Loading...
12-1192-006uI I REMOVE LAVATORY & CAP PLUMBING PIPES EXIST 4 "0 v X v Ln X w .., c H rn w `v R TO EXIST. SEWER W,A EXIST. EXIST. EXIST. LAV LAV 1FU 1FU MEN RESTROOM EXIST. UR 2FU XI EXIST. 7EXIST. WC EXIST. 4FU 3 "F.D. W /RESEAL 3FU "O 3 "0 I REMOVE W.C. & CAP PLUMBING PIPES EXIST. EXIST ISTAC 4 EXI ST.b 3 "F.D. E -EXIST. W /RESEAL WC LWd 3FU 4FU WOMEN RESTROOM REMOVE LAVATORY & CAP PLUMBING PIPES EXIST. EXIST. LAV LAV 1FU 1FU STACK � I F-1 1 I I SANITARY RESTROOM GROUND FLOOR PLAN SCALE: 1/4" =1' -0" ROUGH IN TO 6" ABOVE PROPOSED FINISHED GRADE do CAP FINISHED 2 -WAY CLEANOUT DETAIL N.T.S. IISHRD GRADE & DED BRASS CAP I I I I 1 REMOVE LAVATORY & I PLUMBING PH E 4 V REMOVE LAVATORY PLUMBING SANITARY RESTROOM FLOOR PLAN TYP. FROM 2ND TO 8TH FLOOR INTERIOR PARTITION WALL CONSTRUCTION CHROME PLATED ACCESS COVER WITH CLEANOUT PLUG JOSAM 58890 SERIES. CONC. SLAB PIPE SIZE WALL SIZE 2" 4" 3" 4" 4" 6" ALL PLUMBING SHALL BE DONE IN ACCORDANCE WITH THE SOUTH SANITARY OF WASTE PIPING WALL CLEANOUT DETAIL N.T.S. SCALE: 1/4"= 1' -0" REMOVE LAVATORY & CAP PLUMBING PIPES t� TYPICAL \\ FROM 2ND TO 8TH FLOOR C'C' REMOVE LAVATORY & CAP PLUMBING PIPES � V � 1 48. EXIST. LAV 1FU EXIST. LAV 1 1FU EXIST. LAV 1FU EXIST. LAV 1 1FU C.O. GROUND FLOOR NOTE: THESE PLANS COMPLY WITH NEW F.B.C. 2010 BUILDING Ln I I I \ I N% I \\ I \\ I \ \ EXIST. I 2FU I 111-4 L EXIST. MOP SINK 2FU C.O. I k\ I \ I EXIST. C.O. WC 4FU EXIST. 3 "O WC 4FU 3 "0 4 "RESEAL EXIST. F.D. / EXIST. 3 "0 3FU WC 3"0 EXIST. I 4FU EXIST. 4FU F.D. I 3FU 3"O \ -Z"RESEAL 3 "Qi EXIST. WC ` EXIST. 4FU 1 MOP SINK 2FU I I C.O. EXIST. WC EXIST. 4FU 3 "0 WC 3 "O 4FU EXIST. Wc 4FU 4" RESEAL i 3"0 EXIST. F.D. / EXIST. 3 "fri '�" /S� 3FU c 4 3 "0 EXIST. 4FU EXIST. 4FU F.D. 3 "O 3FU 3"0 \ J "RESEAL Q 3 "0 J V / REMOVE W.C. & CAP PLUMBING PIPES SANITARY ISOMETRIC nts 3 "0 1/8" SLOPE 2 "0 1/4" SLOPE 1 -1/2 "0 1/4" SLOPE REMOVE LAVATORY & CAP PLUMBING PIPES \ EXIST. LAV 1FU REMOVE LAV. & CAP PLUMBING PIPES 2 "OI I TYPICAL FROM 2ND TO 8TH FLOOR C.O. GENERAL SCOPE OF WORK PLUMBING WORKS - EXISTING PLUMBING SYSTEM TO REMAIN REMOVE, AND RECONNECT EXISTING FIXTURES AS SHOWN - NO ADDITIONAL FIXTURES EX`s� 2.0 PLUMBING NOTES. 6. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION 1. ALL PLUMBING SHALL BE DONE IN ACCORDANCE WITH THE SOUTH OF MATERIALS AND EQUIPMENT. FLORIDA BUILDING CODE, STATE AND LOCAL ORDINANCES. 7. COORDINATE WORK WITH OTHER TRADES. A. FIXTURES ARE TO COMPLY WITH F.B.C. 8. FURNISH AND INSTALL PLUMBING FIXTURES AS SPECIFIED IN FIXTURE SCHEDULE, OR EQUAL. B. PROVIDE CLEANOUTS AS PER F.B.C. 9. EACH PLUMBING FIXTURE SHALL BE PROVIDED WITH AIR CHAMBERS 2. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND AS PER F.B.C. CONNECTION CHARGES REQUIRED. 3. PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF 10. PROVIDE SHUT OFF VALVE FOR EACH FIXTURE. DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE 11. WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC YEAR FROM DATE OF ACCEPTANCE. FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 4. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR TO INSTALLATION. 12• PROVIDE PIPING AS FOLLOWS: 5. OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DOMESTIC COLD /HOT WATER PIPING AND EWH P &T RELIEF DRAIN PIPE: DUCTWORK, ETC. AS REQUIRED BY FIELD CONDITIONS. COORDINATE COPPER TUBE TYPE L OR M ABOVEGROUND WITH SOLDER JOINTS, MIN. WITH ALL EXISTING AND NEW WORK. 125 LB. WOG BRONZE VALVES. TYPICAL FROM 2ND TO 8TH FLOOR EXIST. LAV 1FU EX ST. I LAV 1FU EXIST. LAV 1FU I C.0 I 4 "O RT U GROUND I 2FU FLOOR C.O. LLI ^o Z_ > 10,00 � ~ n- W Ur�]NY CN W O�-j I Z A �V Q F- y z -J F z m p o Z QQI-) r) ' N C 7 w Z 0 a-UQ w Q 0 WU _j0O Qf I.- LL. ILL cV U I ME �I 0 LL 0� M z w W d- u.1 O cM 0 W 0 J W � � CLL C Z) c/) G f)0 zQ 2 CU � O z c\I _ O N = �--. co 0 U) I ai U N ET a Q rW F, m L' p ~ p Z w (LQO W = U Z W ° F- �Z a¢�Vw Z n: N 0 _ FQ oZf ° 0 1 O= ¢w m V) 0 o Z U O Q ° Z Of L W 01 W V) LLJ W W X (A W L O REVISIONS DESCRIPTION Project No. 12 -123 Date: 10 -27 -2012 Drawn By: PEDRO PUERTO/L.M (305) 262 8075 Approved By: F.G.P. SEAL o0e.-PINq C) 4el S _c-) :C) rc = z . _ Q. d� • 0 v %�\r '••...•.F� :••\OAP \\ P -1 OF X