GENERAL NOTES:
1. The Contractor shall visit the site and familiarize himself with all conditions prior to
starting the work.
2. The Contractor shall comply with all requirements of the Florida Building
Code and all other Federal and State regulations applicable to the work.
3. The Contractor shall notify the Architect immediately if there are any subsurface or
other latent conditions encountered that vary materially from those indicated on the
drawings.
4. The Contractor shall be responsible to provide all temporary connections for water,
electrical or sanitary lines that may be requited for the execution of the work. The
Contractor shall also be responsible for providing and maintaining temporary
sanitary facilities for the use of workmen and subcontractor personnel during the
progress of the project.
5. The Contractor shall provide and maintain adequate protection of all his work from
injury damage, and shall protect the Owner's property from in)-ary or loss arising in
connection with the project. The Contractor shall be responsible for any such injury
or loss, except as may be directly caused by the Owner or his agents or employees.
6. The Contractor shall keep the premises free from the accumulation of waste
materials and rubbish, and at the completion of the work, he shall remove all rubbish,
equipment, and surplus materials and leave the site clean and the building broom clean.
All hardware, glass, fixtures and finished surfaces shall be left clean and undamaged.
7. The Contractor shall check and verify all dimensions and conditions at the site prior
to proceeding with the work.
8. Contractor sliall be responsible for providing proper anchorage of all built-in
fixtures and equipment included in the scope of work. Contractor shall also be
responsible for the coordination and final location of all equipment including the
required mechanical, plumbing, and electrical services for said equipment.
9. Contractor shall be responsible for accuracy in alignment and installation of all
fixtures, equipment and all other work with respect to the application of final finishes.
Any modifications required at the time of installation shall be the responsibility of the
Contractor and shall be paid by the Contractor.
EXISTING PERVIOUS
BRICK ON SAND
(E
EXISTING 34" DOMESTIC
WATER METER TO REMAIN
---------------
L
2ND FLOOR ATTIC'/1
SPACE
L _J
-11
SCOPE OF WOR1,-',,-:
LIST OFD WINGS:
ZONE: RS-3
A-0
SITE PLAN, ZONING INFO
REQUIRED
EXISTING
A-1
DEMO FLOOR PLAN
5,335.74 sq. ft
A-2
PROPOSED PLANS
1,452.0 sq. ft
A-3
ELEVATIONS
75 ft
121-33 ft.
A-4
ELEVATIONS
1,600.7 sq. ft
1,452.0 sq. ft.
A-5
SECTIONS, SCHEDULES, DETAILS
C:
:3
1,452.0 sq. ft.
S-1
FOUNDATION PLAN, BEAM PLAN, SCHEDULES
0 E
zomd
-
S-2
FRAMING PLANS
( a) o,
22 ft
S-3
DETAILS
-0 0
cc �
[L
P-1
PLUMBING PLAN
=
M-1
MECHANICAL PLAN
W E 3: a)—
(6
E-1
ELECTRICAL PLAN
--D ,
E-2
PANEL SCHEDULE
0 7E U)
z b
2
0
Cz
a
Ca-
<C
ZONE: RS-3
REQUIRED
EXISTING
PROVIDED
LOT SIZE:
5,335.74 sq. ft
5,335.74 sq. ft
BUILDING AREA:
1,452.0 sq. ft
2,155.15 sq. ft
LOT FRONTAGE:
75 ft
121-33 ft.
121.33 ft.
MAX BUILDING COVER. 30%
1,600.7 sq. ft
1,452.0 sq. ft.
FIRST FLOOR 1,452.0 sq. ft.
MAX. F.A.R. 52.5%
2,801.26 sq. ft
1,452.0 sq. ft.
2,155.15 sq. ft
(INCLUDING SECOND FLOOR ADD-71710N)
MAX. STRUCTURE HEIGHT
25 ft
22 ft
221 E
BUILDING SETBACK MIN
FRONT 251-011 381-811
SIDE 151-011 4!-711
REAR 251-011 24!-101f
SECOND FL. INT. SIDE 151-011
MAX IMPERVIOUS COV. 450/c, 2,399.73 sq. ft 1,831.43 sq. ft
GREEN SPACE MIN 60% 3,201.44 sq. ft 3,883.74 sq. ft.
LEGIT , DESCP TPH
ON:
V r- 6=1 071—ri � 7 -!-)=j 1: Z 7=9 T T — SY 7- E 6.5. (1 / J R6
OR 20244-2191 03 / 2002 1 OR
202144-21910302 00
38t-811
,V-711
24!-1011
7f-111
1,,831.43 sq. E
3.883.74 sq. ft
GERALD F. DE MARCO
A R C. H- ,t T�,,E""C T
GERALD F' DE MARCO
RA 0008818
7241 S.W. 168TH STREET - SUITE E
MIAMI, FLORIDA 33157
305.255.2999 - 305155.4499(FAX)
I SITE PLAN
PROJECT NO.: 1212
DATE: 09-24-13
DRAINN BY: ARB
RE\ASION BY DATE
01-23-14
do
I SITE PLAN
PROJECT NO.: 1212
DATE: 09-24-13
DRAINN BY: ARB
RE\ASION BY DATE
01-23-14