11-626-018Zone Sizing Summary _AHU-----
Z umn ry for 3
Project Name: DORAL IMAGING INSTITUTE
Prepared by: JWCONSULTING.
Sizing Calculation information
Zone and Space Sizing Method:
Zone CFM —_ — -___—Peak zone sensible load
Space CFM __—_Coincident space loads
Zone Sizing Data - -----
Calculation Months
Sizing Data __
Maximum Design ! Minimum
Zone 1
Zone Terminal Sizing Data
No Zone Terminal Sizing Data required for this system
Space Loads and Airflows
_-Cooling Time
Zone Name Sensible of
S ace Name
Mult MBH Load
Zone 1 _i3
____7 23 It Oct 1400,
EXIST. AH U-3 7_1L_
—.—Jan to Dec
---
__Calculated
Time
Maximum I
Ing
Ce -
Heating I
Air
I
Air
Oct 1400_
8.1
Sensible
i
Flow
Flow
Zone Name
(MOH �_�4
CFM
1rplifil
23.11
1071
1071
Zone 1
Zone Terminal Sizing Data
No Zone Terminal Sizing Data required for this system
Space Loads and Airflows
_-Cooling Time
Zone Name Sensible of
S ace Name
Mult MBH Load
Zone 1 _i3
____7 23 It Oct 1400,
EXIST. AH U-3 7_1L_
—.—Jan to Dec
---
__Calculated
Time
Maximum I
OT I
Heating I
Peaks,
Loadi
Ml�
Load nBH I
Oct 1400_
8.1
Air Heating
Flow Load
10711 8.1
06/15/11
07:27 AM
Page I
Carrier Hourly Analysis Program v4.04