09-636-001GENERAL NOTES: 01. GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER TO DETERMINE EXACTLY WHAT SCOPE IS REQUIRED TO BE PERFROMED BY THE GENERAL CONTRACTOR AND WHAT SCOPE WILL BE HANDLED DIRECTLY BY THE OWNER. IT IS EXPECTED THAT THE GENERAL CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THE WORK OF ALL SUBCONTRACTORS WHETHER THEY BE CONTRACTED BY THE OWNER OR THE GENERAL CONTRACTOR. 02. ALL WORK SHALL COMPLY WITH THE REGULATIONS OF THE GOVERNMENTAL AUTHORITIES HAVING JURISDICTION. THE CONSTRUCTION DOCUMENTS SHALL BE SUPPLEMENTALTO ALL LAWS & CODES OF GOVERNMENTAL REGULATING BODIES RELATING TO BUILDINGS. ALLAPPUCABLE REQUIREMENTS SPECIFIED IN THESE REGULATIONS SHALL BE FOLLOWED AS THOUGH SPECIFICALLY NOTED IN THE CONSTRUCTION DOCUMENTS. HOWEVER, THIS SHOULD NOT BE CONSTRUED TO MEAN THATANY REQUIREMENTS SET FORTH IN THE CONSTRUCTION DOCUMENTS CAN BE MODIFIED BECAUSE THEYARE NOT SPECIFICALLY NOTED BY SUCH CODES. 03. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AND BE RESPONSIBLE FOR FIELD FIT AND QUALITY OF THE WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS CONCEALED BELOW GRADE, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING, TELEPHONE, COMMUNICATIONS ETC. NO ALLOWANCES SHALL BE MADE ON BEHALF OF THE CONTRACTOR FOR ANY ERROR OR NEGLECT ON HIS/HER PART. ALL CONTRACTORS TO FIELD VERIFY ALL DIMENSIONS, MEASUREMENTS AND ELEVATIONS AT THE SITE. THE CONTRACTOR IS TO NOTIFY THE ARCHITECT OR OWNER'S REPRESENTATIVE OF ANY DISCREPANCY BETWEEN DRAWINGS AND FIELD CONDITIONS BEFORE COMMENCING ANY WORK. ALL CONTRACTORS INCLUDING SUBCONTRACTORS SHALL EXAMINE THE SITE, BUILDING, ETC. INCLUDING ITS CONDITIONS BEFORE SUBMITTING THEIR BID(S). CONTRACTORS SHALL MAKE NO CLAIM FOR AND HAVE NO RIGHT TO ADDITIONAL PAYMENT, EXTENSION OF TIME OR ANY OTHER CONCESSION BECAUSE OF FAILURE TO VISIT THE SITE AND BUILDING TO ACQUAINT THEMSELVES WITH THE CONDITIONS OF /OR RELATING TO THE WORK. 04. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY IF HE OR SHE CANNOT COMPLY WITH ANY AND /OR ALL INCLUDED CONSTRUCTION DOCUMENTS. 05. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL USE DIMENSIONS SHOWN ON DRAWINGS AND ACTUAL FIELD MEASUREMENT. DISCREPANCIES SHALL BE NOTIFIED TO THE ARCHITECTAT ONCE BEFORE PROCEEDING WITH THE WORK, 06. WHERE THE TERM "APPROVED' OR "APPROVED EQUAL" IS USED IN THE CONSTRUCTION DOCUMENTS, IT SHAH BE UNDERSTOOD THAT THE REFERENCE IS MADE TO THE RULING AND JUDGMENT OF AND PROPOSED SUBSTITUTE SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND WRITTEN APPROVAL. 07. THE GENERAL CONTRACTOR SHALL COORDINATE THE LOCATIONS OF ALL DRAIN PIPES, DOORWAYS AND VENTILATION OPENINGS SO AS TO NOT INTERFERE WITH THE LOCATIONS OF THE ARCHITECTURAL FINISH ITEMS INDICATED ON THE DRAWINGS. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS. 08. THE CONTRACTOR SHALL INVESTIGATE AND VERIFY LOCATIONS OF STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING ELEMENTS, OR OTHER CONDITIONS EXISTING, PRIOR TO DRILLING OR CUTTING OF SLABS OR STRUCTURAL MEMBER. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS. 09. THE ARCHITECT SHALL NOT BE OBLIGATED TO ACT AS AN ARBITRATOR BETWEEN THE CONTRACTOR AND HIS SUBCONTRACTORS, OR BETWEEN SUBCONTRACTORS, DUE TO REAL OR ALLEGED ERROR IN THE ARRANGEMENT OF THE CONTENTS OF THE CONTRACT DOCUMENTS. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTORAND OWNER TO OBTAIN ALL REQUIRED PERMITS FOR CONSTRUCTION WITHIN THE GOVERNING JURISDICTION. 11. THE CHARACTER AND SCOPE OF THE WORK ARE ILLUSTRATED BY THE DRAWINGS LISTED. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND /OR REQUESTING ANY ADDITIONAL DETAIL DRAWINGS REQUIRED TO INTERPRETAND EXPLAIN THE CONSTRUCTION DOCUMENTS AND OTHER INFORMATION DEEMED NECESSARY TO PERFORM WORK. IT SHALL BE UNDERSTOOD THAT THIS ADDITIONAL DATA SHALL BE CONSIDERED AS FORMING A PART OF THESE NOTES AS THEY RELATE. 12, THE USE OF THE WORDS "SUPPLIED BY" OR 'PROVIDED', IN CONNECTION WITH ANY ITEM SPECIFIED IT IS INTENDED TO MEAN THAT SUCH ITEM SHALL BE FURNISHED TO THE CONTRACTOR AND INSTALLED BY THE CONTRACTOR (UNLESS OTHERWISE NOTED). CONTRACTOR IS TO BECOME AWARE OF SUCH ITEMS TO ENSURE PREPARATION IS PERFORMED TO CORRECTLY INSTALL AS REQUIRED. CONTRACTOR TO RECEIVE AND STORE ITEMS AS REQUIRED. 13, THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY AND SAFETY OF THE CONSTRUCTION SITE. CONTRACTOR SHALL COORDINATE WITH LOCAL AUTHORITIES TO ENSURE AN ADEQUATE LEVEL OF LIFE SAFETY IS MAINTAINED ATALL TIMES. 14. THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION OF PUBLIC AREAS AND SHALL BE RESPONSIBLE FOR KEEPING THESE AREAS CLEAN AND FREE OF MATERIALS AT ALL TIMES. 15. CONTRACTOR SHALL COORDINATE WITH OWNER FOR ACCESS AND REGULATIONS REGARDING REQUIRED PERMITS, HOURS OF WORK AND ALL OTHER RELEVANT REGULATIONS. 16. PRIOR TO COMMENCEMENT OF CONSTRUCTION THE GG SHALL FILE WITH THE OWNER CURRENT INSURANCE CERTIFICATIONS IN THE AMOUNTS REQUESTED BY THE OWNER FOR WORKMAN'S COMPENSATION, GENERAL LIABILITY, BODILY INJURY & PROPERTY DAMAGE. THE GC SHALL INDEMNIFY THE OWNER & THE ARCHITECT FOR AND ADDITIONAL COSTS, CLAIMS, SUITS & JUDGMENTS FOR PROPERTY DAMAGE OR PERSONAL INJURY ARISING OUT OF THE WORK OF THE GC, HIS AGENTS, EMPLOYEES AND SUBCONTRACTORS. 17. PRIOR TO THE PAYMENT OF THE FINAL INVOICE THE GC SHALL (A) CORRECTALL PUNCH LIST ITEMS (B) PROVIDE LIEN WAIVERS FROM ALL FIRST TIER SUBCONTRACTORS (C) PROVIDE ALL GOVERNMENTAL CERTIFICATES OF COMPLETION. 18. MECHANICAL, ELECTRICAL & PLUMBING CONTRACTORS SHALL FULLY COORDINATE ALL EQUIPMENT WITH THE OTHER TRADES. THESE CONTRACTORS SHALL BE RESPONSIBLE FOR THE FINAL HOOKUP OF ALL EQUIPMENT INCLUDING EQUIPMENT NOT FURNISHED BY THEM, BUT REQUIRING THEIR SERVICES. 19. NO EXTRA WORK OR CHANGE SHALL BE MADE WITHOUT PRIOR WRITTEN REQUEST & APPROVAL FROM THE OWNER & ARCHITECT. THE CHANGE ORDER SHALL OUTLINE ADDITIONAL COSTS, ADDITIONS TO THE SCHEDULE AND MATERIALS INVOLVED. 20. GC SHALL PROVIDE SAMPLES OF ALL FINISH MATERIALS, MILLWORK & COLORS TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION ON THE JOB & IN A TIMELY FASHION SO AS NOT TO DELAY THE PROGRESS OF THE WORK. 21. THE GENERAL CONTRACTOR SHALL PROVIDE ADDITIONAL STUDS, TEMPORARY BLOCKING AND FRAMING SUPPORTS IN PARTITIONS, AND IN CEILINGS FOR THE ANCHORING AND INSTALLATION OF ALL LIGHT FIXTURES OR OTHER CEILING MOUNTED INSTALLATIONS AS REQUIRED BY THE DOCUMENTS. 22. BIDDER MUST REVIEW ALL PLANS WITH THE ARCHITECT PRIOR TO BIDDING WORK. ARCHITECT SHALL ASSUME NO RESPONSIBILITY WHEN BIDDER HAS NOT VIEWED THE NATURE OF THE WORK. IF DOUBT EXISTS IN THE MIND OF THE BIDDER AS THE TRUE MEANING OF ANY PART OF THE CONTRACT DOCUMENTS, HE / SHE MUST REQUEST THE INFORMATION, AND / OR CLARIFICATION, IN WRITING, ARCHITECT OR ENGINEERS SHALL RESPOND TO ANY INQUIRY IN WRITING. 21 THE CONTRACTOR SHALL INCLUDE WITHIN THE BID COSTS OF ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, HOSTING, ADMINISTRATION, FIELD SUPERINTEND AND COORDINATION OFAH SUBCONTRACTORS AND ALSO OTHER CONTRACTORS OR VENDORS RETAINED BY THE OWNER, AS REQUIRED FOR THE COMPLETION OF THE WORK. 24. BID SHALL BE BASED ON WORK BEING PERFORMED DURING NORMAL WORKING HOURS. 25, THE CONTRACTOR SHALL PROTECT WORK OF OTHER TRADES SS THAT PRE - FINISH SURFACES, OR SURFACES TO BE FINISHED AT A LATER DATE ARE NOT MARRED. EACH CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND IS RESPONSIBLE FOR THE REPAIR OF SAID DAMAGE AT HIS OWN COST. 26. COMMENCEMENT OF WORK BY ONE TRADE OR SUBCONTRACTOR OVER THE EXISTING FINISHED WORK OF A PREVIOUS TRADE OR SUBCONTRACTOR SHALL CONSTITUTE ACCEPTANCE OF THAT PREVIOUS WORK BY THE NEW TRADE OR SUBCONTRACTOR. 27. ARCHITECTURAL DRAWINGS SHALL GOVERN OVER ENGINEERING DRAWINGS FOR LOCATIONS OF LIGHTING, ELECTRICAL, DATA AND TELEPHONE OUTLETS, AIR CONDITIONING, ETC. REFER TO ENGINEERING DRAWINGS FOR MINIMUM CODE COMPLIANCE. 29. UPON COMPLETION OF THE WORK, THE CONTRACTOR MUST SUBMIT AS -BUILT DRAWINGS FOR ALL TRADES TO THE BUILDING IN ORDER TO RECEIVE THEIR FINAL PAYMENTS, UPON COMPLETION OF WORK, IT SHALL BE LEFT PROFESSIONALLY CLEANED, FREE OF DIRT, DEFECTS, STAINS, SOILING, MOISTURE. ALL CLEANING AGENTS SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS AND USED SO AS NOT TO DAMAGE THE INSTALLED MATERIAL 30. ALL DRAWINGS AND SPECIFICATIONS ARE PART OF THE CONTRACT DOCUMENTS. THE COMPLETE SCOPE OF WORK CAN ONLY BE DETERMINED BY USING ALL OF THE CONTRACT DOCUMENTS TOGETHER. FAILURE BY THE GENERAL CONTRACTOR TO USE ALL OF THE DOCUMENTS, AND TO CROSS - REFERENCE ONE ANOTHER, SHALL NOT BE CAUSE FOR ADDITIONAL COSTS. COORDINATION OF THE WORK, AND OF THE SUBCONTRACTORS IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. SUPPLEMENTAL DETAIL DRAWINGS WILL BE FURNISHED DURING CONSTRUCTION AS PART OF THE FIELD ORDER PROCESS. THESE SK DRAWINGS SHALL CARRY THE SAME STRENGTH AS THE ORIGINAL CONTRACT DOCUMENTS. THE DRAWINGS (ELEVATIONS, FLOOR PLANS AND DESIGN DETAILS) AND SPECIFICATIONS ARE AN OUTLINE OF THE CRITERIA AND PERFORMANCE REQUIREMENTS OF THE WORK. THE REQUIREMENTS INDICATED BY THE DETAILS ARE INTENDED TO ESTABLISH BASIC DIMENSIONS, SITE LINES AND PROFILES. WITHIN THESE PARAMETERS, THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND ENGINEERING OF ANY SYSTEMS, INCLUDING WHATEVER MODIFICATIONS AND ADDITIONS MAY BE REQUIRED TO MEET THE SPECIFIED REQUIREMENTS AND MAINTAIN THE VISUAL DESIGN CONCEPT OF THE ENTIRE PROJECT. NOTE: A. PLANS ARE DIMENSIONED TO FINISH, U.O.N. B. INTERIOR ELEVATIONS ARE DIMENSIONED TO FINISH, U.O.N. C. DRAWINGS ARE NOT TO BE SCALED. DRAWINGS ARE USED TO SHOW RELATIONSHIPS ONLY. D. FEATURES NOTED ALIGN OR INDICATED IN ALIGNMENT SHALL BE FINISHED FLUSH AND SMOOTH, LEGAL DESCRIPTION LOT 1, BLOCK 2, OF MERION PAR MANOR, RECORDED IN THE PLAT THERE OF, AS RECORDED IN PLAT BOOK 60, PAGE 42, OF THE PUBLIC RECORDS OF MIAMI -DADE COUNTY, SQ. FOOTAGE DATA NET LOTAREA 9,942 SQ. FT. EXISTING A/C SPACE 1,810.6 SQ. FT, EXISTING COVERED ENTRY 47.2 SQ. FT. EXISTING GARAGE 342.3 SQ. FT. PROPOSED COVERED TERRACE 215.1 SQ. FT. TOTAL UNDER ROOF 2,415.2 SQ, FT. PROPOSED LOT COVERAGE 24.3% SCOPE OF WORK: 1. REMOVE EXISTING ALUMINUM / SCREEN ENCLOSURE AT REAR OF RESIDENCE. PROVIDE NEW COVERED TERRACE AS INDICATED. 2. REMOVE EXISTING FLAT ROOF AT EXISTING FAMILY ROOM, AND PROVIDE N EW PRE -FAB WOOD ROOF TRUSS SYSTEM AS SHOWN. W Z W Q Lo co C0 L11 _ 0 THERE ARE NO PERTINENT FEATURES ONADJACENT PROPERTIES AND ACROSS THE STREET THAT MAY AFFECT THE SYSTEM INSTALLATION. (PLUMBING CONTRACTOR SHALLVERIFY IN FIELD) Ilim Site Plan SCALE, 1 " _ - 19-0" Awo T MAIN 9 No U.S. Stru sturas, Inc. Stric�tural- engineers 4444 SW 71st AVENUE, SUITE 103 MIAMI, FLORIDA 33155 ^ 305.665.4555 FAX 305.665.5522 -- info@usstructuresinc.com CA 8439 x w W W Z w 0 0 U) C'7 > w F=-- Lu Z ro W Lu 0 C) W U- U) < 3: --Z� 0 < c�0� ~ W q) J Lo Q ` C.0 Q REVISIONS: EAL-f� •� �wer "fss.4.ma �'••���. jo STRUCTURA6�3E FL P.E. #54891 DRAWN GM CHECKED JAT DATE 03.04.09 SCALE As Indicated JOEL NO. SHEET A -1 OF SHEETS