Loading...
11-626-018Zone Sizing Summary _AHU----- Z umn ry for 3 Project Name: DORAL IMAGING INSTITUTE Prepared by: JWCONSULTING. Sizing Calculation information Zone and Space Sizing Method: Zone CFM —_ — -___—Peak zone sensible load Space CFM __—_Coincident space loads Zone Sizing Data - ----- Calculation Months Sizing Data __ Maximum Design ! Minimum Zone 1 Zone Terminal Sizing Data No Zone Terminal Sizing Data required for this system Space Loads and Airflows _-Cooling Time Zone Name Sensible of S ace Name Mult MBH Load Zone 1 _i3 ____7 23 It Oct 1400, EXIST. AH U-3 7_1L_ —.—Jan to Dec --- __Calculated Time Maximum I Ing Ce - Heating I Air I Air Oct 1400_ 8.1 Sensible i Flow Flow Zone Name (MOH �_�4 CFM 1rplifil 23.11 1071 1071 Zone 1 Zone Terminal Sizing Data No Zone Terminal Sizing Data required for this system Space Loads and Airflows _-Cooling Time Zone Name Sensible of S ace Name Mult MBH Load Zone 1 _i3 ____7 23 It Oct 1400, EXIST. AH U-3 7_1L_ —.—Jan to Dec --- __Calculated Time Maximum I OT I Heating I Peaks, Loadi Ml� Load nBH I Oct 1400_ 8.1 Air Heating Flow Load 10711 8.1 06/15/11 07:27 AM Page I Carrier Hourly Analysis Program v4.04