09-349-010ff-J., 1 -111 If 1.1 : JA��
SCALE: 3/8" = V -0"
GENERAL PLUMBING NOTES:
ALL NOTES, DETAILS AND REFERENCES HAVE BEEN
PREPARED IN COMPLIANCE WITH THE NEW FBC -2001
1. A. SCOPE OF WORK:
THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY ON THE
DRAWING SPECIFIED HERE IN AND /OR AS NEEDED FOR A COMPLETE
SYSTEM. INCLUDING BUT NOT NECESSARILY LIMITED TO:
I. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS
2. SANITARY DRAIN AND VENT SYSTEM (N /A)
3. PLUMBING FIXTURES AND TRIM
4. AIR CONDITIONING CONDENSE DRAINS
5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER
6. PIPING INSULATION
1. SUPPORTS AND HANGERS
B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE
WITH THE LATEST EDITION OF THE FLORIDA BUILDING CODE,
PLUMBL ING. LOCAL ORDINANCES AND IN COMPLIANCE WITH THE
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
AND HRS. REGULATIONS IN THE EVENT OF CONFLICT BETWEEN ANY
CODE OR REGULATIONS. THE MORE STRINGENT REQUIREMENTS WILL
GOVERN.
2. CONTRACTOR TO VERIFY AT SITE THE LOCATION ELEVATION AND
SIZE OF ALL EXISTING LINES FOR CONNECTION BEFORE INSTALLATION
OF ANY PIPING.
3. UNDERGROUND METAL PIPING SHALL BE PROTECTED WITH A COAT
OF BITUMINOUS COMPOUND BEFORE COVERING, 51TUMASTIC OR
EQUAL.
4. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER
WITH AIR CHAMBERS OR SHOCK ABSORBERS AS INDICATED ON
PLANS.
5. ALL FLOOR DRAINS TO HAVE TRAP PRIMERS '/' LINE FROM THE
NEAREST PLUMBING FIXTURE.
6. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH APPROVED
MATERIALS SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL
BE FREE FROM DEFECTS AND CONCEALED FOULING SURFACES. ALL
FIXTURE TRIM TO BE CHROME PLATED. FIXTURES SHALL BE PROVIDE
WITH SUPPORTS, HANGERS, ETC.
1. WASTE LINES TO SLOPE 1/8 FT. UNLESS OTHERWISE NOTED.
8. VENT LINES TO EXTEND S' MIN. A50VE ROOF AND FLASH WITH
LEAD.
S. WATER PIPE BELLOW GROUND SHALL BE COPPER TYPE. ABOVE
GROUND TO BE COPPER TYPE.
10. PIPING INSULATION:
A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT
PROPER INTERVALS ACCORDING WITH CODE.
B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH
FOUNDATION. SLA58 OR MASONRY WALLS. CAULKS OPENINGS BETWEEN
PIPE AND SLEEVES.
C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR
CEILINGS PROVIDE ESCUTCHEONS FIRMLY SECURED TO THE PIPES
AND OF SUFFICIENT OUTSIDE DIAMETER TO COVER THE SLEEVED
OPENING FOR THE PIPES. PROVIDE CHROMIUM PLATED ESCUTCHEONS
ON BATHROOM.
11. INSPECTIONS AND TESTS
A. CONTRACTORS SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS
TO THE AUTHORITIES HAVING JURISDICTION. AS THE WORK PROGRESS
ALL SYSTEM SHALL BE TESTED BY CODE
AND / OR LOCAL REGULATIONS.
5. DRAINAGE PIPING BEFORE INSTALLATION OF ANY DRAINS. THE END
OF SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH WATER
TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTIONS IS
MADE BY AN OWNER REPRESENTATIVE.
12. STERILIZE ALL WATER LINES WITH A° MIXTURE OF 2 POUNDS OF
CHLORINATED LIMED TO 1000 GALLONS OF -WATER (50PPM OF
AVAILABLE CHORINE). RETAIN MIXTURES IN PIPES 24 HOURS AND
FLOSS THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN
SERVICE.
13. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY
AND ANY WASTE PIPING AT EVERT CHANGE OF DIRECTION,
AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS AND
SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE.
14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE
GIVEN AN IN- SERVICE TEST
AFTER COMPLETION OF THE INSTALLATION.
15. 604.9 THERMAL CONTINUITY.
WHERE A DUCT LINER HAS BEEN INTERRUPTED, A DUCT COVERING
OF EQUAL THERMAL PERFORMANCE SHALL BE INSTALLED.
NOTE: ---
AI.L COLD AND HOT WATER OUTLETS ARE
IN I!1'0 PIPE EXCEPT AS INDICATED
ON PLANS.
LEGEND:
HWN Hw M —
COLD WATER
HOT WATER
SEWER LINE
LL
c
aI
qe C%4�
IT— W a ■-
Z F 05
W a
ENID r4%
J- a�
=r
Qa ti
LO
T_
W M
Uj W M
Z F- LL"
0�=
Ch
Q � �
J U _
0 ti
M
CU U)
These drawings and the designs here
ilustrated are 4m sole property of
Afredo Julien and may not be
reproduced in whale or in part without
evfm
I
JOB NUMBER
08018.
R E V I S 1 0 N S
F I L E
PLOT:
100%
DRAWN:
LID
CHECKED:
AMAID
D A T E :
10/24/07
JSHEET INDEX
SANITARY
PLAN
SHEET NUMBER
P =2
1 OF 2