11-481-010DEMOLITION LEGEND
--------------- �
L---------- - - - - -J
�
r10
I
L
- --
N �
CBS WALL TO BE DEMOLISHED
PARTITION TO BE DEMOLISHED
PLUMBING FIXTURES
TO BE REMOVED
EXIST. DOOR TO BE REMOVED
EXIST. WINDOW TO BE REMOVED
OR REPLACED
GENERAL DEMOLITION NOTES:
1 . CONDITIONS AND REQUIREMENTS: THE DEMOLITION
CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED
FOR HAULING AND LEGALLY DISPOSING OF MATERIALS
REMOVED IN DEMOLITION WORK:
2. PROCEDURES: THE PROCEDURES SHALL PROVIDE FOR
SAFE CONDUCT OF THE WORK, CAREFUL REMOVAL AND
DISPOSITION OF MATERIALS, PROTECTION OF PROPERTY,
COORDINATION WITH WORK OF OTHERS IN PROGRESS,
AND TIMELY DISCONNECTION OF UTILITY SERVICES.
3. DUST CONTROL: THE AMOUNT OF DUST RESULTING FROM
DEMOLITION SHALL BE CONTROLLED TO PREVENT THE
SPREAD OF DUST TO AVOID CREATION OF A NUISANCE IN
THE SURROUNDING AREA. USE OF WATER WILL NOT BE
PERMITTED WHEN IT WILL RESULT IN, OR CREATE HAZARDOUS
OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING.
4. PROTECTION OF EXISTING BUILDING:
A. EXISTING BUILDING SHALL BE PROTECTED FROM
DAMAGE. ANY PART DAMAGED BY THE CONTRACTOR SHALL
BE REPAIRED TO MATCH EXISTING CONDITIONS AT
CONTRACTOR'S EXPENSE.
B. COVER ITEMS AS NECESSARY TO PROTECT FROM DUST.
C. AT END OF EACH WORK DAY, CLOSE OFF AREAS FROM
PUBLIC.
D. DEMOLITION CONTRACTOR SHALL PROVIDE AND MAINTAIN
NECESSARY BARRICADES TO PREVENT SPILLAGE ON ANY
UNAUTHORIZED PERSONS FROM ACCIDENTALLY OR
INTENTIONALLY ENTERING THE WORK AREA.
5. DISPOSING OF MATERIAL:
A. DEBRIS CONTROL: REMOVE AND TRANSPORT DEBRIS
IN LEAK -FREE CONTAINERS IN A MANNER TO PREVENT
SPILLAGE ON ANY PART OF EXISTING BUILDING, PARKING
LOT AREAS, OR CITY STREETS.
B. REGULATIONS: COMPLY WITH COUNTY, MUNICIPALITY,
AND CITY REGULATIONS REGARDING HAULING AND
DISPOSAL OF DEBRIS. ALL SUCH MATERIAL SHALL BE
DISPOSED OF OFF SITE IN A LEGAL DISPOSAL AREA.
6. PREPARATION:
A. PROVIDE ADEQUATE TEMPORARY SUPPORT AS
NECESSARY TO ASSURE STRUCTURAL VALUE OR INTEGRITY
OF AFFECTED PORTION OF PROJECT FROM DAMAGE.
B. PROVIDE DEVICES AND METHODS TO PROTECT OTHER
PORTIONS OF PROJECT FROM DAMAGE.
C. PROVIDE PROTECTION FROM ELEMENTS FOR THAT
PORTION OF THE PROJECT WHICH MAY BE EXPOSED BY
CUTTING AND PATCHING WORK.
7. PERFORMANCE:
A. EXECUTE CUTTING AND DEMOLITION BY METHODS
WHICH WILL PREVENT DAMAGE TO OTHER WORK, AND WHICH
WILL PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION
OF REPAIRS.
B. EXECUTE FITTING AND ADJUSTMENT OF PRODUCTS TO
PROVIDE A FINISHED INSTALLATION TO COMPLY WITH SPECIFIED
PRODUCTS, FUNCTION, TOLERANCE AND FINISHES.
C. RESTORE WORK WHICH HAS BEEN CUT OR REMOVED.
INSTALL NEW PRODUCTS TO PROVIDE COMPLETED WORK IN
ACCORD WITH REQUIREMENTS THROUGH DOCUMENTS.
D. FIT WORK AIR -TIGHT TO PIPES, SLEEVES, DUCTS, CONDUIT
AND OTHER PENETRATIONS THROUGH SURFACES.
E. REFINISH ENTIRE SURFACES AS NECESSARY TO PROVIDE
AN EVEN FINISH TO MATCH ADJACENT FINISHES.
1. FOR CONTINUOUS SURFACES, REFINISH TO
NEAREST INTERSECTION.
2. FOR AN ASSEMBLY, REFINISH ENTIRE UNIT.
SCALE: 1/8"=1'-0"
m z
Z O
� W Q flmu
zza� vzWVOZ
=duWQrj W0=Z�0Q¢-
Bozol- W z_
!z -Q2ow mm�—ym<
Q Z W J W? W D Z 7 LL
Z�W fnN W J., LL<Zgw�
w wor mOhg
ZO�ggooF- �w F:3 Z'
a..a(-u1J-Um; J CIA W
2zW,nO W
Qt- aLLVwip zSOa`�o
oDO�a �tncncn�im
�aWZm� yzzoa
w }�Q�a QRE ww
Wpp�QZ¢dZjNUZ¢�NO
ZWQIUNo =�U >Nm
��°!z0 < ~ZO�Za
<Q >w5zdt8Q <�8
' OozposZoNO9a
w zz o
0 u.°ga¢°6ga2%
NgZg� w-zOu.ZO2-NIr
Wa ga Q� W Z O W W W F= O u.
v. (nmVOOOpZYv
W V}U =UKN W O.J.�mmlW_-
xx Pz0- w
��"��uF92cr! -<jIx 0 Co LL
0
a�
Ir
PROPOSED DAYCARE
AT EXIST. COMMERCIAL
BUILDING
SITE ADDRESS:
6333 S.W. 72 ST.
MIAMI, FLORIDA 331—
TENANT:
TIMEVIEW
PRESCHOOL
Ph:(786) 274 -3668
AGUDELO
ARCHITECT P.A.
A.A.26002013
9885 N.W. 51 Terrace
Doral, Florida 33178
one #:
(786) 738 -8236
nail address:
'man @agudeloarchitect. n
SEAL:
STATOF FLORIDA
�f
GERMAN A. AGLIDELO
ARCHITECT FOR THE FIRM
LICENSE # AR- 0091594