Loading...
12-952-001SUITE C -MRA PROMED PROPERTIES 6280 SUNSET DRIVE MIAMI, FL 33143 07/23/2012 PERMIT SET V 0 0 CITY OF� '5'0U_FH A41AA0., WJILDING DEP-J. !-3TRU-C-1-U 1 SECTI()pq Jj'�-�PROVC-o fly, IV KEYS AND SYMBOLS Mot Vitcs" A 31 --- 0 0 1. Work performed shall comply with the following, L V 0 0 CITY OF� '5'0U_FH A41AA0., WJILDING DEP-J. !-3TRU-C-1-U 1 SECTI()pq Jj'�-�PROVC-o fly, IV KEYS AND SYMBOLS GENERAL NOTES 31 --- 0 0 1. Work performed shall comply with the following, L V 0 0 CITY OF� '5'0U_FH A41AA0., WJILDING DEP-J. !-3TRU-C-1-U 1 SECTI()pq Jj'�-�PROVC-o fly, IV KEYS AND SYMBOLS GENERAL NOTES .1 DIMENSION --- 1. Work performed shall comply with the following, (face to face) 11 F CLG CLG CEILING TAG a. These general notes (unless otherwise noted on plans or 15. Omissions: 30. Schedule of values: INDEX OF DRAWINGS specifications). In the event that certain features of the construction are not fully shown on General contractor shall submit a detailed cost breakdown "schedule of values" in COVER -INDEX OF DRAWINGS DIMENSION ( Dt KEYNOTE REFERENCE b. Florida Building Code - 2010. the drawings, then their construction shall be of the same character as for the form of AIA G702 prior to the first payment. This schedule of values shall ARCHITECTURAL SGale (face to center) c. All applicable local and state codes, ordinances, and regulations. similar conditions that are shown or noted. closely follow the standard CSI format, and shall breakdown units of work A0.1 LIFE SAFETY PLAN F WD-02 FINISH KEY d. National Electric Code OSHA & NFPA 101, Underwriters Laboratory completed. The breakdown shall be a true reflection of the cost of the work and A0.2 ADA DIAGRAMS & NOTES NA DIMENSION f 16. It shall be the contractor's responsibility to notify the owner, of the proper shall not be front-end loaded. The schedule of values shall be subject to the A1.0 DEMOLITION PLAN (center to center) DIMENSION STRING FLOOR MATERIAL TRANSITION 2. On site verification of all dimensions and conditions shall take time so that he can obtain an environmental report from multidisciplinary architect's approval. Retailage shall be 10% and shall be held until substantial A2.0 CONSTRUCTION FLOOR PLAN 1/4"=V-0" A3.0 REFLECTED CEILING PLAN 114"=1' -0" 40 precedence over scaled dimensions It is the responsibility of the environmental firm) stating that the entire site (subsurface conditions) and completion of work. A4.0 POWER PLAN 1/4 "= 1' -0'° COLUMN COLUMN OR BEARING WINDOW REFERENCE general contractor to notify the Architect, in writing of any discrepancies existing building is free of hazardous materials and in compliance with all A5.0 FINISH PLAN 1/4"=V-0" WALL CENTERLINE and inconsistencies. environmental regulations,, If asbestos or any other hazardous material is 31. Construction schedule: A6.0 SCHEDULES AS NOTED 4 CT:LT �-03 PLUMBING FIXTURE /ACCESSORY detected or present, it shall be the owner's responsibility to remove these Prior to the first payment the contractor shall provide a schedule of the A6.1 SCHEDULES AS NOTED * A7.0 ENLARGE BATHROOM PLANS & ELEVATIONS 3/4"=V-0" 0 ,AB PARTITION TYPE 3. The general notes and typical details apply throughout the job unless materials conforming to all rules and regulations regarding its proper construction work, indicating critical path items, dates of submittal, and dates of A7.1 ENLARGE BATHROOM PLANS & ELEVATIONS 3/4"=V-0" 0 (:tNA83) FURNITURE ITEM otherwise noted or shown in the drawing (or described), in the removal. project meetings. Schedule shall indicate each individual subcontractor and -- c9 DOOR NUMBER specifications. component of work. Contractor shall allow ten (10) working days for architect's A8.0 MILLWORK 3/4"=11-011 A8.1 MILLWORK 3/4"=1" -0" 40 EXTERIOR ELEVATION TAG 17. Altering structural members: no structural member shall be omitted, review of all submittals. Schedule shall be subject to the architect's approval. F MECHANICAL R MM1 2 R 4. All conditions and applicable requirements of the contract between the notched, cut, blocked out, or relocated without prior written approval by the Schedule shall be updated on a monthly basis as a prerequisite to payments RM3 NUM ROOM NAME AND NUMBER /-6\ contractor and owner shall govern all sections of the specifications. architect and structural engineer. - M1.0 HVA P A SCHEDULES Fq 1/4"=11_011 r2 NA.67 IV SECTION CUT �5� 4FA6 5 INTERIOR ELEVATION TAG 5. All work that is either implied or reasonably inferable from the contract 18. ma s use e new an e job All materials shall be delivered to the in original sealed 32. Hurricane protection compliance: Provide a hurricane panel system for each window opening fully complying with M2.0 HVAC NOTES & DETAILS NA documents or drawings shall be the responsibility of the contractor. All containers bearing original manufacturer's labels; Contractor shall the most current Florida Building Code requirements. Submit shop drawings and vAffi M M4 DETAIL BUBBLE REVISION KEY drawings are directed to the attention of the Contractor and the inclusion coordinate with the owner an acceptable location for the storage of computations by a Florida registered engineer for review and approval by the ELECTRICAL of any work by mention, note, or detail, itemization or implications materials. architect. E1.0 ELECTRICAL LIGHTING PLAN 1/4"=1' -0" • E1.1 ELECTRICAL POWER PLAN 1/4"=V-0" y4\ however brief means the contractor shall provide and install same. All E2.0 ELECTRICAL RISER, NOTES & DETAILS NA 'Pam mm wO TA TA work to be performed part of a completed package within the normal 19. All colors shall be as selected by the owner/architect. 33. The general contractor shall pay for all utilities necessary during the construction 0-i definitions definitions of normal industry standards. 0 f the project. PLUMBING 20. The general contractor shall leave all chases, holes, and openings true to ABBREVIATIONS 6. It shall be the General Contractor's responsibility to control and the required size whether it be for the existing building or the new work, so 34. Due diligence: P1.0 PLUMBING PLAN & RISERS 1/4"= 1' -0'° coordinate all construction means, methods, and sequences. The the proper installation of building elements may be executed with minimum It is the responsibility of the contractor to thoroughly examine the existing P2.0 PLUMBING NOTES & DETAILS NA @ A.B. AT INSUL. INSULATION General Contractor shall also be responsible for all safety precautions waste. Excess cutting and drilling will not be accepted nor shall any condition of the structural components of the project. This shall require the ACT.JACOUS. ANCHOR BOLT ACOUSTICAL INT. INTERIOR and programs as per OSHA Regulations. structural members be cut or removed without the consent of the architect. contractor to selectively open up areas exposing the condition of the masonry FIRE PROTECTION ALT. ALUM. ALTERNATE ALUMINUM J.C. JT, JANITOR'S CLOSET JOINT The general contractor shall be fully responsible for the coordination of all shell and the wood-framing members. Careful examination shall be made of all FS1.0 FIRE SPRINKLER PLAN 1/4"=V-0" ARCH. ARCHITECTURAL 7. Notice: separate permits required for fire protection, plumbing, electrical, preparation and work executed by all trades and subcontractors regardless masonry components including but not limited to reinforced concrete tie beams & A.T. ACOUSTICAL TILE LAV. L.C.C. LAVATORY LEAD COATED COPPER and mechanical work: Air conditioning and ventilation permit to be the of whether contracted by him or the owner under a separate contract. lintels at each window/door opening as well as each floor, roof, & parapet level ZONING DATA: BID. BOARD LIN. LINEAR BLDG. BUILDING L.L. LIVE LOAD responsibility of the mechanical contractor and his sub - Contractors, and reinforced concrete tie columns. In addition, careful examination shall be BM. BEAM L.P. (LP) LOW POINT 21. All work by the general contractor shall be performed in a first class made of all wood components including but not limited to -floor, roof & ceiling B.O. BRNG.16RG. BY OWNER BEARING 8. The contractor shall coordinate the work of all trades: structural, fire workman-like manner, matching and aligning all surfaces where applicable joists, wood studs, wood subfloors, wood finish floors, w6od roof sheathing, etc. It LOT AREA: 61,425 S.F. BRK. BRICK MACH. MAX. MACHINE MAXIMUM protection, electrical, mechanical, air conditioning, and plumbing at the to afford a finished, neat appearance. Contractor shall clean all surfaces is the contractor's responsibility to repair, replace, and/or construct new up to LEGAL DESCRIPTION: 36 54 40 WM A HOBBS SUB PB 4-111 LOTS 33 THRU 38 LESS B3 M T. B.U. BASEMENT BUILT-UP M.B. M&E MARKEBOARD MECHA. LECTRICAL time the work is performed on this structure. free of all dirt and refuse caused by debris from all installation techniques of 100% of all structural elements whether existing or not, at his cost, to the written N25FT OF LOT 38 FOR R1W & LOT 3 OF BEAVER HOMEsrrES MECH. MECHANICAL the trade. All adjacent surfaces to their work shall be left as they appear certification of a structural engineer registered in the state of Florida. PB 41-69 & E120FT OF S85FT OF N135FT OF NW114. C.B. CEIL./CLG. CHALKBOARD CEILING MET./METL.IMET'L. METAL 9. All permits, inspections, approvals, impact fees, etc. shall be applied for prior to the commencement of the contractor work to be done. Contractor FOLIO No: 09-4036-040-0210 C.H. CEILING HEIGHT MIN. misc. MINIMUM MISCELLANEOUS and paid for (as part of bid price) by the contractor in all fields of the shall properly protect all adjacent surfaces during the course of his 35. After all roofing, carpentry, and millwork has been completed and prior to painting CLASS/OCCUPANCY: GROUP B (COMMERCIAL OFFICE) C,J, CL CONTROL JOINT CENTERLINE MFG. M.T. MANUFACTURER work, and he shall be responsible for the coordination of inspection and installations. All glass and hardware shall be thoroughly cleaned in a the building exterior, the contractor is responsible to have a licensed examinator CLO. CMU CLOSET CONCRETE MAR.T. METAL THRESHOLD MARBLE THRESHOLD approval of the work. The General Contractor shall obtain prime manner acceptable to the owner. examine and prepare a written report making a recommendation of necessary APPLICABLE CODES: MASONRY UNIT MULL. M.O. MULLION MASONRY OPENING building permits. treatment if any. The treatment shall be inclusive in bid. C.O. COL CASED OPENING M.W.P. MEMBRANE WATERPROOFING 22. The contractor shall guarantee ion writing form, as acceptable to the owner, FLORIDA BUILDING CODE (2010).& SUPPLEMENTS CONC. COLUMN CONCRETE N NORTH 10. Submit a copy of the permit contract documents issued by the building all labor and materials installed by him for a period of not less than (1) year 36. Prior to the rough in of mechanical, electrical, and plumbing work the contractor NFPA 101 (CURRENT EDITION) CONF. CONST. CONFERENCE CONSTRUCTION N.I.C. NOT IN CONTRACT department to the architect, so that all comments and modifications can after the date of acceptance of work by the owner except as modified herein shall finish the structural masonry & wood repair. When the repair/replacement FLORIDA ACCESSIBILITY CODE FOR BUILDING. CONT. CONTINUOUS N.T.S. NO. NOT TO SCALE NUMBER be incorporated into the permit set prior to the start of construction. or on other drawings. Should defects occur, all work should be replaced or work is complete, the contractor shall layout the base track of all partitions for NOTE: IN ADDITION, ALL WORK IS TO CONFORM TO CORR. CSK. CORRIDOR COUNTERSUNK NOM. NOMINAL properly repaired at no additional cost to the owner. review by the architect for dimensional discrepancies between the plans and APPLICABLE TRADE CODES, LAWS & REGULATIONS. C.T. CERAMIC TILE O.C. ON CENTER 11. All work, completed or otherwise, shall be properly protected at all existing conditions. When the architect approves the final layout, then the DET. DETAIL O.D. OPP. OUTSIDE DIAMETER OPPOSITE times, Contractor shall follow all accepted methods of safety practice 23. All required tests shall be performed at the expense of the contractor and contractor is permitted to proceed with the rough in of mechanical, electrical, and HANDICAPPED COMPLIANCE: D.F. DIA. DRINKING FOUNTAIN and provide all safety fences, barricades, etc. as be needed to protect by an approved testing laboratory. Test results shall be submitted to the plumbing work. THIS PROJECT WILL BE BARRIER FREE SPACE AS PER DIAMETER PL. PLATE DIM. DIMENSION life and property and as may be required by authorities having architect. DN. DO DOWN DITTO PSF PSI PTD. POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAINTED jurisdiction over this work. He shall repair, at his own cost, any 37. For the purpose of the contract documents, "approved equal" items shall be FLORIDA ACCESSIBILITY CODE SECTION 4.1.6. (ACCESSIBLE BUILDING ALTERNATIONS). D.P. DAMP PROOFING damages to the premises or adjacent work caused by his operation.) 24. All work and/or materials shall be installed in strict accordance with submitted for review and approval by the architect; all requests for approval shall D.S. D.T. DOWN SPOUT DRAIN TILE Q.T. R.1RAD. QUARRY TILE RADIUS/RISER manufacturer's recommendations and within acceptable industry standards be made in writing by the general contractor to the architect. TO THE BESTOF MY BELIEF & KNOWLEDGE THE EXISTING DWG. DRAWING RAIL. RAILING 12, Path and repair all finishes damages during the course of this work, fill and tolerances. BUILDING & PARKING LOT IS BARRIER FREE AS PER EA. EACH R.D. REBARS ROOF DRAIN REINFORCING BARS around new piping and conduits with concrete. Sea[ all holes and gaps. 38. Any inspections required by section 307.2 of the F.B.C. by the architect/engineer FLORIDA ACCESSIBILITY CODE. EL. ELEV. ELEVATION REINF. REINFORCEMENT New finishes at cut and patched areas shall match existing adjacent 25. Five copies of shop drawings and samples for items designated by the of record, special inspector and/or threshold inspector shall be coordinated by the E.P. ELEVATOR ELECTRICAL PANEL R.L. AND/OR REINFORCING RAIN LEADER finishes with no noticeable difference. architect shall be submitted to the architect for review. general contractor with adequate time prior to the Building Department's FEATURES OF­F­I-R PR-(:�TECTION: EQ. EQUIPM'T E.W. EQUAL EQUIPMENT EACH WAY RM. R.S. RM ROOM REDUCING STRIP RIGHT OF WAY 13. Before commencing with the work, the contractor shall file with the 26. Substantial completion shall be attained where all phases of the work are inspections. This will allow for all required parties involved to issue a "statement ofin inspection'" to the Building Official prior to requesting final certificates of BUILDING IS: SPRINKLERED EXIST./EXS. EXP. JT./E.J. EXISTING EXPANSION JOINT S.C. SOLID CORE owner current insurance certifications in the amounts requested by the completed and a temporary C.O. is obtained from the building department I occupancy or co completion by the general contractor. EMERGENCY LIGHTING: BATTERY BACKUP EXT. EXTERIOR SEC. SECRETARY owner for workmen compensation, comprehensive general liability, at which time the A/E will conduct a walkthrough to develop a punch list. FIRE ALARM SYSTE EXISTING SYSTEM TO R�EMALIN E.I.F.S. EXTERIOR INSULATION SHT. S.F. SHEET SMOOTH FINISH bodily injury, and property damage. It is the intention of the parties that This punch list will be considered negotiated with release excluding all final SMOKE EVAC. NONE SYST M.. & FINISH SYSTEM SPECS. SPECIFICATIONS the contractor shall indemnify the owner and architect for any and all punch list items, regardless of owner's usage or occupancy of the F.D. F.X.C. FLOOR IN FIRE EXTING. CABINET S.S. S/S STL. STAINLESS STEEL SERVICE SINK STEEL costs, claims, suits, and judgments for property damage and personal improvement. Building Owner Tenant OCCUPANCT--%..,LAS- S-IF I AT 10 N: F.X.H.C. FIRE EXTINGUISHER injury, arising out of the work of the contractor. F.X.V.C. & HOSE CABINET FIRE EXTINGUISHER STOR. STRUCT. STORAGE STRUCTURE 27. No claims for extras or change orders will be given consideration unless ProMed Properties Miami Research Associates GROUP B - COMMERCIAL OFFICE F.F. & VALVE CABINET FINISHED FLOOR T.B. TEL. TOWEL BAR TELEPHONE 14. Discrepancies: The familiarize himself they are in writing and signed by the architect, the contractor, and the 6280 Sunset Drive 6141 Sunset Drive, Ste. 301 USEABLE SQ. FT. = 3,800 SF FLR./FL. FLOOR general contractor shall the project and the owner. LIFE SAFETY OCC. F.R. FIRE RATED TEMP. THK. TEMPERED THICK drawings and thoroughly inspect the site so as to understand the work. Suite 300 Miami, FL 33143 LOAD (NFPA 101) & GA. G.B. GAUGE GRAB BARS T.D. T.P. PAPER TOWEL DISPENSER TOILET PAPER HOLDER Any and all discrepancies and omissions shall be reported to the 28. "The general conditions of the contract for the construction of buildings" of Miami, FL 33143 FBC (TABLE 1004.1.2): 1 PERSON PER 100 SQ. FT. OF GROSS FLOOR AREA G.C. (HANDICAPPED) GENERAL CONTRACTOR TYP. TYPICAL architect in writing prior to commencement of any work. It is the the AIA, Document A-201, latest edition, are hereby made part of contract 3,800 SF / 100 = 38 PERSONS GALV. GALVINIZED U.C. UNDER CUT responsibility of the contractor to insure that discrepancies and documents. These general notes, specifications, and contract between the GIRD. GYP. BD. GROUND GYPSUM BOARD V.B. VAPOR BARRIER omissions are reported and clarification obtained from the architect prior owner and contractor shall take precedence over the "general conditions" in MEP Engineer Architect GENERAL DATA V.C.T. VINYL COMPOSITION TILE to work being done. Any work that proceeds otherwise shall be, if the event of a conflict. H.C. HDCP. HGT./HT. HOLLOW CORE HANDICAPPED HEIGHT VERT. V.P. VERTICAL VISION PANEL incorrectly performed, replaced or repaired with the cost of the same RCI Engineering, INC. Starkitect Studio Inc. LOCATION 6280 SUNSET DRIVE, MIAMI, FL 33179 SUMMARY INTERIOR BUILDOUT OF IN AN EXIST. OFFICE BLDG. H.M. HOLLOW METAL being borne by the contractor. All dimensions shall be field verified by 29. General contractor to secure all points of entry during construction and is to HORIZ. HORIZONTAL W1 WD_ WITH the General Contractor for coordination prior to work being done. coordinate with the owner means of egress of construction workers, 5450 Griffin Road, 4691 SW 34th Terrace BUILDING EXISTING 6 STORY COMMERCIAL OFFICES BUILDING WOOD H.P. (FIP) HIGH POINT W.P. WATERPROOFING HR HOUR materials, supplies, equipment, trash, etc. Davie, FL 33314 Fort Lauderdale, FL 33312 W.W.F. WELDED WIRE FABRIC RENOVATION AREA 3,800 USF (T) 954.680.2690 (T) 908.890.0005 207 D jA