Loading...
13-1219R-004Y2" PREMOLDED FILLER JOINT 1-1/2"(CLR.) T. 0. S. (TYP.) x x — x 3"(CLR.) (TYP.) 3"(CLR.) (TYP.) 2'-6" (MIN.) LAP. SECTION (TYP.)l SCALE 3/4" NEW 6x6 STEEL COLUMN WITH CONCRETE GROUT FILLED. 4" CONCRETE SLAB I I I . — 12"xi 2" PLATE WITH 4-5/8" � ENCASE COL, AND BASE PLATE I HEAD ANCHOR BOLT IN PRE-READ DRIL IN CONCRETE 3" MIN. COVER,------- - :v CONRETE JA 4'-0"x4'-0"x 18" DEPTH CONC. 4 FTG W/ 6#5 E.W. TOP & BOTT Q" 4 EXISTING FOOTING DRILL AND INSTALL REINF. W/EPDXY INJECTION @) MID DEPTH SECTION THRU STEEL COLUMN_ SCALE 3/4" FOOTING SCHEDULE f'C=3000 psi ---I F -3 TOP BASE REINFORCEMENT F- MARK SIDE OF WINDOWS OVER EXISTING REMARKS BOTTOM TOP YOPENING. ELEV. W x L x D 0 L- — SCHEDULE u 0 0 8 "x 8" B WF-1 MATCH 16" x CONT. x 12" (2)-#5 CONT. CO FTG. SCHEDULE 11'-5" EXIST. CD > L THRU -Y4"O HOLE F-2 SEE � 4'-O"x4'-O"xl8" (6)-#5 E.W. (6)-#5 E.W. C0 3/S-1 3 -2 F I F-3 < 3'-O"x3'-O"x12" (4)-#5 E.W. 0 6) In L I I l I (a) F-4 @) 3'-6"x3'-6"x24" (6)-#5 E.W. -,z § 8"x 12" CONCRETE 0 CL LO SCALE 3/4" 48db LAP (MIN.) LONGITUDINAL (TYP. TO ALL REINFORCING (TOP & BARS CORNERS1 BOTTOM) (TYPICAL) V) -j [If U-i 0- 0 0 < 1-- u 11� U) >- � 00 PROVIDE STD. HOOK ON CO INSIDE BEAM REINF. WALL FOOTING (SEE SCHEDULE) PLAN AT CORNER FTNG. REINF. DEVELOPMENT DETAIL N.T.S. NEW 4" CONC. SLAB ON GRADE REINF. W/ 6x6-W1.4xW1.4 W.W.F. ON COMPACTED FILL. BROOM FINISH I - I x— x— x- YCLR 8"x8" THICKENED (TYP.) EDGE W/ 1-#5 n CONT. E S 4 TYPICAL THICKENED EDGE SECTION A3 mk – 0'– 4 1 /2 F.F.E. CENTER COL. NEW 4" CONC. SLAB • GRADE REINF. W/ 6x6-W1.4xW1.4 W.W.F. ON COMPACTED FILL HSS 4"X4"XY4" 8"X8" THICKENED EDGE (TE-1) W/ 1-#5 BOTTOM 3" CONC. ENCASEMENT ALL AROUND (SECOND POUR) m if x— x— x— x— ---I F -3 FTG. & TIE BM. ON EA. c� F- rA IQ SIDE OF WINDOWS OVER EXISTING NEW CONC. COLUMN A2 GRADE YOPENING. 3" lift 0 L- — SCHEDULE u 0 0 8 "x 8" B #5x16" LONG. DOWEL E �EDGE--���� ��l #5 �CONT . CO FTG. SCHEDULE 11'-5" CD > L THRU -Y4"O HOLE D F 0 1j C0 Cc) 3 -2 F I ::D < 0 0 6) In L I I l ip/ (a) @) 0 Z�: -,z § 8"x 12" CONCRETE 0 CL LO COLUMN 6 0 U-J E —0 cn I II C) N (D CL 1-- 0- V) 3"CLR Elf (TYP.) 0 SEE SCHEDULE CONCRETE FOOTING (SEE SCHEDULE) TYPICAL SECTION THRU 4"x4" STEEL COLUMN )A SCALE 3/4" I 2'-5" A3 HSS 4"X4"X)/4" X2" PREMOLDED FILLER JOINT /M 1,201 ATION JOINT nFTAII -I ITI ----------- WHERE NEW SLAB INTERSECTS EXISTING. DRILL AND DOWEL #4x30" LONG. 0 24"O.C. WITH EPDXY INJECTION 6- INTO EXIST. CONC. SLAB AT MID DEPTH, (TYP.) ---I F -3 FTG. & TIE BM. ON EA. c� F- rA IQ SIDE OF WINDOWS OVER NEW CONC. COLUMN A2 0") YOPENING. FOOTING, SEE FTG. lift 0 L- — SCHEDULE u 0 0 8 "x 8" B CONC. FOOTING, SEE E �EDGE--���� ��l #5 �CONT . CO FTG. SCHEDULE 11'-5" CD > L D F 0 1j C0 Cc) 3 -2 F I ::D < 0 0 6) In L 0 (a) @) 0 Z�: -,z § 8"x 12" CONCRETE 0 CL LO COLUMN co U-J E —0 NEW 4"x4" STEEL COLUMN. I II C) N (D CL 1-- 0- WHERE NEW SLAB INTERSECTS EXISTING. DRILL AND DOWEL #4x30" LONG. 0 24"O.C. WITH EPDXY INJECTION 6- INTO EXIST. CONC. SLAB AT MID DEPTH, (TYP.) z rn N.T.S. 1^1 A& 5 4/ 03-24-2014 m 14 ,AL 06-21-20 DJ uj ---I F -3 0 c� F- rA IQ I I M(D NEW CONC. COLUMN A2 0") FOOTING, SEE FTG. lift 0 L- — SCHEDULE u 0 0 8 "x 8" B < E �EDGE--���� ��l #5 �CONT . CO 11'-5" z rn N.T.S. 1^1 A& 5 4/ 03-24-2014 m 14 ,AL 06-21-20 DJ uj < °- 0 c� IJ- 0 0") -j ILL lift 0 c\j u 0 0 CD CO < E CO 0 CD > D 0 0 C0 Cc) c� E ::D < 0 0 6) In c\j 0 (a) @) 0 Z�: -,z § Ir 0 CL LO co U-J E —0 Q. C) N (D CL 1-- 0- rr < °- 0 IJ- 0 0 -j ILL 0 u 0 < < V) D 0 0 C0 Cc) ::D < 0 0 u Lij U) 0 0- Q0 0 § Ir cf) CL c\j DRAWN R. L. CHECKED J.M. DATE 10-29-13 SCALE AS SHOWN JOB No. SHEET S.1 OF 4 SHEETS