Loading...
08-1134-009■ v F RE �'I t ® RELOCATED EXISTING SILVER RECOVERY UNIT, (HALLMARK 1000) MAINTAIN THE EXISTING � I CONFIGURATION OF THE CONNECTIONS, AND ALSO THE EXISTING ACCESSIBLE SAMPG PORT IS TO REMAIN. ° —I p 00 L �• O ` f Q i i 2 I 5K y 2 SF QCESSOR c x I I z G I t LEI i ( PARTIAL PLUMBING PLAN F'--1 SCALE: 1/8" = 1'-0° EXISTING BRANCH IAILNILLL CONNECTION FOR SILVER --- EYEWASH RE: PLUMBING RECOVER UNIT SCHEDULE EXISTING RECEPTACLE DQSTING JUNCTION BOX FOR SILVER RECOVERY FOR INSTANTANEOUS SYSTEM RE: ELEC WATER HEATER RE: ELECT NEW INSTANTANEOUS WATER HEATER RE: PLUMBING FAUCET FLOW SCHEDULE CONTROL `L' EXISTING COLD WATER SUPPLY, CONNECT TO NEW HOT OUTLET COLD SINK AND INSTANTANEOUS 3l &' COPPER WATER HEATER COLD INLET MAIN TUBING oll 1, NEW INSTANTANEOUS WATER HEATER 1/2' THREE WAY RELOCATED EXISTING SILVER NECTION HOSES FROM HOT RECOVERY UNIT, HALLMARK 1 PHOTO PROCESSOR COLD NOTE M CCE LE : EFFLUENT TREATED SILVER BEARING WASTEWATER EXISTING J -BOX SAMPLING PORT AT EFFLUENT FROM SILVER RECOVERY UNIT SHALL MEET MIAMI -DADE o PIPE FOR INSPECTIONS AND SANITARY SEWER STANDARDS (PH 5.5.5 AND SILVER ONITORIN 0.6MGA MAXIMUM) 3 INSTANTANEOUS WATER HEATER 2 QTC LAB DETAIL P -1 SCALE: NOT TO SCALE I P -� SCALE: NOT TO SCALE I ctS N I ao rn i IS c:! N Q I N y x CL tl v E c, Ii , 1. GENERAL 1 TES ARE APPLICABLE TO ALL PLUMBING i . DR 2. THE WORK X r r IN STRICT CONFORM17Y WITH BASE • / r 1 r EDITION OF HE PREVAILING LOCAL PLUMBING 1 l O i i i OF /+ BETWEEN THE ONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE STRINGENT STANDARD SHALL APPLY. - - - - 3. ALL PLUMBING ,• SHALL COORDINATED OTHER TRADES i• PROCEEDING i • r r ,. 1 ,/ 4. NO 5. NO PIPING SHALL RUN EXPOSED N SALES / • FINISHED 6. PLUMBING CONTRACTOR SHALL BE RESPONSIBI E FOR OBTAINING a NECESSARY PERMITS AND FOR PAYING RELATED IRS. 8. PROVIDE ACCESS PANELS ON ALL INACCESSIBLE VALVES AND CLEANOUTS. t-CCESS PANELS SHALL BE PROVIDED BY GENERAL CONTRACTOR. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THOR LOCATION. MOUNT SHUT-OFF VALVES NO HIGHER 1 9. ALL WORK SHALL BE PROPERLY TESTED, BALANCED AND CLEANED. PROVIDE A ONE YEAR WARRANTY FROM DATE OF i ON ALL PARTS AND LABOR. 1 FOLLOW PDI STANDARDS FOR WATER HAMMER ARRESTORS. 11. ALL FIXTURES TO BE SUPPUED & INSTALLED BY PLUM81NG CONTRACTOR, EYCEPT PHOTO-LAB SINK: CVS SUPPLIES & PLUMBING CONTRACTOR INSTALLS." lz TRAP SEAL PRIMERS ARE TO BE PROVIDED AT NO ADDITIONAL COST 1 OW4ER IF REQUIRED BY LOCAL 1 it OFFICIALS. FIXTURE PLUMBING MANUFACTURER REMARKS AND SPECIFICATIOINS SINK & FAUCET FURNISHED BYO. y .. 1 r• r• .r rrr r ,r •.rr .r r • • INSTALLED BY PLUMBER 1 : `1 ! #G1805, / MOUNTED '1 FLOW. SWIVEL, RIGHT HAND EYEWASH MILLWORK INSTALLED •�: • * 1: r• �_ r r rrr r r ` c w A i 1 I ')EAL: IL Jose Gordillo AR0013760 DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE,DIRECTIQN OF A LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY' FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. phar acy TOTAL #' '' 13,865 SF REVISIONS: • 0: • PER DERM COMMENTS REVISED PROJECT LAYOUT COORD. A. } • PROJECT RRW NV- D- DATE: : AUG 2008 DRAWING PLUMBING PLAN SHEET NUMBER: COMMENTS: TAKE 1