDER CEILING PREPARE NEW CEILING TO RECEIVE DRYWALL 8OEXISTING COFFERED CEILING OPENING TO REMAIN REMOVE. EXISTING PLASTIC LAMINATES DIFUSERS AND SUPPORTING GRID AND LIGHT FIXTURES. PR. °_PARE EXISTING OPENING TO RECEIVE NEW LIGHTS REMOVE EXISTING DRYWALL AND STUD PARTITION �J I 10 RE qVE ICI SINK AND COUNTER TOP TEMPORARILY CAP 11 REMOVE EXISTING WALL MOUNTED CABINET AND DRAWERS CI ;,' OF SOUL H {e4lAt i 12 REMOVE EXISTING DOOR AND FRAME I "tel,,G DCp1 REMOVE EXISTING TUB AND SLIDER DOORS TEMPORARILY r3i1',LMNG SFCTIO44 13 CAP OFF ALL PLUMBING PREPARE SPACE TO RECEIVE NEW SHOWER 14 REMOVE EXISTING POCKET DOOR AND FRAME Avt20Q 15 REMOVE EXISTING BUILT —IN CABINET 16 EXISTING S" CONCRETE MASONRY WALL TO REMAIN 17 CAP OFF ALL PLUMBING TO ALL BATH FIXTURES AT THIS DEMOLITION LOCATIONS 18 REMOVE PORTION OF EXISTING 9" CONCRETE BLOCK WALL AS PER NEW WINDOW SIZE (REFER TO PLAN AND SCHEDULE FOR SIZES) 19 REMOVE DECORATIVE WOOD MOULDING AND ANCHOR REPAIR STUCCO AS NEEDED DATE : 11 -11-12 AS SHOWN JOB NO. 1210 DRAWN : LF.J CHECKED : E.J.A. 0' 6. 1' 2' 3' REVISIONS ❑ For Construction ❑ Review Set 11 Not for Construction Office Set 0 Bid Set Record Set All designs, details and drawings indicated and represented are for use on and In conjunction , with the specified project the designs and drawings are the property of the Architect and shall not be reproduced in whole or in part without the written permision of Emilio Jose Agrenot Architect, P.A. r y OF SOU-711 DESCRIPTION . DEMOLITION WORK ,.;;,� s• ^,;;�; EXTERIOR ELEVATIONS A�2ml