Loading...
11-532-001up-io 0 51 0:4: ii�lllgmm 11 ZT-4161 J, R EXIST. BUILDING + ADDITION: 2,800 Sq Ft D CR SEWAGE FLOW: 400 qpd �/ 0r (o 04 N NON - POTABI-11 L 400 / 0.80 500 Sq Ft TRENCH DRAINFIEL RESERVE AREA REQUIRED 250 Sq Ft TRENCH CONFIGURATION: 501 Sq Ft 56x 3'= 168 Sq Ft x 3 - 504 Sq Ft lw w lr I 9 ------------- EXIST. E� 75.00 WATER METER T SW 62nd COURT 2Q ASPHALT SITE PLAN -SEPTIC TANK SCALE: 1/8" = l'-O" spml REVISIONS: " 11. PROJECT: = EXIST. BUILDING + ADDITION: 2,800 Sq Ft D CR SEWAGE FLOW: 400 qpd �/ 0r (o 04 N NON - POTABI-11 L 400 / 0.80 500 Sq Ft TRENCH DRAINFIEL RESERVE AREA REQUIRED 250 Sq Ft TRENCH CONFIGURATION: 501 Sq Ft 56x 3'= 168 Sq Ft x 3 - 504 Sq Ft lw w lr I 9 ------------- EXIST. E� 75.00 WATER METER T SW 62nd COURT 2Q ASPHALT SITE PLAN -SEPTIC TANK SCALE: 1/8" = l'-O" spml REVISIONS: " 11. PROJECT: