13-1254-004effRE ,4D FOOTING eC4 AEDULE
M141RK
SIzE
LxUJxTH IGKNESS
REINFORCEMENT
REMARKS
BOTTOM
TOP
SHORT BAR
LONG BAR
SHORT BAR
LONG BAR
WF -20
1' -8 "x12 °xcoNT.
" 4 e 48
2 #5
-
-
F -3
3'- O "x3'- O "xl2"
4 1S
4 "5
LL
z
p
8' CMU WALL W/ —
%a4V C/C IN
GROUTED CELLS,
09 LADDER TYPE
JT REINF. nv 16' C/C
EC6_0_RD ALL DIMENSIONS 4 SIZE OF OPENING W/ ARCH. PLANS
nROUND FLOOR 4 FOUNDATION FLAN
1/4" = 1' -0"
COLUMN SCHEDULE
MARK
SIZE
VERT /BASE PL
TIES /GAP PL
REMARKS
Cl
8 "x12"
4"5
"3 o8"
LL
0
LL
LEGEND:
EXISTING= CMU WALL TO REMAIN
1 " VERT., IN BLOCK CELL FILLED W/ CONC.
GROUT (SEE NOTE).
QNEW CONCRETE COLUMN. SEE SCHEDULE
IN THIS SHEET.
r- NEW CONCRETE SLAB
C.J. INDICATES SAW CUT JOINT SEE DTL. THIS SHEET
NEW FOOTING
BREAK FACE SHELL OF EXISTING BLOCK 4 SET
"6 BAR IN GROUT DRILL J" DIA. 6" HOLES IN
FOOTING 4 BEAM ABOV 4 SET 6" DOWEL IN
EPDXY. SEE DETAIL 1/S -1
��— CORE DRILL J" DIA. x4" HOLES 4
SET 03 X 1 " -4" LG= BAR IN EPDXY e12" C/C
ALL NEW TO EXIST. FOOTING
INTERSECTIONS DRILL
(2) 314'DIA x 6' HOLES
4 SET 2 05 FROM NEW FTG IN
EPDXr (TYP.)
• :E
:�.
BEND STEEL
AT T.B. TOP REINF.
'3 TIES, SPACED AS PER
}: COLUMN SCHEDULE
oil=
—I-N
Im
i
CONC. COL"
COL. DOWELS SAME SIZE
4 QTY AS VERT. REINF.
REINFORCING
DOWELS TO MATCH
COL. REINF.
CONC. FTG.
SEE SCHEDULE
T)`F. CONC. COL. i;PEINFOi'CINe DETAIL
3/4" = 1' -0"
FINISHED GRADE
1/4" SAWCUT JOINT
X 1 -1/2" DEEP
e ° a
WluF.
SEE PLAN
NOTE- SAW CUT JOINT NO LATER THAN 24 HOURS
AFTER PLACING CONCRETE.
VAPOR BARRIER
7�F. 5LA5 CONT4ROL JOINT
3/4"=11-011
DRILL 1/8" DIA. x 6"
BOTTOM OF DEEP AND FILL
EXISTING BEAM. � WITH EPDXY G=ROUT
TYP. EA. BAR
1 "6 DOWEL AT
CENTER LINE
OF EX16ITNG
BEAM ,x 3' -0" LG.
EXISTING
BLOCK W
1
1 "6 DOLUELS OF
Ill DRILL -1/8" DIA. x 6"
CENTERLINE - DEEP AND FILL
OF
CENTERLINE WITH EPDXY GROUT
BEAM x 3' -0" LG.
TYP. EA. BAR
TOP OF EXISTING FOOTING.
1 % IN BLOCK CELL FILLED
W/ 3,000 PSI PUMP MIX LEAVE ONE
FACE OF BLOCK OPEN
1 FILLED CELL DETAIL
1/2" = 1' -O"
" " "F. SEE PLAN S -1
C
� y
C
6 MIL. POLYTHYLENE
VAPOR BARRIER
W/ 6" MIN. TAPED AND
LAPPED JOINTS (Trj 1')
!�
T.E. 1 *5 CONT. DOU%ft, `SOtpr" a
WELDED WIRE MESH[!Y3(o' -DING Dtp
S7-i'\ t, r- I
T4C <ENED SLAB EDGE DETAIL up ". S¢�c --f
,r 1.
�,,jr�IVI ❑SCR_ G❑N.Z6LEZ
t NS}JI.TINg STRUCTURI-L`JpIGWEER
005D 546410I.A3 • /q 4 -
9Ll ' F 8 CF�N$)L N 914'1
HISTORY OF ORAWiNG IS,;UEG
DESCRIPTION DATE OF ISSUED
=-PROGRESS
F_�'PERIWT 1 -
�,CONSTRUCTIOi,J
REVISION BY
co
� N
z M o
z U U
Z � �
Q Q �
� N j
O
W W M
D vi LL
U w o
Lo
W Q M
co
L(� CO
O
U u)
O J
Q F_ Lu
------------
0
0 _ -
Go
t co
d
Q M
—
U7
ZU���
Owaw-
C�F =it>
JwzLo LL
LU =¢UNQ
IA t ^} J C)
cc
ti
DATE 09 -09 -13
SCALE AS NOTED
DRAWING J.S.
JOB GROUND FLOOR &
FOUNDATION PLAN
SHEET
S-1
OF 3 SHEETS
REVISION
DATE
LL
0
LL
z
p
N
W
J
LL
~
�a
<
3:
v
o
W
U
U
"°
z
N
w
Lu
U
p
..
(r
li
U)
T
2
Lo
co
0
0. /
co
� N
z M o
z U U
Z � �
Q Q �
� N j
O
W W M
D vi LL
U w o
Lo
W Q M
co
L(� CO
O
U u)
O J
Q F_ Lu
------------
0
0 _ -
Go
t co
d
Q M
—
U7
ZU���
Owaw-
C�F =it>
JwzLo LL
LU =¢UNQ
IA t ^} J C)
cc
ti
DATE 09 -09 -13
SCALE AS NOTED
DRAWING J.S.
JOB GROUND FLOOR &
FOUNDATION PLAN
SHEET
S-1
OF 3 SHEETS