Loading...
11-532-022PLUMBING NOTES 1.0 GENERAL 1.1 PROVIDE (FURNISH AND INSTALL) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL PLUMBING SYSTEM AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED INSTALL IN ACCORDANCE WITH HE FLORIDA BUILDING CODE AND LOCAL ORDINANCES 1.2 SCOPE OF WORK: PROVIDE THE FOLLOWING COMPLETE SYSTEMS: a. SANITARY COLLECTION. b. DOMESTIC COLD AND HOT WATER. 1.3 PAY FOR ALL FEES,INSPECTIONS AND CONNECTION CHARGES REQUIRED. 1.4 VERIFY AT JOB SITE ALL SPACE CONDITIONS,DIMENSIONS WITH PIPE,FIXTURES, AND EQUIPMENT SIZES PRIOR TO FABRICATION OR INSTALLATION,COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.5 SUBMIT SHOP DRAWINGS FOR ARCHITECT/ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. 1.6 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTENCE. 2.0 MATERIALS 2.1 PROVIDE SHUT -OFF VALVES FOR EACH FIXTURE AND AIR CHAMBERS WHERE SHOWN AND WHERE REQUIRED FOR PROPER PERFORMAMCE OF THE SYSTEM. 2.2 PROVIDE DIELECTRIC FITTINGS TO CONNECT PIPING TO EQUIPMENT OF DISSIMILAR METALS,USE CLAMPS AND FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM PIPING AND SLABS TO PREVENT CORROSION. 2.3 PIPING 2.3.1 DOMESTIC COLD AND HOT WATER: COPPER TUBING TYPE "K" OR "L" WITH SOLDER JOINTS,WOG BRONZE VALVES 125 P.S.I. MIN. PROVIDE PRE - MOLDED FIBERGLASS INSULATION FOR HOT WATER LINES. 2.3.2 SANITERY WASTE AND VENT: CAST IRON PIPING UNDER SLABS,CAST IRON NO -HUB OR COPPER D.W.V. ABOVE TO P.V.C. DRAIN PIPE AND FITTINGS MAY BE USED WHEN ALLOWED BY THE LOCAL JURISDICTION. 2.3.4 ALL OUTDOORS FLOOR CLEAN OUTS SHALL BE TERMINATED UP TO GRADE AND SHALL BE MARKED (EXISTING) ,&Tri'TI : C - 1. ANTI - SCALED VALVES FOR TUB /SHOWER REQUIRED 2. VACUUM BREAKER VALVE FOR BIDET REQUIRED 3. PROVIDE SHUT OFF VALVES FOR EACH FIXTURE AND WATER HAMMER ARRESTORS AT QUICK CLOSING VALVES 4. MINIMUN SIZE OF ALL PLUMBING DRAIN LINE BELOW FLOOR 2" 5. ALL WATER PIPING LINES THROUGH ATTIC. 6. ALL FIXTURE AND FAUCETS SHALL COMPLY WITH THE FLORIDA BUILDING CODE WATER CONSERVATION STANDARDS. 7. ALL DRAIN PIPING UNDER SLAB SHALL BE 2" MIN 2" & LESS 0 DRAIN @ 1/4" DROP 3" & 4" 0 DRAIN @ 1/8" DROP 8. PROVIDE SHOCK ARRESTOR EACH CLOTHES WASHER & DISHWASHER. PLUMBING SYMBOL LEGEND SYMBOL DESCRITION TRAP SIZE BUILDING SANITARY SEWER LINE H.W. VENT LINE COLD WATER LINE 3" HOT WATER LINE - PRESSURE AND TEMP.& RELIEF LINE SD STORM DRAIN LINE -- GATE VALVE 1/2" CHECK VALVE PRESSURE AND TEMP & RELIEF VALVE G) PIPE UP V PIPE DOWN ® BFP BACK FLOW PREVENTOR e FCO FLOOR CLEANOUT S WCO WALL CLEANOUT VB VACUUM BREAKER 11 VTR VENT THRU ROOF 0 SA SHOCK ARRESTOR n ACH. AIR CHAMBER =1 S.W.P. SLEEVE WALL PARTITION ASD ANTI SCALD DEVICE --C+ HOSE BIBB TL WH ELECTRONIC TANKLESS WATER HEATER PLUMBING FIXTURE SCHEDULE SYMBOL FIXTURE TYPE TRAP SIZE C.W. H.W. DESCRIPTION WATER CLOSET 3" 1/2" - ® LAVATORY 1 -1/2" 1/2" 1/2" SHOWER 2" 1/2" 1/2" W/ ANTI -SCALD VALVES ® KITCHEN SINK 1 -1/2" 1/2' 1/2" WASHING MACHI. 2" 1/2" 1/2" W /SHOCK ARRESTOR BATH TUB 1 -1/2" 1/2" 1/2" W/ ANTI -SCALD VALVES aREFRIGERATOR N/A 1/2" N/A ICE MAKER CONNECTION DISWASHER 2" 1/2" 1/2" W /SHOCK ARRESTOR TANK LESS WATER HEATER NIAGARA TITAN -SCR2 ELECTRONIC T ANKLESS WATER HEATER MODEL VOLTAGE ENERGY PIPE FITTING EFFICIEi--ICY N-42 4.2KW -220V UP TO 99,5% 1/2" STANDARD PIPE DIMENSIONS ....... 10" x 7" x 2.75" NOTE: TITAN - SCR2 REQUIRING NO VENTING. THE COMPACT SIZE ALLOWS INSTALLATION ALMOST ANYWHERE. DOUBLE SE A ►` HNG GALV. DRYER EXHAUST ROOF CAP. BACKDRAFT DAMPER ROOF TILE L2" X 4" BLDG. 4" MTL.DUCT FROM DRYER EXHAUST BATHROOM EXHAUST DETAILS N.T.S. HING ICKET TYPICAL PITCH POCKET FOR VENT. PIPES & OTHER PENETRATIONS -NTS r r -� 4.• r F4. N Architect RubenTravieso AR 000 8229 2248 SW 57 AV., MIAMI, FL. 33155 786.260.7522 Cell - 786 - 388 -0312 PHN 786.388.0366 FAX E -MAIL: rubentravieso @bellsouth.net REVISIONS: # I DATE: I # I DATE: I PROJECT: I REAR ADDITION AND REMODELING 6321 SW 62nd CT SOUTH MIAMI, FL vr v I SHEET CONTENT: I PLUMBING NOTES ALL IDEAS, DESIGNS, ARRANGEMENTS AND PLANS INDICATED OR REPRESEN- TED BY THIS DRAWING ARE OWNED BY, AND THE PROPERTY ,OF THIS OF- FICE AND WERE CREATED, EVOLVED AND DEVELOPED ' FOR USE ON, AND IN CONNECTION WITH THE SPECIFIED PROJECT. NONE OF SUCH IDEAS, DE- SIGNS, ARRANGEMENTS OR PLANS SHALL BE USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE EXPRESSLY WRITTEN PERMISSION OF RUBEN TRAVIESO, ARCHITECT. PROJECT NUMBER: ISSUED: DRAWN BY: M.P. CHECKED BY: FILENAME: , «. a Y 3 P =3