Loading...
13-1085-019GENERAL PLUMBING 1. ALL w•• 1' AND MATERIALS SHALL NATIONAL, BE IN STRICT ACCORDANCE WITH APPLICABLE FBC, RULES, ORDINANCES AND ANY OTHER PERTAINING CODES. 2. ALL MATERIAL SHALL BE ,•, 3. WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST-CLASS WORICMEANU[KE MANNER. ALL MATERIALS SHALL BE W AND PROVIDED BY THIS CON- TRACTOR. • 1• r SYSTEM SHALL BE FULLY OPERATIVE. 4. PROVIDE ALL EXCAVATIONS AND BACKFILL • r FOR OF CONSTRUCTION. 5. CONTRACTOR SHALL PAY FOR ALL PERMM, INSPECTIONS, INSURANCE REQUIRED •• PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF WORK 6. SUBM[IT SHOP DRAWINGS i THE ARCHITECT/ ENGINEER FOR REVIEW OF PLUMBING SYSTEM COMPONENTS. SUBSTITUTIONS • r BY THE i i' SHALL BE PAID FOR BY THE CONTRACTOR. 7. DRAWINGS ARE DIAGRAMMATIC r. NOT E14TENDED TO SHOW EVERY M[INOR DETAIL, •. ARE THEY 1 r r• BE SCALED FOR EXACT LOCATION OF PIPING, OR ANY OTHER • 1 ENT COMPONE : WORK SHALL BE COORDINATED W OTHER TRADES TO AVOID R*4TERFERENCE WITH THE PROGRESS BEFORE 9. . 1 1 vt•. CONTRACTOR SHALL FIELD VERIFY ELEVATION, AND ALL =STING UTILITIES . POINTS OF . • ENGINEER I I I r IATELY SHOULD ANY DISCREPANCIES BE • r 1 SOIL, WASTE, AND VENT PIPING BE NO-HUB CAST IRON SOIL PIPE. 'WHERE NOT IN OR UNDERGROUND AND AUTHORMES ALLOW, PVC SCHEDULE 41 DWVMAYBEUSED. • •. GUARANTEE COMPLETE SYSTEM INCLUDING MATERIAL Ar WORK- MANSHIP • BE . • DEFECTS FOR PERIOD OF • ONE FROM FINAL DATE OF •.. • OF ANY DEFECTS i r r W OUT ADDITIONAL C• TO THE OW114Fa AND SHALL INCLUDE I OR REPAIR OF OTHER PHASE OF 1 • WHICH MAY HAVE BEEN DAMAGED THEREBY 12. ALL FIXIURES SHALL BE PROVIDED WITH READILY 1: LE STOPS/CLEANOUIS AND CONTROL PROVIDE ••.• r AIR CHAMBERS 1: ING FDCrURE. WHERE DISSEVBLAR METALS TO BE JOINED, APPROVED INSULATION UNIONS INSTALLED. PROVIDE • OF SOIL AND WASTE PIPE AND AT NO • PIPE. 15. ALL UNDERGROUND PIPING SHALL BE COPPER TYPE K ALL OTHER WATER BE COPPER DOMESTIC WATER PIPING 1` CHAMBERS BE 1 PIPE DIAMETERS • LONG. AIR CHAM13ERS SHALL BE PROVIDED AT EACH r GROUP • r r ENDS OF 1 s s 1 N O 1 I 3" (7 FU.) DN. TO 1ST FLOOR. EXTEND VENT THRU R .1" — .— 1 FU \at MASTER a 6'_11" L 15' -2" 6' -11" ON cv 00 I N 00 I 1v-a PI.ING MATERIALS r•1 1. SANITARY WASTE, VENT AND STORM DRAIN: BELOW GROUND: "CAST 11RON", SERVICE WEIGHT PIPE, 4 FriTiN ACCORDING • ASTM A-14 HUB & SPIGOT i• ABOVE •• r I•• SOIL, •1•- : ACCORDING • • r WITH STAINLESS •- SHIELD AND CLAMPS • E•. NEOPRENE -• r SLEEVE ALTERNATE: THE PLUMBING C• • . • , ELECT!, 1- APPROVED BY OWNER, TO USE FOLLOWING .. SPECMCA11ON FOR WASTE, r STORM DRAIN SYSTEM- POLYVINYL 1 •Ir r- 1 (SCHEDULE 40). MATERIAL SHALL COMPLY WITH D-1784, in i'llNGS, SHALL COMPLY WIlH ASTM D-2467 SOCKET • r LVENT CEMENT SHALL COMPLY WITH D-2564. 2. CONDENSATE DRAINS FROM 1• CONDITIONING UNIT'S"PVC" SCHEDULE 40 •r• AND FlITIN COPPER 3. DOMESTIC WATER ABOVE GROUND- TYPE M COPPER PIPE wri'HWROUGHT COPPER SOLDERED JOINT FMINGS. TYPE L BELOW GROUND PIPING ACCORDING TO ASTM B-42 TUBE ACCORDING TO .. ALTERNATE .•. UNDERGROUND PIPE: CAST IRON WATER PIPE ACCORDING • STEEL I - •rr- r -.r GALVANIZED) ACCORDING TO i•: 4. ALL CONTROL VALVES FOR DONERSTIC WATER SHALL BE BRASS CAST • . . .. BRONZE . VALVES. 5. PROVIDE DIET • CTRIC Fr INGS FORJORSUNG DISSMOLAR 1• • • of) f I h F-- c MR �., - — I -a„ VO (7 FU.) HW & CW UP FROM 1ST FLOOR 15' -2" # 6' -11„ PIPING SYMBOLS SOIL OR WASTE PIPE FIXTURE DRAIN & TRAP VENT PIPING COLD WATER PIPING (CW) HOT WATER PIPING (HW) GATE VALVE (GV) WATER SUPPLY /ANGLE STOP WALL CLEANOUT (FLOOR WHERE NOTED) (CO) FLOOR DRAIN 1.6 GPF. WATER SAVER AIR ADMITTANCE VALVE (AAV) 1 -1/4" VENT THRU ROOF (VTR) GAS PIPE TUB GAS COCK 1/2" UNION ANTI —SCALD VALVE — WATER SAVER m •i N 00 i ra I. PLUMBING SCHEDULE LEGEND ITEM DRAIN WATER REMARKS CW HW WC 3" 1/2" 1/2" 1.6 GPF. WATER SAVER LAV 1 -1/4" 1/2" 1/2" WATER SAVER TUB 1 -1/2" 1/2" 1/2" ANTI —SCALD VALVE — WATER SAVER GEMD.r. - ►E,,'MARCO A R` ''H 1 ,'Y - #`,'C -.•T g.o. GERALD F. DE MARCO RA 0008818 7241 S.W. 166ni STREET - SLATE E MIAMI, FLORIDA 33157 305.255.2999 - 305.255.4499(FA4 en W� u W M z W z A 0 PLUMBING PLAN PROJECT NO.: 1212 DATE: 09 -24 -13 DRAWN BY: ARB REVISION BY DATE SHEET NO. P� I OF