Loading...
13-1254-004effRE ,4D FOOTING eC4 AEDULE M141RK SIzE LxUJxTH IGKNESS REINFORCEMENT REMARKS BOTTOM TOP SHORT BAR LONG BAR SHORT BAR LONG BAR WF -20 1' -8 "x12 °xcoNT. " 4 e 48 2 #5 - - F -3 3'- O "x3'- O "xl2" 4 1S 4 "5 LL z p 8' CMU WALL W/ — %a4V C/C IN GROUTED CELLS, 09 LADDER TYPE JT REINF. nv 16' C/C EC6_0_RD ALL DIMENSIONS 4 SIZE OF OPENING W/ ARCH. PLANS nROUND FLOOR 4 FOUNDATION FLAN 1/4" = 1' -0" COLUMN SCHEDULE MARK SIZE VERT /BASE PL TIES /GAP PL REMARKS Cl 8 "x12" 4"5 "3 o8" LL 0 LL LEGEND: EXISTING= CMU WALL TO REMAIN 1 " VERT., IN BLOCK CELL FILLED W/ CONC. GROUT (SEE NOTE). QNEW CONCRETE COLUMN. SEE SCHEDULE IN THIS SHEET. r- NEW CONCRETE SLAB C.J. INDICATES SAW CUT JOINT SEE DTL. THIS SHEET NEW FOOTING BREAK FACE SHELL OF EXISTING BLOCK 4 SET "6 BAR IN GROUT DRILL J" DIA. 6" HOLES IN FOOTING 4 BEAM ABOV 4 SET 6" DOWEL IN EPDXY. SEE DETAIL 1/S -1 ��— CORE DRILL J" DIA. x4" HOLES 4 SET 03 X 1 " -4" LG= BAR IN EPDXY e12" C/C ALL NEW TO EXIST. FOOTING INTERSECTIONS DRILL (2) 314'DIA x 6' HOLES 4 SET 2 05 FROM NEW FTG IN EPDXr (TYP.) • :E :�. BEND STEEL AT T.B. TOP REINF. '3 TIES, SPACED AS PER }: COLUMN SCHEDULE oil= —I-N Im i CONC. COL" COL. DOWELS SAME SIZE 4 QTY AS VERT. REINF. REINFORCING DOWELS TO MATCH COL. REINF. CONC. FTG. SEE SCHEDULE T)`F. CONC. COL. i;PEINFOi'CINe DETAIL 3/4" = 1' -0" FINISHED GRADE 1/4" SAWCUT JOINT X 1 -1/2" DEEP e ° a WluF. SEE PLAN NOTE- SAW CUT JOINT NO LATER THAN 24 HOURS AFTER PLACING CONCRETE. VAPOR BARRIER 7�F. 5LA5 CONT4ROL JOINT 3/4"=11-011 DRILL 1/8" DIA. x 6" BOTTOM OF DEEP AND FILL EXISTING BEAM. � WITH EPDXY G=ROUT TYP. EA. BAR 1 "6 DOWEL AT CENTER LINE OF EX16ITNG BEAM ,x 3' -0" LG. EXISTING BLOCK W 1 1 "6 DOLUELS OF Ill DRILL -1/8" DIA. x 6" CENTERLINE - DEEP AND FILL OF CENTERLINE WITH EPDXY GROUT BEAM x 3' -0" LG. TYP. EA. BAR TOP OF EXISTING FOOTING. 1 % IN BLOCK CELL FILLED W/ 3,000 PSI PUMP MIX LEAVE ONE FACE OF BLOCK OPEN 1 FILLED CELL DETAIL 1/2" = 1' -O" " " "F. SEE PLAN S -1 C � y C 6 MIL. POLYTHYLENE VAPOR BARRIER W/ 6" MIN. TAPED AND LAPPED JOINTS (Trj 1') !� T.E. 1 *5 CONT. DOU%ft, `SOtpr" a WELDED WIRE MESH[!Y3(o' -DING Dtp S7-i'\ t, r- I T4C <ENED SLAB EDGE DETAIL up ". S¢�c --f ,r 1. �,,jr�IVI ❑SCR_ G❑N.Z6LEZ t NS}JI.TINg STRUCTURI-L`JpIGWEER 005D 546410I.A3 • /q 4 - 9Ll ' F 8 CF�N$)L N 914'1 HISTORY OF ORAWiNG IS,;UEG DESCRIPTION DATE OF ISSUED =-PROGRESS F_�'PERIWT 1 - �,CONSTRUCTIOi,J REVISION BY co � N z M o z U U Z � � Q Q � � N j O W W M D vi LL U w o Lo W Q M co L(� CO O U u) O J Q F_ Lu ------------ 0 0 _ - Go t co d Q M — U7 ZU��� Owaw- C�F =it> JwzLo LL LU =¢UNQ IA t ^} J C) cc ti DATE 09 -09 -13 SCALE AS NOTED DRAWING J.S. JOB GROUND FLOOR & FOUNDATION PLAN SHEET S-1 OF 3 SHEETS REVISION DATE LL 0 LL z p N W J LL ~ �a < 3: v o W U U "° z N w Lu U p .. (r li U) T 2 Lo co 0 0. / co � N z M o z U U Z � � Q Q � � N j O W W M D vi LL U w o Lo W Q M co L(� CO O U u) O J Q F_ Lu ------------ 0 0 _ - Go t co d Q M — U7 ZU��� Owaw- C�F =it> JwzLo LL LU =¢UNQ IA t ^} J C) cc ti DATE 09 -09 -13 SCALE AS NOTED DRAWING J.S. JOB GROUND FLOOR & FOUNDATION PLAN SHEET S-1 OF 3 SHEETS