Loading...
13-1085-002SW 56TH f f i Li Q 0 fD WNd� SW -57TH— - — STREET- GENERAL NOTES: 1. The Contractor shall visit the site and familiarize himself with all conditions prior to starting the work. 2. The Contractor shall comply with all requirements of the Florida Building Code and all other Federal and State regulations applicable to the work. 3. The Contractor shall notify the Architect immediately if there are any subsurface or other latent conditions encountered that vary materially from those indicated on the drawings. 4. The Contractor shall be responsible to provide all temporary connections for water, electrical or sanitary lines that may be required for the execution of the work. The Contractor shall also be responsible for providing and maintain' g temporary sanitary facilities for the use of workmen and subcontractor personnel during the progress of the project. 5. The Contractor shall provide and maintain adequate protection of all his work from damage, and shall protect the Owner's property from injury or loss arising in connection with the project. The Contractor shall be responsible for any such injury or loss, except as may be directly caused by the Owner or his agents or employees. 6. The Contractor shall keep the premises free from the accumulation of waste materials and rubbish, and at the completion of the work, he shall remove all rubbish, equipment, and surplus materials and leave the site clean and the building broom clean. All hardware, glass, fixtures and finished surfaces shall be left clean and undamaged. 7. The Contractor shall check and verify all dimensions and conditions at the site prior to proceeding with the work. 8. Contractor shall be responsible for providing proper anchorage of all built-in fixtures and equipment included in the scope of work. Contractor shall also be responsible for the coordination and final location of all equipment including the required mechanical, plumbing, and electrical services for said equipment. 9. Contractor shall be responsible for accuracy in alignment and installation of all fixtures, equipment and all other work with respect to the application of final finishes. Any modifications required at the time of installation shall be the responsibility of the Contractor and shall be paid by the Contractor. •' • �X1•' • «. 1 �y 1 . r • 13 . • 11 1 •• i' -r 1 • 1 SrM PLAN, ZONING INFO DEMO - • • • PLAN PROPOSED PLANS A-3 El r VATIONS FIT r VATIONS A-5 SECTIONS, SCHEDULES, DETAns FOLINDATION ES S-2 FRAN[ING PLANS DETAIIS • PLUMBINGPLAN NEECHANICALPLAN . . . CTRICAL PLAN . • r Ir r e ZONE: RS-3 25' -0" 38'-8" 38'-8" REQUIRED )"MG PROVIDED LOT SIZE: - 5,335.74 sq & 5,335.74 sq ft. BUILDING AREA: - 1,452.0 sq. ft. 2,155.15 sq. & LOT FRON'T'AGE: 75 fit 121.33 fit 121.33 ft. MAX. BUILDING COVER 30% 1,600.7 sq. & 1,452.0 sq. & rm mml,452.0 sq. ft. MAX. F.A.R. 52.5% 2,801.26 sq & 1,452.0 sq. & 2,155.15 sq. fit QNFL0M MAX- STRUCTURE HEIGHT 25 ft. 22 & 22 ft. FRONT 25' -0" 38'-8" 38'-8" SIDE 15' -0" 4' -7" 4!-7" REAR. 25' -0" 24' -10" 24' -10" SECOND FL, INT. SIDE 15' -0" - 7-1" MAX. BIPERVIOUS COV. 45% 2,399.73 sq fir. 1,831.43 sq. ft. 1,831.43 sq. & GREEN SPACE NEN 60% 3,201.44 sq. fit. 3,883.74 sq. fir. 3,883.74 sq. ft. LEGi�L DESCRIMON. A_ a CAMBRIDGE LAWNS PB 30-82 LOT 24 BLK 2 LOT SIZE 65.070 X 82 OR 20244-219103 / 2002 1 OR Y 20244-21910302 00 s PROJECT NO.: 1212 DATE: 49 -24 -13 DRAWN BY: ARB REVISION BY DATE s � • PROJECT NO.: 1212 DATE: 49 -24 -13 DRAWN BY: ARB REVISION BY DATE