13-1085-019GENERAL PLUMBING
1. ALL w•• 1' AND MATERIALS SHALL
NATIONAL, BE IN STRICT ACCORDANCE WITH APPLICABLE
FBC, RULES, ORDINANCES
AND ANY OTHER PERTAINING CODES.
2. ALL MATERIAL SHALL BE ,•,
3. WORK SHALL BE PERFORMED BY A LICENSED
PLUMBING CONTRACTOR IN A FIRST-CLASS
WORICMEANU[KE MANNER. ALL MATERIALS
SHALL BE W AND PROVIDED BY THIS CON-
TRACTOR. • 1• r SYSTEM SHALL BE
FULLY OPERATIVE.
4. PROVIDE ALL EXCAVATIONS AND BACKFILL
• r FOR OF CONSTRUCTION.
5. CONTRACTOR SHALL PAY FOR ALL PERMM,
INSPECTIONS, INSURANCE
REQUIRED •• PROTECTION AGAINST PUBLIC
LIABILITY AND PROPERTY DAMAGE FOR THE
DURATION OF WORK
6. SUBM[IT SHOP DRAWINGS i THE ARCHITECT/
ENGINEER FOR REVIEW OF PLUMBING SYSTEM
COMPONENTS. SUBSTITUTIONS • r BY
THE i i' SHALL BE PAID FOR BY THE
CONTRACTOR.
7. DRAWINGS ARE DIAGRAMMATIC r.
NOT E14TENDED TO SHOW EVERY M[INOR
DETAIL, •. ARE THEY 1 r r• BE
SCALED FOR EXACT LOCATION OF
PIPING, OR ANY OTHER • 1 ENT COMPONE
: WORK SHALL BE COORDINATED W
OTHER TRADES TO AVOID R*4TERFERENCE WITH
THE PROGRESS
BEFORE 9. . 1 1 vt•. CONTRACTOR
SHALL FIELD VERIFY
ELEVATION, AND ALL =STING UTILITIES
. POINTS OF . •
ENGINEER I I I r IATELY SHOULD ANY
DISCREPANCIES BE • r
1 SOIL, WASTE, AND VENT PIPING BE
NO-HUB CAST IRON SOIL PIPE. 'WHERE NOT
IN OR UNDERGROUND AND
AUTHORMES ALLOW, PVC SCHEDULE 41
DWVMAYBEUSED.
• •. GUARANTEE COMPLETE
SYSTEM INCLUDING MATERIAL Ar WORK-
MANSHIP • BE . • DEFECTS FOR
PERIOD OF • ONE FROM
FINAL DATE OF •.. • OF
ANY DEFECTS i r r W OUT
ADDITIONAL C• TO THE OW114Fa AND SHALL
INCLUDE I OR REPAIR OF
OTHER PHASE OF 1 • WHICH
MAY HAVE BEEN DAMAGED THEREBY
12. ALL FIXIURES SHALL BE PROVIDED WITH
READILY 1: LE STOPS/CLEANOUIS AND
CONTROL PROVIDE ••.• r AIR
CHAMBERS 1: ING FDCrURE.
WHERE DISSEVBLAR METALS TO BE JOINED,
APPROVED INSULATION UNIONS
INSTALLED.
PROVIDE • OF
SOIL AND WASTE PIPE AND AT NO
• PIPE.
15. ALL UNDERGROUND PIPING SHALL BE COPPER
TYPE K ALL OTHER WATER
BE COPPER
DOMESTIC WATER PIPING 1` CHAMBERS
BE 1 PIPE DIAMETERS •
LONG. AIR CHAM13ERS SHALL BE PROVIDED AT
EACH r GROUP • r r
ENDS OF 1
s
s
1
N
O
1
I
3" (7 FU.) DN. TO
1ST FLOOR. EXTEND VENT THRU R
.1" — .—
1 FU \at
MASTER
a
6'_11" L 15' -2"
6' -11"
ON
cv
00
I
N
00
I
1v-a
PI.ING MATERIALS r•1
1. SANITARY WASTE, VENT AND STORM DRAIN:
BELOW GROUND: "CAST 11RON", SERVICE WEIGHT PIPE, 4
FriTiN ACCORDING • ASTM A-14 HUB & SPIGOT i•
ABOVE •• r I•• SOIL, •1•- :
ACCORDING • • r WITH STAINLESS
•- SHIELD AND CLAMPS • E•. NEOPRENE -• r
SLEEVE
ALTERNATE: THE PLUMBING C• • . • , ELECT!, 1-
APPROVED BY OWNER, TO USE FOLLOWING ..
SPECMCA11ON FOR WASTE, r STORM DRAIN
SYSTEM- POLYVINYL 1 •Ir r- 1
(SCHEDULE 40). MATERIAL SHALL COMPLY WITH D-1784,
in i'llNGS, SHALL COMPLY WIlH ASTM D-2467 SOCKET
• r LVENT CEMENT SHALL COMPLY WITH D-2564.
2. CONDENSATE DRAINS FROM 1• CONDITIONING UNIT'S"PVC"
SCHEDULE 40 •r• AND FlITIN
COPPER 3. DOMESTIC WATER ABOVE GROUND- TYPE M COPPER PIPE
wri'HWROUGHT COPPER SOLDERED JOINT FMINGS. TYPE L
BELOW GROUND PIPING ACCORDING TO ASTM
B-42 TUBE ACCORDING TO .. ALTERNATE .•.
UNDERGROUND PIPE: CAST IRON WATER PIPE ACCORDING
• STEEL I -
•rr- r -.r GALVANIZED)
ACCORDING TO i•:
4. ALL CONTROL VALVES FOR DONERSTIC WATER SHALL BE
BRASS CAST
• . . .. BRONZE . VALVES.
5. PROVIDE DIET • CTRIC Fr INGS FORJORSUNG DISSMOLAR
1•
•
•
of) f
I
h
F--
c
MR
�., - —
I
-a„
VO (7 FU.) HW & CW
UP FROM 1ST FLOOR
15' -2" # 6' -11„
PIPING SYMBOLS
SOIL OR WASTE PIPE
FIXTURE DRAIN & TRAP
VENT PIPING
COLD WATER PIPING
(CW)
HOT WATER PIPING
(HW)
GATE VALVE
(GV)
WATER SUPPLY /ANGLE STOP
WALL CLEANOUT (FLOOR
WHERE
NOTED)
(CO)
FLOOR DRAIN
1.6 GPF. WATER SAVER
AIR ADMITTANCE VALVE (AAV)
1 -1/4"
VENT THRU ROOF
(VTR)
GAS PIPE
TUB
GAS COCK
1/2"
UNION
ANTI —SCALD VALVE — WATER SAVER
m
•i
N
00
i
ra
I.
PLUMBING SCHEDULE LEGEND
ITEM
DRAIN
WATER
REMARKS
CW
HW
WC
3"
1/2"
1/2"
1.6 GPF. WATER SAVER
LAV
1 -1/4"
1/2"
1/2"
WATER SAVER
TUB
1 -1/2"
1/2"
1/2"
ANTI —SCALD VALVE — WATER SAVER
GEMD.r. - ►E,,'MARCO
A R` ''H 1 ,'Y - #`,'C -.•T
g.o.
GERALD F. DE MARCO
RA 0008818
7241 S.W. 166ni STREET - SLATE E
MIAMI, FLORIDA 33157
305.255.2999 - 305.255.4499(FA4
en
W�
u W M
z
W
z A
0
PLUMBING PLAN
PROJECT NO.: 1212
DATE: 09 -24 -13
DRAWN BY: ARB
REVISION BY DATE
SHEET NO.
P� I
OF