Loading...
09-424-028w ¢ U ° °w of ¢ cn N U CD LLJ o N z = ~Z w ° w o N ¢ +., LE ¢ z N O F— O z Of ¢N a ° � N z °z¢C, w wMQV) U �` U Z W 0 �ZOOw (%7 ° J LL J i= ¢ U_ OUG7�O �z FF - E5 W a N J C.: 0-- g U N 0 �vSZO� ry canz¢NLLjw Z�ZF_ F- ,y W °FZD m¢ tZ�°LLJ� LLJ W W a- J JF=—Q: S O¢OMcn TOP/130170M STEEL I BUM "_CLAIVP W/ LOCK NUT CENTER I BEAM OR BAR JOIST ALL THREADED LOAD • I I' _ HANGER ROD ALL THREADED HANGER ••r FASTENEPS ALL - EPS SHALL BE LISTED • • TIHEIR INTENDED SERVICE ALL THREADED HANGER ROD NUT CIJ =VIS HANG PIPE O.D. R PIPE LIP-RIGHT SP MZ2 HEAD I' TO SPRINIQ.ER HEAD COVER PLATE WHERE APPLICABLE ARMOVER DETAIL N.T.S. ALL THREADED HANGER ROD NUT — ADJUSTABLE SWIVEL LOOP HANGER PIPE PIPE HANGERS N.T.S. ALL HANGERS SHALL BE LISTED FOR THEIR INTEPDED SERVICE CONC. SLAB DROP ANCHOR ALL •._. HANGER' • • r ' MAY BE w1r,41umalivP r, -•• :r BY ENGINEER STRUCTURAL ALL C.• Cam• • • r` CLONa COUPLINGS BE PROVIDED WITH FACTORY APPLIED HOT DIPPED GALVANIZED FINISH FOR CORROSION PROTECTION 7 DIAMETER HOLE REOUR®, OR 2-5/8' 24V WHEN USING MINIMLIN COVE12 11697 DEFLECTOR FINISH® CEILING LINE WRENCH p • - «• _• CONCEALED PENDENT TYPE SPRINKLER HEAD MOUNTING DETAIL N.T.S. HANGER ROD SCHEDULE PIPE SIZE A B C D MAX. SPACING BETWEEN PIPE SUPPORT (FT) 1' 3/8' 31/2' 2 7/8' 11/8' 7 11/4' 3/8' 4' 31/4' 11/8' 8 11/7 3/8' 41/8' 3 3/16' 11/7 9 7 3/8' 4 3/4' 3 9/16' 11/7 10 21/2' 1/2' 5 5/8' 4 3/16' 15/8' II 3' I/2' 61/4' 41/2' 15/8' 12 31/7 I/2' 6 7/8' 4 7/8' 15/8' 13 4' 5/8' 8' 5 3/4' 13/4' 14 5' 5/8' 9 1/4' 6 3/8' 7 16 6' 3/4' 10 3/4' 71/7 7 17 8' 7/8' 151/4' 1 9 3/8' 121/8' 19 FIRE PROTECTION DEMOLITION NOTES: 1. SITE INVESTIGATION: THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING UTILITIES STUB -OUTS, PIPING, EQUIPMENT, ETC., AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK. ALL THE NECESSARY RE- ROUTING, RELOCATING AND /OR REMOVAL OF EXISTING PIPING, EQUIPMENT, ETC., SHALL BE INCLUDED IN THE SCOPE OF WORK. IGNORANCE ON THE PART OF THE CONTRACTOR WILL IN NO WAY RELIEVE HIM OF THE OBLIGATIONS AND RESPONSIBILITIES ASSUMED UNDER THIS CONTRACT. 2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGNER ENGINEERS AS WELL AS THE PLUMBING CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY, WHERE POSSIBLE, THE LOCATION OF THE EXISTING PLUMBING SYSTEMS. THE MAJOR PORTION OF THE PLUMBING SYSTEMS ARE AS SHOWN ON THE DRAWINGS, HOWEVER MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO ADVANTAGE IS TO BE TAKEN BY THE PLUMBING CONTRACTOR BECAUSE OF THESE MINOR DIFFERENCES. THE PLUMBING CONTRACTOR SHALL PERFORM A FIELD VERIFICATION BEFORE BIDDING THIS PROJECT. 3. CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING HIS DEMOLITION WORK WITH OTHER TRADES AND TO PROTECT FROM DAMAGE EXISTING PIPES USED FOR FUTURE CONNECTIONS. 4. EXISTING PIPE•' SERVING AREAS REMAINING IN SERVICE AT THIS TIME SHALL NOT BE ' �JTERRUPTED UNLESS A TEMPORARY INTERRUPTION IS COORDINATED ITH THE OWNER. 5. ALL SERVICE IN- TERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED REPRESENTATIVE OF THE OWNER. ALL REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AUTHORIZED REPRESENTATIVE OF THE OWNER. REPRESENTATIVE OF THE OWNER (MCH). THE CONTRACTOR MUST BE AWARE THAT, DUE TO THE LOCATION OF THE PROJECT, PORTIONS OF HIS WORK MUST BE PERFORMED AFTER HOURS. 6. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT PROPERTY IN AREAS WHERE WORK IS BEING CONDUCTED. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED TO BUILDING COMPONENTS DUE TO WORK OPERATIONS. PATCH AND REPAIR EXISTING SURFACES DAMAGED AS REQUIRED TO MATCH ADJACENT SURFACES. 7. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL EXISTING CONSTRUCTION, INCLUDING EXISTING TO REMAIN AND TO BE REMOVED. ITEMS AND DEBRIS TO BE REMOVED WILL BE PROPERLY DISPOSED OF BY THE CONTRACTOR, WITHIN HIS CONTRACT, AT NO COST TO THE OWNER. 8. ANY UTILITY -LINES TO REMAIN 'AND THAT ARE BROKEN OR DAMAGED DURING DEMOLITION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL CHARGE TO THE CONTRACT PRICE OR SHALL BE REPAIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE. 9. ANY DISCREPANCIES BETWEEN THE WORK DEPICTED ON THESE DOCUMENTS AND THE ACTUAL CONDITIONS ENCOUNTERED SHALL BE BROUGHT PROMPTLY TO THE ENGINEER FOR REVIEW - AND CLARIFICATION. 10. ANY DAMAGED EQUIPMENT SHALL BE REPLACED OR-RESTORED TO ORIGINAL CONDITION. 11. CONTRACTOR SHALL INSPECT AND TEST THE FUNCTIONALITY OF THE EXISTING SPRINKLER SYSTEM PRIOR TO COMMENCEMENT OF WORK AND SHALL REPORT ANY MALFUNCTIONS TO THE ENGINEER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BRING SYSTEM BACK TO WORKING CONDITIONS PRIOR TO COMPLETION. SPRINKLER HEAD SCHEDULE SYMBOL DESCRIPTION SYSTEM ORIFICE SIZE TEMP RATING OO PENDENT CONCEALED WET PIPE 1/7 (K -5.6) 155 DEG 0 PENDENT EXPOSED WET PIPE 1/7 (C -5.6) 155 DEG 0 UPRIGHT EXPOSED WET PIPE 1/7 (K -5.6) 155 DEG NOTES' ' I. ALL SPINKLERS SHALL BE QUICK RESPONSE TYPE Z ALL COVER PLATES SHALL BE ORDERED TO MATCH ADJACENT CEILING COLOR SCI -EI e ABBREVIATIONS F FIRE OS&Y OUTSIDE SCREW L•, YOKE D.I.P. DUCTILE IRON PIPE SP SPRINKLER FL FLOOR F.P. FIRE PROTECTION FHC FIRE HOSE CABINET FDC FIRE DEPARTMENT CONNECTION RM ROOM DN. DOWN EXIST. EXISTING SUES OF BRANCH LINES P �AA3STABLE 225221 AS HEADS PIPE SIZE 7 52 H� 10 27 FIRE PROTECTION GENERAL NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE EM AMW FIRE PROTECTION SYSTEMS, ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS. ALL WORK PERFORMED UNDER THIS 151 SEVILLAAVFNUE,_<I_1l-T- E10U- - - - -- - CONTRACT SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2004 CORAL GABLES, FL 33134 AND ALL THE STANDARDS OF CONSTRUCTION ESTABLISHED BY NCL OFFICE: (305) 442 -1188 INCLUDING BUT NOT LIMITED TO THE FOLLOWING PUBLICATIONS: A) FAX: (305) 445 -1509 CHAPTER 59A -3 FLORIDA ADMINISTRATIVE CODE, B) NFPA 13 -2004, C) WWW. ADCINTERNATIONAL.NET NFPA 99 -2004 AND D) OSHA. 9. 2. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS AND ALL OTHER COST INCIDENTAL TO THE COMPLETION AND STATE OF FLORIDA AR- 0010536 TESTING OF THIS WORK UPON FINAL ACCEPTANCE, A CERTIFICATE RAYMUNDO FEITO, R.A. AA— CO01315 FROM THE LOCAL INSPECTION AUTHORITY SHALL BE FURNISHED TO . THE OWNER. Architect • Seal/Signature 3. THIS CONTRACTOR SHALL PROVIDE A LOCALLY LICENSED M EXPANSION JOURNEYMAN FOR THE PERFORMANCE OF ALL TASKS LISTED IN THIS TRADE. IF TRAINEES ARE USED, THEY SHOULD BE UNDER DIRECT 2 HOURS WITHOUT PRESSURE LOSS. MODIFICATIONS AFFECTING20 -- SUPERVISION OF A LICENSED JOURNEYMAN. ALL WORK SHALL BE SUNSET I1ROFESSIONAL BLDG UNDER THE COGNIZANCE OF A MASTER. CONTRACTOR WILL BE 6280 SUNSET DID REQUIRED TO SHOW EVIDENCE OF MASTER/JOURNEYMAN /TRAI NEE ITI' CERTIFICATES OF ALL PERSONNEL WORKING ON THIS CONTRACT. ANY DELAYS IN WORK FOR FAILURE TO PRODUCE THE REQUIRED SOUTH MIAMI FL DOCUMENTATION SHALL BE THE CONTRACTOR'S COST. 11. HYDROSTATIC TEST PRESSURE SHALL BE MEASURED AT LOW POINT OF Key Plan -Scope of Work Area 4. THE CONTRACTOR SHALL INSTALL NEW WET PIPE FIRE PROTECTION Z KEY PLAN LEGEND �•tl i SPRINKLER SYSTEM AS REQUIRED BY NEW FLOOR PLAN LAYOUT (LIGHT -,Y• HAZARD). :. :.: ;.....:..:.. ; ;,. ;t« .�� 'AREA AT WHICH THE SCOPE OF a:: Fi ;.:• ;::::: ;:r ;::`:r WORK WILL BE ........ .......... 5. SPRINKLER PIPE SHALL BE NEW CONFORMING TO ASTM :'*? `>>> PERFORMED. SPECIFICATIONS ONS AND SHALL BEAR ASTM STANDARD MARKED •. ON EACH N.I.C. AREA LENGTH OF PIPE. ,��.:.:. ;,; ..........���._.._... CONSTRUCTION NOTE ABOVE GROUND :. THE CONTRACTOR BY VIRTUE OF �� SIGNING THE CONTRACT, A. FOR SIZES ABOVE 2", PIPE MAY BE BLACK STEEL, SCHEDULE 10, IN ., <• K 'n '��� ��'��'''•; � ACKNOWLEDGES THAT HEAND ACCORDANCE WITH ASTM Al 35 GRADE A OR ASTM A53 GRADE A. Z * ,A A ALL HIS SUBCONTRACTORS HAVE B. FOR SIZES Z' AND UNDER, PIPE SHALL BE BLACK STEEL, SCHEDULE z OF ;s SATISFIED THEMSELVES AS TO 40, IN ACCORDANCE WITH ASTM Al 35 GRADE A OR ASTM A53 Z :: THE NATURE AND LOCATION ' ''` ' �" THE WORK THE GENERAL AND GRADE A. LOCAL CONDITIONS INCLUDE, BUT fiL ARE NOT RESTRICTED TO THOSE C. PIPING THAT IS EXPOSED TO WEATHER OR INSTALLED IN A W BEARING UPON; ACCESS POINTS -� V - AND POINTS OF CONNECTION TO CORROSIVE ATMOSPHERE SHALL BE GALVANIZED. THE SITE, THE CONFORMATION d: f i " AND CONDITIONS OF THE WORK (/� w AREA; AND THE CHARACTER OF 6. ALL EXPOSED THREADS SHALL BE GIVEN A ZINC CHROMATE PRIMER. • E I EQUIPMENT AND DEVICES NEEDED z ' _ PRELIMINARY TO AND DURING THE 1 ' I ° E 3° i 5 PERFORMANCE OF THE WORK. - 7. ALL EXISTING HEADS TO BE RELOCATED SHALL BE REPLACED NEW. N FAILURE ON THE PART OF THE � ;.. `' :;, ALL NEW HEADS SHALL BE QUICK RESPONSE QR -165 F /2 „ CONTRACTOR TO COMPLETELY OR ORIFICE Lou �+ ( )*. PROPERLY EVALUATE ANY WITH DISCHARGE COEFFICIENT "K'= 5.6 AND RATED FOR 175 PSI MAX. ".:t� :"',: :. g FACTORS OF COSTS PRIOR TO a BIDDING SHALL NOT FORMA BASIS SERVICE PRESSURE. ` Y FOR ADDITIONAL COMPENSATION 8. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST W IF HE IS A WARDED THE CONTRACT. ISSUE OF NFPA PAMPHLET 13 ALL CALCULATIONS, SHOP DRAWINGS;'.�gg a', &,- t$is desn pt O,i'r~. - ..DraM►nBy Chewed By ' CI r„ or Consultant • Seal/Signature ENGINEERi W DESIGN • ,, CIL :. GR� / —/ 21 SW 102 Ct. Mi� r '• / Ii Office: (786) 863,x, -79'1 • .. , .. • • CL .��, Fax: (305) 220 -519§ pgengineerdesignfbellsou he FS=2m0'4v,*vv*.!p6* • .« STATE OF FLORIDA �jr_ LUIS O. PEREZ, PE P.E. No. 25 tff � �,"vl r+ 7 r..ti• 1T,s REFERENCED DIAGRAMS, PERFORMANCE CURVES AND DATA UTILIZ1�a".':; �.K,....- - • •- -' TO LAYOUT AND IDENTIFY SYSTEM SHALL BE SUBMITTED � TO z ARCHITECTS /ENGINEER FOR FINAL ACCEPTANCE. DESIGN DENSITY ' Z' SHALL BE 0.10 GPM / 1500 SQ. FT. ' z 9. HANG ALL PIPING USING SPLIT RING HANGERS AND RISER CLAMPS, SUPPORT FROM GALVANIZED HANGER RODS FROM BEAM CLAMPS"-OR: .� is ,:' )11t:• PRE -SET INSERT ONLY, SHOOTING ANCHORS IS NOT ACCEPTABLE. t- -- . 10. TEST 100% OF PIPING SYSTEM AT 200 PSI PRESSURE FOR A PERIOD`; OF � 2 HOURS WITHOUT PRESSURE LOSS. MODIFICATIONS AFFECTING20 -- , OR FEWER SPRINKLERS SHALL NOT REQUIRE TESTING IN EXCESS IOF Q SYSTEM WORKING PRESSURE AS PER NFPA 13 CHAPTER SECTION 2 ,i1':4 - - Date Issue Description Drawn By checked By "HYDROSTATIC TEST ". i 11. HYDROSTATIC TEST PRESSURE SHALL BE MEASURED AT LOW POINT OF SYSTEM OR ZONE BEING TESTED. 12. THE CONTRACTOR IS TO COORDINATE FINAL LOCATION OF ALL FIRE - -' SPRINKLER HEADS AS SHOWN IN THE ARCHITECTURAL REFLECTING CEILING PLANS. 13. MAINTAIN 8" CLEARANCE TO PARTITIONS FROM ANY PIPES WHICH RUN : PARALLEL TO PARTITIONS .iProject NuMbe - - -kJ Client Name 14. ALL CROSSINGS THROUGH PARTITIONS MUST BE MADE AT 90 DEGREES ,. +:,OW32 PRCMED F'ROFERTIES TO PARTITION. DO NOT CROSS AT LESSER ANGLES. oes�rlption''• ' Client Address FIRE SPRINKLER DETAILS 1696 NE MIAMI GAR)ENS DR SUITE 8 Scale K MIAMI BEACH, FL 33119 AS SHOWN Client Phone Number (305) 341 -WW CAD File Name C:V�F°rojectel /22OMl/2ADCl/2MRA EXPANSION CI r„ or Consultant • Seal/Signature ENGINEERi W DESIGN • ,, CIL :. GR� / —/ 21 SW 102 Ct. Mi� r '• / Ii Office: (786) 863,x, -79'1 • .. , .. • • CL .��, Fax: (305) 220 -519§ pgengineerdesignfbellsou he FS=2m0'4v,*vv*.!p6* • .« STATE OF FLORIDA �jr_ LUIS O. PEREZ, PE P.E. No. 25 tff � �,"vl r+ 7 r..ti• 1T,s