Loading...
11-626-010— 06115/11 — — —_. _Zone Sizing Summery_ for AH_ Project Name: DORAL IMAGING INSTITUTE 07:27 AM Prepared by: JMM CONSULTING �— Sizing Calculation Information Zone and Space Sizing Method: zone sensible load Calculation Months _._ ___, - -- Jan to Dec Zone CFM ....� — _� .— Space CFM __� ___._� .- -.beak —.. Coincident space loads Sizing Data _ — Calculated Zone Sizing Data F — — .-- -.�..— _— _�..�. �r- .._ —.� Maximum Design Air -- Minimum Air - -.��. — Time Maximum �f Weatin� Cooling peak Load Sensible Flow Flow CFM CFM � � Load 2— _lM��, Zone Name 1 _�MeH 12.81 — - - -- 594 — i- 5� L. —. _ .. —.Jul 1400 - -- 0.61 Zone Zone Terminal Sizing Data No Zone Terminal Sizing Data required for this system Space Loads and Airflows -- _�. -- Coding Time I Air Heating Zone Name I �� Sensible of Flow Uad S ace Name Mult M1 Load CFM - W11 1 12.i Jul 1400 Zane 1 —. �...�_.— � —. —.� . —.. --�, — ^ — - 594 AHU -6_— — — —� -