Loading...
11-481-025SCALE: NE W., PO wvv ER PLAN ALL POWER T ETS ARE REMAIN AS IS. NOW NEW POWER UTLETS HAVE BEEN ADDED. IN 3' C EACH MAIN 1 OF 2 65 KAiC ONE TO TWO 0 STEEL DRIVEN • • (6- r FOUNDA11ON STEEL GROUND t EXISTING NEW PANEL PANEL MAa „B. TOTAL CONNECTED LOAD 24,132 25% OF CONTINUOUS LOAD 550 25% OF LARGEST MOTOR = 11026 TOTAL DEMAND LOAD = 25,708 214 (BASED ON 120/240 V, 1 PH, 4 W) VA 23,342 VA VA 400 VA VA 1,026 VA VA 24,768 VA A 206 A 111JEMAL 7,010 VA 550 VA 0 VA 7,560 VA 63 A NOTES: *) A/C COOLING & HMNG LOADS ARE NON CONCURRENT 3 SERVICE 1i a (BASED »♦ V, 1PH, PHASE PHASE ! NEUTEAL PANEL "A" DEMAND LOAD 25,708 VA 24,768 VA 7,560 VA •` DEMAND LOAD s+ s TOTAL DEMAND LOAD 56,150 VA 51,141 VA 11,255 VA 3.. 1 A r A Revision C y PROPOSED DAYCARE SITE ADDRESS: PRESCHOOL • Checked: f Scale p� AS—SHOWMN Sheet 1' OF 3 1 • ate► PROPOSED DAYCARE SITE ADDRESS: PRESCHOOL • Checked: f Scale p� AS—SHOWMN Sheet 1' OF 3