11-626-012Zone Sizing Summary for-AKU-1
Project Name: DORAL IMAGING INSTITUTE
Prepared by: JMM CONSULTING
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM _.. -__-_.—_Peak zone sensible load
Space CFM Coincident space loads
7— Si—n Data
Calculation Months
Sizing Data __
Zone Terminal Sizing Data
No Zone Terminal Sizing Data required for this system
Space Loads and Airflows
Zone
S
�'Zone
- E
Maximum
Design I
Minimum
Name I
pAce Name
Time
Maximum
of Flow
Load _JPFMI_
Load
(MMH)
Cooling
Sensible
Air
Flow
Air,
Flow
Nov 1400 1230
of
Peak
Heating
Load
�Zone Name
(MAff1
(CFM)
(CFM)
Load
FZ—One--l-
26.x.
1 ?�
123
Nov 1400 6•E
Zone Terminal Sizing Data
No Zone Terminal Sizing Data required for this system
Space Loads and Airflows
Zone
S
�'Zone
- E
Carrier —Hourly 'Analysis —Program -v4.04
to Dec
Calculated
06/15/11
07:27 AM
Page 2
Cooling
Time, Air
Heating
Name I
pAce Name
'.Mult
Sensible
of Flow
Load _JPFMI_
Load
(MMH)
XIST AHU-1
26.6
Nov 1400 1230
6.9
Carrier —Hourly 'Analysis —Program -v4.04
to Dec
Calculated
06/15/11
07:27 AM
Page 2