GENERAL PLUMBING NOTES
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA
BUILDING CODE AND LOCAL ORDINANCES.
2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL. ANY
DEVIATIONS SHALL BE APPROVED BY ARCHITECT/ENGINEER.
3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT, BASE OF EVERY WASTESTACK.
ALL CLOSEOUTS TO BE FLUSH MOUNTED.
4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWSi
k DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE
WASTE; PVC DRAINAGE WASTE ANDxPIPING (DWV) CONFORMING TO
ASTM D -2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE
GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO-
PRENE GASKETS UNDERGROUND.
B. WATER PIPING: COPPER TYPE "L" ASTM B -88 ABOVE GROUND AND
COPPER TYPE "K" ASTM B -88 UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B -88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN
PIPING.
D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT
TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL.
KITCHEN FLOOR DRAIN: JOSAM 35420 --50, 12" SQUARE NIKALOY TOP, SATIN
FINISH. 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET.
E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL.
F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL.
G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL.
H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER.
I. ELECTRIC WATER HEATER: GLASS — LINED, P & T RELIEF VALVE, 5 YEAR
WARRANTY MINIMUM.
5. PERFORM THE FOLLOWING TEST:
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED do ALL LINES FILLET} WITH WATER TO HIGHEST
POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT,
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE do EQUIPMENT SHALL BE GIVEN AN IN ' SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED
LIME TO EACH 1000 anal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN
MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY WITH POTABLE WATER
BEFORE PLACING IN SERVICE.
6. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING
WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD
OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE,
REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND POINTS OF
CONNECTION BEFORE COMMENCING ANY WORK.
8. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
9, SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
10.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DARINS.
12. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT.
13. COORDINATE WORK WITH OTHER TRADES.
14. FURNISH AND INSTALL FIXTURES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE
PROVIDE SHOP DRAWINGS.
15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK
ABSORBER AS PER S.F.B.C.
16.PROVIDE SHUT —OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE.
17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING
SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
18.MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF
STUB --UPS.
19.REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS.
20. PROVIDE AT REFRIGERATOR LOCATION: 3/8" C.W. LINE TO 1/4" PETCOCK 6" ABOVE
FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR .
21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS.
EF =0.89
I
3/4" MIN.
FLOOR 3/4" DRAIN TO OUTSIDE
rRESSUItE RELIEF tc DRAIN PAN LINES
TO BLDG. EXTERIOR, 6" ABOVE GRADE
AND TURNED DOWN.
• INSTALL 0 16" AFF . WHEN
LOCATED AT GARAGE
WATER HEATER DIAGRAM
N.T.S.
PLUMBING FIXTURE CONNECTION SCHEDULE
• THE TANK OR WATER HEATER SHALL BE
DESCRIPTION
INSTALLED IN A GALVANIZED STEEL OR OTHER
WASTE
•cfi
• Y
Y•f • f
W •• WV
.rr.••
r
cui
i •
0.0276 INCH (0.70 mm). ELECTRIC WATER
3
HEATHERS SHALL BE INSTALLED IN A METAL PAN
'
AS HERE IN REQUIRED OR IN A HIGH — IMPACT
•ii W
• •
• W W
u� •
uy •
• •
•
r
r
Y •
U•••U
THE PAN SHALL NOT BE LESS THAN 1 I INCHES
1/2"
(36 raga) DEEP AND SHALL BE OF SUFFICIENT
r -2A
SIZE AND SHAPE TO RECEIVE ALL DRIPPING OR
f•G
Y •
i•f f W
V
U
r
Ueu•
f W
V U•
-
LAVATORY
INCH.
1 1 /z'
TO COLD WATER
•
• r
• •
• •u
•••
•
r•
•
• Y
'
sm — CW
HEAT Hw
UNION FITTING
HOT WATER SYSTEM TO
• •
• • W •
•
f
Y U
COUNTER TOP
P -5
TEMPERATURE k
1 1/2'
PRESSURE
WATER HEATER 40 GALS.
RELIEF VALVE "
00
000
00
—AIR GAP FITTING
ELEMENTS
(G) 92x0 OF DRAIN PRE)
WATER SUPPLY VALVE k DRAIN IN RECESSED
BOX WALL MOUNTED.
P -7
••••
f W
f•IJ••
f••
••i•
1/2"
---- - - - - --
P -6
REFRIGERATOR
--
--
•
•
• W
•
PLUMBING SYMBOLS
2"
2-
'
1/2"
•Y•U
• 00606 •
•r•
U ••00
G
S- — -S COLD WATER PIPE
PERFORATED CAP
DRAIN PAN
HOT WATER PIPE
PITCH DOWN
4 WATER HAMMER ARRESTOR
TOWARD DRAIN
STEEL COVER
PLATE GRADE
AIR CHAMBER
HOSE BIBB W / VACUUM BREAKER
Q °
HB
AND SHUT —OFF VALVE
SEE MECHANICAL DRAWINGS
"
SANITARY LINE
n
FOR UNIT SUPPORTS.
a
�--- C.D. CONDENSATE LINE
DRAIN LINE SHALL BE AT LEAST THE
<> a
SAME SIZE AS THE NIPPLE ON THE
a o c
CONDENSATE DRAIN
DRAIN PAN
LINE FROM BUILDING
SEE PLAN FOR SIZE.
WCO WALL CLEANOUT
°
o
1/2" + TOTAL AHU PLUMBING
MECHANICAL
d
�,
;
FCO FLOOR CLEANOUT
TOTAL STATIC PRESSURE
=
o
24" DIAMETER CONCRETE
b C
a
C FILLED
GATE VALVE ( SHUT —OFF
Q
,WIPE
WITH WITH 3 4 CRUSHED ROCK
VALVE
TYPICAL CONDENSATE
DRAIN TRAP
N.T.S.
°
° > o
EF =0.89
I
3/4" MIN.
FLOOR 3/4" DRAIN TO OUTSIDE
rRESSUItE RELIEF tc DRAIN PAN LINES
TO BLDG. EXTERIOR, 6" ABOVE GRADE
AND TURNED DOWN.
• INSTALL 0 16" AFF . WHEN
LOCATED AT GARAGE
WATER HEATER DIAGRAM
N.T.S.
PLUMBING FIXTURE CONNECTION SCHEDULE
• THE TANK OR WATER HEATER SHALL BE
DESCRIPTION
INSTALLED IN A GALVANIZED STEEL OR OTHER
WASTE
METAL PAN OF EQUAL CORROSION RESISTANCE
H.W.
HAVING A MINIMUM THICKNESS OF 24 GAGE,
P-1
0.0276 INCH (0.70 mm). ELECTRIC WATER
3
HEATHERS SHALL BE INSTALLED IN A METAL PAN
1/2"
AS HERE IN REQUIRED OR IN A HIGH — IMPACT
FLOOR MOUNTED, PLUSH TANK
PLASTIC PAN OF AT LEAST 0.0625 INCH (1.59 q
BATHTUB
mm) THICKNESS. 1
2"
THE PAN SHALL NOT BE LESS THAN 1 I INCHES
1/2"
(36 raga) DEEP AND SHALL BE OF SUFFICIENT
r -2A
SIZE AND SHAPE TO RECEIVE ALL DRIPPING OR
S
CONDENSE FROM THE TANK OR WATER HEATHER.
1/2"
THE PAN SHALL BE DRAINED BY AN INDIRECT
PRESS. BALANCING FAUCET.
WASTE PIPE HAVING A MINIMUM DIAMETER OF
LAVATORY
INCH.
1 1 /z'
TO COLD WATER
THERMAL EXPANSION BY
GATE VALVE SYSTEM
AMTROL MODEL ST -5.
LAVATORY
(1600 - 736 - 1149)'
cw -- s
sm — CW
HEAT Hw
UNION FITTING
HOT WATER SYSTEM TO
(TYPICAL)
BE FULLY INSULATED.
DIELECTRIC
1/2"
FITI'IG (TYPICAL)
COUNTER TOP
P -5
TEMPERATURE k
1 1/2'
PRESSURE
WATER HEATER 40 GALS.
RELIEF VALVE "
WITH NON SIMULTANEUS
WASHER (RESIDENTIAL)
4,5 KW HEATING
—AIR GAP FITTING
ELEMENTS
(G) 92x0 OF DRAIN PRE)
EF =0.89
I
3/4" MIN.
FLOOR 3/4" DRAIN TO OUTSIDE
rRESSUItE RELIEF tc DRAIN PAN LINES
TO BLDG. EXTERIOR, 6" ABOVE GRADE
AND TURNED DOWN.
• INSTALL 0 16" AFF . WHEN
LOCATED AT GARAGE
WATER HEATER DIAGRAM
N.T.S.
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK
DESCRIPTION
P'U'S
WASTE
C.W.
H.W.
REMARKS /SPECS
P-1
WATER CLOSET
3
3"
1/2"
-
FLOOR MOUNTED, PLUSH TANK
P -2
BATHTUB
2
2"
1 /L"
1/2"
5 FT. LONG, PRESSURE BALANCING FAUCET
r -2A
SHOWER
S
2"
1/2"
1/2'
PRESS. BALANCING FAUCET.
P--3
LAVATORY
1
1 1 /z'
1/2"
1/2'
COUNTER Tor
P -3A
LAVATORY
1
1 1/2'
1/2"
1/2'
FLOOR MOUNTED
! -4
KITCHEN SINK
2
1 1/2-
1/2"
1/2"
COUNTER TOP
P -5
DISH WASHER
1 1/2'
1/2"
1 /2"
--------
P -6
WASHER (RESIDENTIAL)
2
2"
1/2'
1/2"
WATER SUPPLY VALVE k DRAIN IN RECESSED
BOX WALL MOUNTED.
P -7
SMET
2
2"
1/2"
1/2"
---- - - - - --
P -6
REFRIGERATOR
--
--
1 2"
--
---- - - - - --
P —!
LAUNDRY ISM
2"
2-
1/2"
1/2"
COUNTER TOP
NOTE : CONTRACTOR TO COORDINATION PLUMBING FIXTURE SELECTION, WITH OWNER/ ARCHITECT FOR FIXTURE AND
FAUCET STYLE k COLOR.
CONDENSATE SOAKAGE
PIT DETAIL
N.T.S.
PROVIDE EXTRA HEAVY PATTERN FULL OPENING
IRON BODY TRAP SCREW FERRULE is ALL BRASS FINISH GRADE
CLEANOUT WITH COUNTERSUNK HEAD
FINISH GRADE PROVIDE -POURED CONC. MINIMUM 1"
BLOCK WHEN C.O. IS
NOT IN PAVED AREA
I,�, �•YL /f�i'fiY�Y�"'sfi Lay fy'.if„�fy
12 "x12 "x8"
POURED CONC, LONG SWEEP. USE SHORT
BLOCK WHEN SWEEP WHERE REQUIRED - .- SAME SIZE AS
CLEANOUT IS COMBINATION "Y" Ec SIZE SEWER ��— MAX.
NOT IN
PAVED AREA 1/8" BEND
GCO FCO
WC
STAINLESS STEEL COVER
SCREWED TO THREADED
C.O. PLUG
FACE OF WALL
TYPICAL CLEANOUT DETAIL
N.T.S.
NOTE:
2" PIPE & LESS 0 1/4" SLOPE
3" PIPE & MORE O 1/4" SLOPE
THIS CONTRACTOR SHALL COORDINATE WITH
THE PARTITION CONTRACTOR TO INSTALL 6"
WALL, WHEN 3" OR 4" PLUMBING STACK IS
INSTALLED.
DANIEL .F G T,rT1Fi REZ P .F_ 3360 CORAL Ye'4 Y
Pff� (,30;)461 — x:3178
DFC:i
COA?_51,LTINCP E1Vf:rrNFF,'R,Z,
2 6 3 7 7
n; .T.-'.7 < ":..) .7�4
CONSULTING:
co
cic
� O
LL
W
0 t
_
W w
t t-=
Z F— W
W (0 m
�
U) Put
W c°a
CC
+ C�/) d)
2�!., N N d
ca `cO cl)
r (': 9
yVj •* ,.. w
w r Lai
g �S�
r�*
J �
J M 0
Q U ;.` " te
m I„ �" '�
0" -sue
(1 U
Fj �I
a
tqr
0 Q-
Ln
40
go
L0
no
Q
F •'�i
�Y
i
07
Y
O
a
0
Z
o
o
�
1
d
�
CONSULTING:
co
cic
� O
LL
W
0 t
_
W w
t t-=
Z F— W
W (0 m
�
U) Put
W c°a
CC
+ C�/) d)
2�!., N N d
ca `cO cl)
r (': 9
yVj •* ,.. w
w r Lai
g �S�
r�*
J �
J M 0
Q U ;.` " te
m I„ �" '�
0" -sue
(1 U
Fj �I
a
tqr
0 Q-
Ln
40
go
L0
no
fo
4�.:r.. .jrmWWw
WAYIN
JN
"'m w11�
"
SHEq,
W11Y
&A,
6 o s
ik
Al
G�.
x
t`
i�
r
Q
F •'�i
07
fo
4�.:r.. .jrmWWw
WAYIN
JN
"'m w11�
"
SHEq,
W11Y
&A,
6 o s
ik
Al
G�.
x
t`
i�
r