13-903-014r
V@RkwWoil
SLOPE
2 FU
3" VTR-
} "C.W0.5FU
"H.W0.5FU
CLOSET
N.
cr
z
WAU
CHROME WALL COVER
AND SCREVI
r
# ••
AS CLEANOUT TO ,•r
WALL CLEANOUT DETAIL
Awl IN I r.
WASTE OR VE
1_
:*
•ii`
DINING ROOM
1
01111700*11-01rel
• w12 1
•. 1 ..i
EXISTING HOUSE
3- TWO WAY 1
26.5 RU i
•
•• • r
•
4"
Fill
e •
N.T•S N.T.S
I -
r•i•
: o• /,0y
i
e
VIII IIII VIII
18 "xl8 "x6" THICK
CONCRETE PAD
# .,
MISCELLANEOUS ABBREVIATIONS
lor�7�E�p
UNIT CALCULATION
SH = SHOWER
CO = CLEAN OUT
SK = SINK
COTG = CLEAN OUT TO GRADE
ABBREVIATION
S.O.V = SHUT OFF VALVE
r
A
• .
DF = DRINKING FOUNTAIN
TUB = TUB
FD = FLOOR DRAIN
.,
TUB+ = TUB SHOWER COMBO
HB = HOSE BIB
VTR = VENT THRU ROOF
HW = DOMESTIC HOT WATER
WC = WATER CLOSET
HW = DOMESTIC HOT WATER RETURN
FIXTURE
WH = WATER HEATER ELECTRIC
S = SINK
FIXTURE
WH(G)= WATER HEATER GAS
LAV = LAVATORY
.....
'-,NEW @;'T-
MS = MOP SINK
14 FU SLOPE
WM = WASHING MACHINE
REF = REFRIDGERATOR
1.5
TWO
I���llir
+,
WAY C/O
SLOPE TIE UP
16 RU
TO EXISTING
SEWER LINE
# ••
AS CLEANOUT TO ,•r
WALL CLEANOUT DETAIL
Awl IN I r.
WASTE OR VE
1_
:*
•ii`
DINING ROOM
1
01111700*11-01rel
• w12 1
•. 1 ..i
EXISTING HOUSE
3- TWO WAY 1
26.5 RU i
•
•• • r
•
4"
Fill
e •
N.T•S N.T.S
I -
r•i•
: o• /,0y
i
e
VIII IIII VIII
18 "xl8 "x6" THICK
CONCRETE PAD
# .,
MISCELLANEOUS ABBREVIATIONS
BI = BIDET
UNIT CALCULATION
SH = SHOWER
CO = CLEAN OUT
SK = SINK
COTG = CLEAN OUT TO GRADE
ABBREVIATION
S.O.V = SHUT OFF VALVE
CW = DOMESTIC COLD WATER
SPA = WHIRL- POOL TUB
DF = DRINKING FOUNTAIN
TUB = TUB
FD = FLOOR DRAIN
TUB+ = TUB SHOWER COMBO
HB = HOSE BIB
VTR = VENT THRU ROOF
HW = DOMESTIC HOT WATER
WC = WATER CLOSET
HW = DOMESTIC HOT WATER RETURN
FIXTURE
WH = WATER HEATER ELECTRIC
S = SINK
FIXTURE
WH(G)= WATER HEATER GAS
LAV = LAVATORY
WH (I)= WATER HEATER INSTANT
MS = MOP SINK
1.5
WM = WASHING MACHINE
REF = REFRIDGERATOR
1.5
WMF = WALL MOUNTED FAUCET
FIXTURE CONNECTION
SCHEDULE
UNIT CALCULATION
COLD WATER FIXTURES
HOT WATER FIXTURES
ABBREVIATION
F.U. PER
TOTAL
F.U. PER
TOTAL
...............
FIXTURE
F.U. 'S
QTY'
FIXTURE
F.U. 'S
LAV
3
0.5
1.5
3
0,5
1.5
WC
3
2,2
6.6
WASHING MACHINE
WM
1
1
1
1
1
1
S
1
1
1
1
1
1
DF
-
-
-
-
-
-
TUB+
2
1
2
2
1
2
HB
1
2.5
#
-
-
-
MS
1
1
FIXTURE 1. • OWNER AND APPROVED BY
1
1
1
TO BE -FLOOR MOUNTED.
15.6 F.U.
6.5 F.U.
SUMMATION TOTAL FDXTURE UNITS = 15.6CW + 6.5 H.W = 22.1 F.0
3. KITCHEN FDCTURES TO BE ESS STEEL
C RECOMMENDED METER SIZE PER 2010 FBC = 1" METER
NOTES:
PLUMBING NOTES:
1. WC = 1.5 GALLON PER FLUSH
2. ALL SANITARY LINES SHALL BE SLOPED AS FOLLOWS:
2" OR SMALLER SHALL BE SLOPED AT 1/4" PER
LINEAR FT.
> 3" OR LARGER SHALL BE SLOPED AT 1/8" PER
LINEAR FT.
3. PROVIDE ANTI SCALD VALVES AT ALL SHOWERS.
4. PROVIDE 12" HIGH WATER HAMMER ARRESTOR
CHAMBER AT EACH FIXTURE GROUP.
LEGEND.
COLD WATER LINE BLW. SLAB cv -cv-n+-
HOT WATER LINE BLW.SLAB - xv -M+ --
SA ITARY LINE BLW. SLAB
Lei
r #! i • •• i •r 3.
AS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEM SHALL BEA PART OFTHIS CONTRACT.
3. ALL MATERIALS SHALL BE NEW AND BARE STANDARDS AND / OR I ES I NG LABELS AS APPLICABLE AND
REQUIRED.
4. PLUMBING • i. SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS
FOR A PERIOD OF NOT LESS THAN ONE (1)YEAR FROM DATE OF OWNER ACCEPTANCE.
5. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR OR ..i • ,INS
�UBLIC USABILITY ► PROPERTY DAMAGE FORTHE DURATION OF ••
CONTRACTOR 6. PLUM BING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEESINSPECTION AND TEST,
TO OBTAIN PERMIT AND APPRVED SUBMITTALS PRIOR TO BEGINNIG WORK • •
ORDERING •
BING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS #• BY r O
AUTHORITIES.
8. CONTRACTOR SHALL TEST PLUMBING SYSTEMS AS REQUIRED BY it AND ••• r •
OWNER.
9. CONTRACTOR SHALL COORDINATE • • • i NS WITH EQUIPMENT DRAWINGS • r
4 •PLI R. N LL # UIPMENT AND MAKE FINAL • NNE # FURNISHING SHUT OF .,.
i ALL PIPING
• IRED.
r1l). CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO ASTO AVOID ANY PIPE ROUTING
••:
i, CORRECTIONS OF DEFECTS OR REPAIR OF •. / r OR MATERIALS
GiHALL BE COMPLETED WITHOUT ADDITIONAL TO OWNER AND SHALL INCLUDE OR
AEPAIR OF OTHER PHASE OF • DAMAGED.
DRAWINGS DIAGRAM MA TIC. •i NOT SCALE FOR THE EXACT • OF PIPING,
#.
INSTALLATION 0. ALL WORK SHALL BE COORDINATED WrTH THE OTHER TRADES TO AVOID INTERFERENCE WITH THE
"ROGRESS OF CONSTRUCTION REPORT AND CON FLICT OR DISCREPANCY TO ARCHITECT PRIOR TO BEGINNING
CONSTRUCTION. ARCHITECT DISPOSITION OF THE ISSUE WILL BE USED AND IINY-11LI71).
0. THE •••• SECTION
i FOR PROPER FIXTURE • •. i• SHALL NOT r • • i OR
CP NOT •r E MINIMUM STANDARDS REFER TO ARCHITECTURAL FLOOR PLANS FOR PLUMBING
FIXTURE LOCATIONS. # OF DISCREPANCY.
15. VERIFY LOCATION, SIZE, DIRECTION FLOW AND INVERTS OF ALL D=NG UTILMES PRIOR TO BEGINNING
#F CONSTRUCTION, • • OF DISCREPANCIES.
• COPPER (HARD DRAWN COPPER)WITH WROUGHT COPPER OR BRONZE
21 14
• .i i •�• • r •• r • r : •
••• 51�135. 5i"PA-11L BE I't PE "K" C41PRE& TtBIAG OF • Trllff ilU • •• •
FLOOR SLAB PROVIDE I" INSULATION (CODE APPROVED)ON ALL BELOW GRADE PIPING AND HOT WATER PIPING
ABOVE. FOAM CLASS FOR WALL PENETRATIONS.
17. SOIL, WASTE AND VENT PIPING SHALL BE PVC SCHEDULE 40 NO HUB WITH SOLVENT JOINTS,
ASTM 02729. OR CAST IRON.
18. FURNISH AND INSTALL APPROVED SHOCK ARRESTORS i` PLUMBING
FIXTURE WHERE QUICK • ARE r r WATER HAMMER ARRE5TOR�LS_HAl_J_RF_A_Cf
LOCATED WITHIN THE AFFECTED RANGE OF PDL FURNISH AND INSTALL APPROVED SHOCK
ARRESTORS ON OR RISERS
• DIELECTRIC COUPLINGS ARE i r BETWEEN ALL DISSIMILAR METAL IN PIPING AND EQUIPMENT
CONNECTIONS.
0'0. ff#,LATE COPPER PIPE FROM HANGER OR SUPPORTS WTTH ISOLATION PAD.
22. ALL FIRE RATED FLOOR AND WALL • •• • w ..i. ..# t •• •/ •
CONTRACTOR 23. PLUM BING SHALL GUARANTEE ALL MATERIALS AND 'WORKMANSHIP FREE FROM DEFECTS
FOR • • RIOD OF NOT LESS THAN ONE FROM DATE OF OWNER
PROVIDE ti PANELS FOR ALL CONCEALED VALVES AND ALL WATER HAMMER ARRESTERS. ACCESS
PANELS IN RATED WALLS SHALL MAINTAIN THE ASSEMBLY FIRE RATING AND SHALL MATCH THE WALL FINISH
IN AREA IT IS
INSTALLED.
24. PROVIDE CHROME PLATED OR CORROSION RESISTANT COMBINATION COVER PLATE AND CLEAN OLTT PLUG
`, I i . • r .•i •. , •
""'ETURN AIR PLENUMS.
27. NO PERMITTED ••• MS; INCLUDING WATER, SANITARY OR DRAINAGE
28-ALL�M-1 r A ••s r •
9,PROVIDED FOR OWNER/OPERATOR.
• r • r
i
PROVIDE C BREAKERS r SHLJTOFF AT EACH HOSE
JACOB BRUiRART
FLORDA REGGTERED ARCHTECT
AR93M
FIXTURE
UNIT CALCULATION
COLD WATER FIXTURES
HOT WATER FIXTURES
ABBREVIATION
F.U. PER
TOTAL
F.U. PER
TOTAL
QTY`
FIXTURE
F.U. 'S
QTY'
FIXTURE
F.U. 'S
LAV
3
0.5
1.5
3
0,5
1.5
WC
3
2,2
6.6
WM
1
1
1
1
1
1
S
1
1
1
1
1
1
DF
-
-
-
-
-
-
TUB+
2
1
2
2
1
2
HB
1
2.5
2.5
-
-
-
MS
1
1
1
1
1
1
SUB -TOTAL
15.6 F.U.
6.5 F.U.
SUMMATION TOTAL FDXTURE UNITS = 15.6CW + 6.5 H.W = 22.1 F.0
C RECOMMENDED METER SIZE PER 2010 FBC = 1" METER
NOTES:
1. REFER TO PLANS AND ISOMETRICS FOR SYSTEMS LOCATIONS + DESCRIPTION.
2. BASED ON F.B.0 PLUMBING 407.3
3. NOT USED
PLUMBING NOTES:
1. WC = 1.5 GALLON PER FLUSH
2. ALL SANITARY LINES SHALL BE SLOPED AS FOLLOWS:
2" OR SMALLER SHALL BE SLOPED AT 1/4" PER
LINEAR FT.
> 3" OR LARGER SHALL BE SLOPED AT 1/8" PER
LINEAR FT.
3. PROVIDE ANTI SCALD VALVES AT ALL SHOWERS.
4. PROVIDE 12" HIGH WATER HAMMER ARRESTOR
CHAMBER AT EACH FIXTURE GROUP.
LEGEND.
COLD WATER LINE BLW. SLAB cv -cv-n+-
HOT WATER LINE BLW.SLAB - xv -M+ --
SA ITARY LINE BLW. SLAB
Lei
r #! i • •• i •r 3.
AS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEM SHALL BEA PART OFTHIS CONTRACT.
3. ALL MATERIALS SHALL BE NEW AND BARE STANDARDS AND / OR I ES I NG LABELS AS APPLICABLE AND
REQUIRED.
4. PLUMBING • i. SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS
FOR A PERIOD OF NOT LESS THAN ONE (1)YEAR FROM DATE OF OWNER ACCEPTANCE.
5. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR OR ..i • ,INS
�UBLIC USABILITY ► PROPERTY DAMAGE FORTHE DURATION OF ••
CONTRACTOR 6. PLUM BING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEESINSPECTION AND TEST,
TO OBTAIN PERMIT AND APPRVED SUBMITTALS PRIOR TO BEGINNIG WORK • •
ORDERING •
BING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS #• BY r O
AUTHORITIES.
8. CONTRACTOR SHALL TEST PLUMBING SYSTEMS AS REQUIRED BY it AND ••• r •
OWNER.
9. CONTRACTOR SHALL COORDINATE • • • i NS WITH EQUIPMENT DRAWINGS • r
4 •PLI R. N LL # UIPMENT AND MAKE FINAL • NNE # FURNISHING SHUT OF .,.
i ALL PIPING
• IRED.
r1l). CONTRACTOR SHALL COORDINATE WITH ALL DISCIPLINES INVOLVED SO ASTO AVOID ANY PIPE ROUTING
••:
i, CORRECTIONS OF DEFECTS OR REPAIR OF •. / r OR MATERIALS
GiHALL BE COMPLETED WITHOUT ADDITIONAL TO OWNER AND SHALL INCLUDE OR
AEPAIR OF OTHER PHASE OF • DAMAGED.
DRAWINGS DIAGRAM MA TIC. •i NOT SCALE FOR THE EXACT • OF PIPING,
#.
INSTALLATION 0. ALL WORK SHALL BE COORDINATED WrTH THE OTHER TRADES TO AVOID INTERFERENCE WITH THE
"ROGRESS OF CONSTRUCTION REPORT AND CON FLICT OR DISCREPANCY TO ARCHITECT PRIOR TO BEGINNING
CONSTRUCTION. ARCHITECT DISPOSITION OF THE ISSUE WILL BE USED AND IINY-11LI71).
0. THE •••• SECTION
i FOR PROPER FIXTURE • •. i• SHALL NOT r • • i OR
CP NOT •r E MINIMUM STANDARDS REFER TO ARCHITECTURAL FLOOR PLANS FOR PLUMBING
FIXTURE LOCATIONS. # OF DISCREPANCY.
15. VERIFY LOCATION, SIZE, DIRECTION FLOW AND INVERTS OF ALL D=NG UTILMES PRIOR TO BEGINNING
#F CONSTRUCTION, • • OF DISCREPANCIES.
• COPPER (HARD DRAWN COPPER)WITH WROUGHT COPPER OR BRONZE
21 14
• .i i •�• • r •• r • r : •
••• 51�135. 5i"PA-11L BE I't PE "K" C41PRE& TtBIAG OF • Trllff ilU • •• •
FLOOR SLAB PROVIDE I" INSULATION (CODE APPROVED)ON ALL BELOW GRADE PIPING AND HOT WATER PIPING
ABOVE. FOAM CLASS FOR WALL PENETRATIONS.
17. SOIL, WASTE AND VENT PIPING SHALL BE PVC SCHEDULE 40 NO HUB WITH SOLVENT JOINTS,
ASTM 02729. OR CAST IRON.
18. FURNISH AND INSTALL APPROVED SHOCK ARRESTORS i` PLUMBING
FIXTURE WHERE QUICK • ARE r r WATER HAMMER ARRE5TOR�LS_HAl_J_RF_A_Cf
LOCATED WITHIN THE AFFECTED RANGE OF PDL FURNISH AND INSTALL APPROVED SHOCK
ARRESTORS ON OR RISERS
• DIELECTRIC COUPLINGS ARE i r BETWEEN ALL DISSIMILAR METAL IN PIPING AND EQUIPMENT
CONNECTIONS.
0'0. ff#,LATE COPPER PIPE FROM HANGER OR SUPPORTS WTTH ISOLATION PAD.
22. ALL FIRE RATED FLOOR AND WALL • •• • w ..i. ..# t •• •/ •
CONTRACTOR 23. PLUM BING SHALL GUARANTEE ALL MATERIALS AND 'WORKMANSHIP FREE FROM DEFECTS
FOR • • RIOD OF NOT LESS THAN ONE FROM DATE OF OWNER
PROVIDE ti PANELS FOR ALL CONCEALED VALVES AND ALL WATER HAMMER ARRESTERS. ACCESS
PANELS IN RATED WALLS SHALL MAINTAIN THE ASSEMBLY FIRE RATING AND SHALL MATCH THE WALL FINISH
IN AREA IT IS
INSTALLED.
24. PROVIDE CHROME PLATED OR CORROSION RESISTANT COMBINATION COVER PLATE AND CLEAN OLTT PLUG
`, I i . • r .•i •. , •
""'ETURN AIR PLENUMS.
27. NO PERMITTED ••• MS; INCLUDING WATER, SANITARY OR DRAINAGE
28-ALL�M-1 r A ••s r •
9,PROVIDED FOR OWNER/OPERATOR.
• r • r
i
PROVIDE C BREAKERS r SHLJTOFF AT EACH HOSE
JACOB BRUiRART
FLORDA REGGTERED ARCHTECT
AR93M