12-952-015OI
SL
W/
COMMON UNISEX UNISEX
WOMEN MEN'S AREA TOILET TOILET STORAGE OFFICE #2
1
HVAC PLAN
Scale: 1/4" = V -0"
HVAC UNIT SCHEDULE (BASED ON TRANE)
CU
MODEL
VOLTS
MCA
MOCP
LIQ
SUC
I REFRIG
WxDxH
WEIGHT
AHU
MODEL
VOLT
MCA
MOCP
FULL QT
FULL. QS
FULL CEM
SEER
EER
WxDxH
WEIGHT
COMMENTS
CU -1
4TTX6036G1
1/208/60
22.0
35A
3/8
3/4
R -410A
37.5 "x34.5 "x54"
266 LBS
AHU -1
TAM7AOB3OH21
1/208/60
1 44.0
45A
1 36.4
1 27.3
1000
18.0
1 13,0
1 21.5 "x22 "x56"
138 LBS
SEE NOTES
VARIABLE AIR VOLUME TERMINAL UNIT (VAV BOX) SCHEDULE
(BASED ON TITUS)
TAG
MODEL
VOLTS
CFM RANGE
WxDxH
COMMENTS
VAV -04
AESV -04
1/120/60
0 -225
40 "x20 "x14"
SEE NOTES
VAV -05
AESV -05
1/120/60
0 -350
40 "x20 "x14"
SEE NOTES
VAV -06
AESV -06
1/120/60
0 -500
40 "x20 "x14"
SEE NOTES
VAV -07
AESV -07
1/120/60
0 -650
40 "x20 "x14"
SEE NOTES
VAV -08
AESV -08
1/120/60
0 -900
40 "x20 "x14"
SEE NOTES
VAV BOX NOTES:
1. BASIS OF DESIGN IS TITUS. FOR ORDERING INFORMATION CONTACT KEITH MILLER AT CORS -AIR, 954 - 456 -4300,
2. VAV BOXES SHALL BE PRESSURE INDEPENDENT WITH INTEGRAL MULTIPOINT VELOCITY SENSOR FOR BALANCING.
3. BOXES SHALL BE BALANCED AS FOLLOWS: MAXIMUM AS SHOWN (SUM OF SUPPLY GRILLES); MINIMUM AT 30% OF MAXIMUM,
4. FURNISH INTEGRAL ELECTRIC ACTUATOR, ANALOG CONTROL, AND ELECTRONIC PROPORTIONAL ROOM THERMOSTAT.
5. CONTRACTOR TO COORDINATE ALL EQUIPMENT LEAD ITEMS TO ALLOW UNINTERRUPTED CONSTRUCTION SCHEDULE.
6. VAV BOXES TO BE PROVIDED WITH ACTUATOR AND DDC CONTROLLER PREINSTALLED FROM THE FACTORY.
7, ALL VAV BOXES AND CONTROLS SHALL BE NEW DDC TYPE BY THE BOX MANUFACTURER, CONTROLS SHALL BE INTEGRATED
WITH THE BUILDING SYSTEM AS REQUIRED TO PROVIDE A FULLY FUNCTIONING SYSTEM, COORDINATE OVERRIDES, FAIL SAFE
POSITIONS AND SIMILAR REQUIREMENTS, IF ANY, WITH BUILDING MANAGEMENT AND ORIGINAL BASE BUILDING CONSTRUCTION
DOCUMENTS.
8. VERIFY ALL QUANTITIES PRIOR TO ORDERING. QUANTITY BASED ON FLOOR PLAN, NOT SCHEDULE,
9. COORDINATE ELECTRICAL DATA WITH MANUFACTURER AND ELECTRICAL CONTRACTOR PRIOR TO ORDERING,
10. PROVIDE VAV BOXES WITH BUILT -IN ELECTRICAL DISCONNECT.
2 HVAC SCHEDULES
Not to Scale
PROVIDE FOR NEW CEILING HEIGHTS AS NOTED ON
ARCHITECTURAL PLANS, ALL AREAS WITH STRUCTURAL BEAMS
HAVE LOWER CEILINGS, CONTRACTOR TO PERFORM SITE VISIT TO
DETERMINE ALL OFFSET POINTS, THIS DUCT SYSTEM ALSO
SERVES OTHER TENANTS; COORDINATE AFTER -HOURS
SCHEDULING WITH LANDLORD AND MINIMIZE SYSTEM DOWNTIME
DURING STANDARD WORKING HOURS, ALL EXISTING TAKEOFFS,
VAV BOXES AND LOW PRESSURE DUCTWORK (LPD) SHALL BE
REMOVED FROM THIS TENANT SPACE; ALL SHOWN HERE ARE
NEW. MPD DUCTWORK SHALL BE PATCHED AND REPAIRED AS
NECESSARY,
O NEW MPD ROUND TAKEOFF TO SERVE NEW VAV BOX. TAKEOFF
TO MATCH VAV INLET DIMENSION. REFER TO SCHEDULE FOR
VAV SPECIFICATIONS. VAV BOXES SHALL BE LOCATED ABOVE
2x2 LAY -IN CEILINGS AND, AS SHOWN, SHALL HAVE MINIMUM
48" STRAIGHT DUCT ON INLET AND OUTLET SIDES BEFORE ANY
BENDS OR DUCT TAKEOFFS.
O AFTER DEMOLITION OF CEILINGS, CONTRACTOR SHALL FIELD
VERIFY ANY EXISTING VALVES, JUNCTION BOXES, CONTROL
POINTS OR OTHER DEVICES REQUIRING ACCESS LOCATED ABOVE
THE NEW HARD CEILING AREA. PROPOSE ACCESS PANELS OR
RELOCATE DEVICES ABOVE 2X2 LAY -IN CEILING,
O PROVIDE ACCESSIBLE TAB COLLAR WITH INTEGRAL MANUAL
VOLUME BALANCING DAMPER (SPIN -IN) WHEN SHOWN,
O THIS IS A RETURN AIR PLENUM AS PER THE ORIGINAL DESIGN.
NO COMBUSTIBLE MATERIALS ALLOWED IN THE PLENUM. ALL
EXISTING WOOD FRAMING, PVC PIPING AND SIMILAR
COMBUSTIBLE MATERIALS MUST BE REMOVED FROM THE PLENUM
PRIOR TO OCCUPANCY.
O NEW SPLIT DX AHU FOR SUPPLEMENTAL (OFF - HOURS) COOLING.
TIE CONDENSATE TO EXISTING RISER IN ADJACENT MAIN VAV
AHU ROOM. FIELD COORDINATE MOUNTING ELEVATION OF NEW
AHU TO ALLOW GRAVITY DRAINAGE; SEE PLUMBING PLANS FOR
CONDENSATE ROUTING. RETURN MUST BE DUCTED TO ROOM;
RETURN SHALL NOT DRAW FROM PLENUM, PROVIDE FILTER
RACK AT BACK OF UNIT. FIELD COORDINATE EXACT LOCATION
FOR ACCESS.
O PROGRAMMABLE THERMOSTAT. COORDINATE OPTIONS WITH
TENANT, COOLING SETPOINT TO BE 2°F WARMER THAN THE VAV
THERMOSTAT.
® VAV BOX THERMOSTAT, COORDINATE OPTIONS WITH TENANT
AND LANDLORD.
Og RECONNECT NEW TOILET EXHAUST FAN TO EXISTING EXHAUST
DUCTWORK FROM PREVIOUS RESTROOM FAN IN THIS AREA.
NOTIFY ENGINEER OF DISCREPANCIES PRIOR TO PROCEEDING.
10 THIS PARTITION WALL EXTENDS ALL THE WAY TO UNDERSIDE OF
ROOF DECK. PROVIDE 12x6 CLEAR OPENING IN PARTITION WALL
ABOVE CEILING FOR RETURN AIR PATH, NOTIFY 'ENGINEER IF
ANY OTHER WALLS EXTEND UP TO DECK.
11 NEW SPLIT DX ACCU FOR SUPPLEMENTAL (OFF - HOURS)
COOLING, INSTALLED ON SIDEWALL OF ELEVATOR SHAFT AT
ROOF LEVEL. COORDINATE INSTALLATION WITH LANDLORD.
COORDINATE EXACT LOCATION AND ANCHORING METHODS WITH
STRUCTURAL ENGINEER,
12 FIELD COORDINATE REFRIGERANT PIPING ROUTING, NOT TO
EXCEED 100'.
WIDTH x HEIGHT
NEW RIGID FIBERGLASS DUCTWORK
NEW MEDIUM PRESSURE ROUND
DUCTWORK (VAV TAKEOFFS)
NEW FLEXIBLE DUCTWORK
SQUARE TO ROUND TRANSITION
SQUARE TO SQUARE TRANSITION
REFRIGERANT PIPING; SUC INSULATED
r `
THERMOSTAT
3 -GORE 90 BEND
45° ROUND JUNCTION
®
SQUARE CEILING SUPPLY DIFFUSER
®
SQUARE CEILING RETURN GRILLE
CEILING EXHAUST FAN
POINT OF CONNECTION
THESE PLANS ARE FOR BUILDING DEPARTMENT
REVIEW ONLY. THEY ARE NOT TO BE CONSTRUED AS
CONSTRUCTION DOCUMENTS UNTIL ALL BUILDING
DEPARTMENT APPROVALS ARE OBTAINED.
PROJECT #: 1245
RCI C.A. #:
27662
Engineering, inc.
5450 GRIFFIN ROAD SUITE A, DAVIE, FL 33314
P:954.680.2690 F:954.414.9393 www.rcieng.com
a41191iJ'�i
R J tN D COLDWELL '
E t- ift67 7`d
a",, SE BE ,E�1,;<
0 a l fs. VK
Ofer Stark, AIA
Ucem�e #AP96196
c�
V
O
11--dri
4v
Drawn By: OS
Checked By: OS
Date 07 -23 -2012
Revisions
Z
O
H
Q
O
z
W
M
Q
W
uJ
F_
♦
♦
♦
♦
L]
�l
ti
M
M
V
L2
l.i
L
M
11 •
•
V
LLI
N >_
L.L
�" LL
W O
J
z LL-
U G
N
HVAC PLAN
AND
SCHEDULES
Project No: 6280603
mmi so
kv'