Loading...
12-952-015OI SL W/ COMMON UNISEX UNISEX WOMEN MEN'S AREA TOILET TOILET STORAGE OFFICE #2 1 HVAC PLAN Scale: 1/4" = V -0" HVAC UNIT SCHEDULE (BASED ON TRANE) CU MODEL VOLTS MCA MOCP LIQ SUC I REFRIG WxDxH WEIGHT AHU MODEL VOLT MCA MOCP FULL QT FULL. QS FULL CEM SEER EER WxDxH WEIGHT COMMENTS CU -1 4TTX6036G1 1/208/60 22.0 35A 3/8 3/4 R -410A 37.5 "x34.5 "x54" 266 LBS AHU -1 TAM7AOB3OH21 1/208/60 1 44.0 45A 1 36.4 1 27.3 1000 18.0 1 13,0 1 21.5 "x22 "x56" 138 LBS SEE NOTES VARIABLE AIR VOLUME TERMINAL UNIT (VAV BOX) SCHEDULE (BASED ON TITUS) TAG MODEL VOLTS CFM RANGE WxDxH COMMENTS VAV -04 AESV -04 1/120/60 0 -225 40 "x20 "x14" SEE NOTES VAV -05 AESV -05 1/120/60 0 -350 40 "x20 "x14" SEE NOTES VAV -06 AESV -06 1/120/60 0 -500 40 "x20 "x14" SEE NOTES VAV -07 AESV -07 1/120/60 0 -650 40 "x20 "x14" SEE NOTES VAV -08 AESV -08 1/120/60 0 -900 40 "x20 "x14" SEE NOTES VAV BOX NOTES: 1. BASIS OF DESIGN IS TITUS. FOR ORDERING INFORMATION CONTACT KEITH MILLER AT CORS -AIR, 954 - 456 -4300, 2. VAV BOXES SHALL BE PRESSURE INDEPENDENT WITH INTEGRAL MULTIPOINT VELOCITY SENSOR FOR BALANCING. 3. BOXES SHALL BE BALANCED AS FOLLOWS: MAXIMUM AS SHOWN (SUM OF SUPPLY GRILLES); MINIMUM AT 30% OF MAXIMUM, 4. FURNISH INTEGRAL ELECTRIC ACTUATOR, ANALOG CONTROL, AND ELECTRONIC PROPORTIONAL ROOM THERMOSTAT. 5. CONTRACTOR TO COORDINATE ALL EQUIPMENT LEAD ITEMS TO ALLOW UNINTERRUPTED CONSTRUCTION SCHEDULE. 6. VAV BOXES TO BE PROVIDED WITH ACTUATOR AND DDC CONTROLLER PREINSTALLED FROM THE FACTORY. 7, ALL VAV BOXES AND CONTROLS SHALL BE NEW DDC TYPE BY THE BOX MANUFACTURER, CONTROLS SHALL BE INTEGRATED WITH THE BUILDING SYSTEM AS REQUIRED TO PROVIDE A FULLY FUNCTIONING SYSTEM, COORDINATE OVERRIDES, FAIL SAFE POSITIONS AND SIMILAR REQUIREMENTS, IF ANY, WITH BUILDING MANAGEMENT AND ORIGINAL BASE BUILDING CONSTRUCTION DOCUMENTS. 8. VERIFY ALL QUANTITIES PRIOR TO ORDERING. QUANTITY BASED ON FLOOR PLAN, NOT SCHEDULE, 9. COORDINATE ELECTRICAL DATA WITH MANUFACTURER AND ELECTRICAL CONTRACTOR PRIOR TO ORDERING, 10. PROVIDE VAV BOXES WITH BUILT -IN ELECTRICAL DISCONNECT. 2 HVAC SCHEDULES Not to Scale PROVIDE FOR NEW CEILING HEIGHTS AS NOTED ON ARCHITECTURAL PLANS, ALL AREAS WITH STRUCTURAL BEAMS HAVE LOWER CEILINGS, CONTRACTOR TO PERFORM SITE VISIT TO DETERMINE ALL OFFSET POINTS, THIS DUCT SYSTEM ALSO SERVES OTHER TENANTS; COORDINATE AFTER -HOURS SCHEDULING WITH LANDLORD AND MINIMIZE SYSTEM DOWNTIME DURING STANDARD WORKING HOURS, ALL EXISTING TAKEOFFS, VAV BOXES AND LOW PRESSURE DUCTWORK (LPD) SHALL BE REMOVED FROM THIS TENANT SPACE; ALL SHOWN HERE ARE NEW. MPD DUCTWORK SHALL BE PATCHED AND REPAIRED AS NECESSARY, O NEW MPD ROUND TAKEOFF TO SERVE NEW VAV BOX. TAKEOFF TO MATCH VAV INLET DIMENSION. REFER TO SCHEDULE FOR VAV SPECIFICATIONS. VAV BOXES SHALL BE LOCATED ABOVE 2x2 LAY -IN CEILINGS AND, AS SHOWN, SHALL HAVE MINIMUM 48" STRAIGHT DUCT ON INLET AND OUTLET SIDES BEFORE ANY BENDS OR DUCT TAKEOFFS. O AFTER DEMOLITION OF CEILINGS, CONTRACTOR SHALL FIELD VERIFY ANY EXISTING VALVES, JUNCTION BOXES, CONTROL POINTS OR OTHER DEVICES REQUIRING ACCESS LOCATED ABOVE THE NEW HARD CEILING AREA. PROPOSE ACCESS PANELS OR RELOCATE DEVICES ABOVE 2X2 LAY -IN CEILING, O PROVIDE ACCESSIBLE TAB COLLAR WITH INTEGRAL MANUAL VOLUME BALANCING DAMPER (SPIN -IN) WHEN SHOWN, O THIS IS A RETURN AIR PLENUM AS PER THE ORIGINAL DESIGN. NO COMBUSTIBLE MATERIALS ALLOWED IN THE PLENUM. ALL EXISTING WOOD FRAMING, PVC PIPING AND SIMILAR COMBUSTIBLE MATERIALS MUST BE REMOVED FROM THE PLENUM PRIOR TO OCCUPANCY. O NEW SPLIT DX AHU FOR SUPPLEMENTAL (OFF - HOURS) COOLING. TIE CONDENSATE TO EXISTING RISER IN ADJACENT MAIN VAV AHU ROOM. FIELD COORDINATE MOUNTING ELEVATION OF NEW AHU TO ALLOW GRAVITY DRAINAGE; SEE PLUMBING PLANS FOR CONDENSATE ROUTING. RETURN MUST BE DUCTED TO ROOM; RETURN SHALL NOT DRAW FROM PLENUM, PROVIDE FILTER RACK AT BACK OF UNIT. FIELD COORDINATE EXACT LOCATION FOR ACCESS. O PROGRAMMABLE THERMOSTAT. COORDINATE OPTIONS WITH TENANT, COOLING SETPOINT TO BE 2°F WARMER THAN THE VAV THERMOSTAT. ® VAV BOX THERMOSTAT, COORDINATE OPTIONS WITH TENANT AND LANDLORD. Og RECONNECT NEW TOILET EXHAUST FAN TO EXISTING EXHAUST DUCTWORK FROM PREVIOUS RESTROOM FAN IN THIS AREA. NOTIFY ENGINEER OF DISCREPANCIES PRIOR TO PROCEEDING. 10 THIS PARTITION WALL EXTENDS ALL THE WAY TO UNDERSIDE OF ROOF DECK. PROVIDE 12x6 CLEAR OPENING IN PARTITION WALL ABOVE CEILING FOR RETURN AIR PATH, NOTIFY 'ENGINEER IF ANY OTHER WALLS EXTEND UP TO DECK. 11 NEW SPLIT DX ACCU FOR SUPPLEMENTAL (OFF - HOURS) COOLING, INSTALLED ON SIDEWALL OF ELEVATOR SHAFT AT ROOF LEVEL. COORDINATE INSTALLATION WITH LANDLORD. COORDINATE EXACT LOCATION AND ANCHORING METHODS WITH STRUCTURAL ENGINEER, 12 FIELD COORDINATE REFRIGERANT PIPING ROUTING, NOT TO EXCEED 100'. WIDTH x HEIGHT NEW RIGID FIBERGLASS DUCTWORK NEW MEDIUM PRESSURE ROUND DUCTWORK (VAV TAKEOFFS) NEW FLEXIBLE DUCTWORK SQUARE TO ROUND TRANSITION SQUARE TO SQUARE TRANSITION REFRIGERANT PIPING; SUC INSULATED r ` THERMOSTAT 3 -GORE 90 BEND 45° ROUND JUNCTION ® SQUARE CEILING SUPPLY DIFFUSER ® SQUARE CEILING RETURN GRILLE CEILING EXHAUST FAN POINT OF CONNECTION THESE PLANS ARE FOR BUILDING DEPARTMENT REVIEW ONLY. THEY ARE NOT TO BE CONSTRUED AS CONSTRUCTION DOCUMENTS UNTIL ALL BUILDING DEPARTMENT APPROVALS ARE OBTAINED. PROJECT #: 1245 RCI C.A. #: 27662 Engineering, inc. 5450 GRIFFIN ROAD SUITE A, DAVIE, FL 33314 P:954.680.2690 F:954.414.9393 www.rcieng.com a41191iJ'�i R J tN D COLDWELL ' E t- ift67 7`d a",, SE BE ,E�1,;< 0 a l fs. VK Ofer Stark, AIA Ucem�e #AP96196 c� V O 11--dri 4v Drawn By: OS Checked By: OS Date 07 -23 -2012 Revisions Z O H Q O z W M Q W uJ F_ ♦ ♦ ♦ ♦ L] �l ti M M V L2 l.i L M 11 • • V LLI N >_ L.L �" LL W O J z LL- U G N HVAC PLAN AND SCHEDULES Project No: 6280603 mmi so kv'