Loading...
09-349-010ff-J., 1 -111 If 1.1 : JA�� SCALE: 3/8" = V -0" GENERAL PLUMBING NOTES: ALL NOTES, DETAILS AND REFERENCES HAVE BEEN PREPARED IN COMPLIANCE WITH THE NEW FBC -2001 1. A. SCOPE OF WORK: THE WORK SHALL INCLUDE ALL PLUMBING NECESSARY ON THE DRAWING SPECIFIED HERE IN AND /OR AS NEEDED FOR A COMPLETE SYSTEM. INCLUDING BUT NOT NECESSARILY LIMITED TO: I. DOMESTIC COLD AND HOT WATER PIPING SYSTEMS 2. SANITARY DRAIN AND VENT SYSTEM (N /A) 3. PLUMBING FIXTURES AND TRIM 4. AIR CONDITIONING CONDENSE DRAINS 5. PRESSURE AND TEMPERATURE RELIEF FROM WATER HEATER 6. PIPING INSULATION 1. SUPPORTS AND HANGERS B. ALL PLUMBING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE FLORIDA BUILDING CODE, PLUMBL ING. LOCAL ORDINANCES AND IN COMPLIANCE WITH THE FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION AND HRS. REGULATIONS IN THE EVENT OF CONFLICT BETWEEN ANY CODE OR REGULATIONS. THE MORE STRINGENT REQUIREMENTS WILL GOVERN. 2. CONTRACTOR TO VERIFY AT SITE THE LOCATION ELEVATION AND SIZE OF ALL EXISTING LINES FOR CONNECTION BEFORE INSTALLATION OF ANY PIPING. 3. UNDERGROUND METAL PIPING SHALL BE PROTECTED WITH A COAT OF BITUMINOUS COMPOUND BEFORE COVERING, 51TUMASTIC OR EQUAL. 4. ALL FIXTURES SHALL BE PROTECTED AGAINST WATER HAMMER WITH AIR CHAMBERS OR SHOCK ABSORBERS AS INDICATED ON PLANS. 5. ALL FLOOR DRAINS TO HAVE TRAP PRIMERS '/' LINE FROM THE NEAREST PLUMBING FIXTURE. 6. PLUMBING FIXTURES SHALL BE CONSTRUCTED WITH APPROVED MATERIALS SHALL HAVE SMOOTH IMPERVIOUS SURFACES AND SHALL BE FREE FROM DEFECTS AND CONCEALED FOULING SURFACES. ALL FIXTURE TRIM TO BE CHROME PLATED. FIXTURES SHALL BE PROVIDE WITH SUPPORTS, HANGERS, ETC. 1. WASTE LINES TO SLOPE 1/8 FT. UNLESS OTHERWISE NOTED. 8. VENT LINES TO EXTEND S' MIN. A50VE ROOF AND FLASH WITH LEAD. S. WATER PIPE BELLOW GROUND SHALL BE COPPER TYPE. ABOVE GROUND TO BE COPPER TYPE. 10. PIPING INSULATION: A. SUPPORT ALL PIPE FROM SOUND PORTIONS OF STRUCTURE AND AT PROPER INTERVALS ACCORDING WITH CODE. B. PROVIDE SLEEVES FOR ALL PIPING PASSING THROUGH FOUNDATION. SLA58 OR MASONRY WALLS. CAULKS OPENINGS BETWEEN PIPE AND SLEEVES. C. WHERE EXPOSED PIPES PASS THROUGH FLOORS, WALLS, OR CEILINGS PROVIDE ESCUTCHEONS FIRMLY SECURED TO THE PIPES AND OF SUFFICIENT OUTSIDE DIAMETER TO COVER THE SLEEVED OPENING FOR THE PIPES. PROVIDE CHROMIUM PLATED ESCUTCHEONS ON BATHROOM. 11. INSPECTIONS AND TESTS A. CONTRACTORS SHALL BE RESPONSIBLE TO ASK FOR INSPECTIONS TO THE AUTHORITIES HAVING JURISDICTION. AS THE WORK PROGRESS ALL SYSTEM SHALL BE TESTED BY CODE AND / OR LOCAL REGULATIONS. 5. DRAINAGE PIPING BEFORE INSTALLATION OF ANY DRAINS. THE END OF SYSTEMS SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTIONS IS MADE BY AN OWNER REPRESENTATIVE. 12. STERILIZE ALL WATER LINES WITH A° MIXTURE OF 2 POUNDS OF CHLORINATED LIMED TO 1000 GALLONS OF -WATER (50PPM OF AVAILABLE CHORINE). RETAIN MIXTURES IN PIPES 24 HOURS AND FLOSS THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 13. PROVIDE FULLY ACCESSIBLE CLEAN OUTS ON SANITARY AND ANY WASTE PIPING AT EVERT CHANGE OF DIRECTION, AND AT BOTTOM OF STACKS. CLEAN OUT LOCATIONS AND SIZES ON HORIZONTAL LINES SHALL BE ACCORDING TO CODE. 14. COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15. 604.9 THERMAL CONTINUITY. WHERE A DUCT LINER HAS BEEN INTERRUPTED, A DUCT COVERING OF EQUAL THERMAL PERFORMANCE SHALL BE INSTALLED. NOTE: --- AI.L COLD AND HOT WATER OUTLETS ARE IN I!1'0 PIPE EXCEPT AS INDICATED ON PLANS. LEGEND: HWN Hw M — COLD WATER HOT WATER SEWER LINE LL c aI qe C%4� IT— W a ■- Z F 05 W a ENID r4% J- a� =r Qa ti LO T_ W M Uj W M Z F- LL" 0�= Ch Q � � J U _ 0 ti M CU U) These drawings and the designs here ilustrated are 4m sole property of Afredo Julien and may not be reproduced in whale or in part without evfm I JOB NUMBER 08018. R E V I S 1 0 N S F I L E PLOT: 100% DRAWN: LID CHECKED: AMAID D A T E : 10/24/07 JSHEET INDEX SANITARY PLAN SHEET NUMBER P =2 1 OF 2