Loading...
12-508-0150 a w,l k I \0 M 7 0 Ifl FS I. 0 Ia Ia M _'o '' ■ DEMOLITION NOTES: -- -- 1 AREA OF CONSTRUCTION SHALL - 9E, MAINTAIN ED "_UNDER" - - NEGATIVE PRESSURE IN RELATION TO SURROUNDING AREAS. THE CONSTRUCTION AREAS TO BE TESTED WEEKLY TO ASSURE A NEGATIVE PRESSURE OF 0.02 INCHES WATER GAUGE IS BEING MAINTAINED WHEN ALL DOORS AND WINDOWS ARE CLOSED. ALL AIR OUTLETS AND WALL PENETRATIONS SHALL BE BLOCKED OFF TO MAINTAIN NEGATIVE PRESSURE IN SPACE. CONTRACTOR WILL PROVIDE A TEMPORARY EXHAUST FAN TO MAINTAIN NEGATIVE PRESSURE IN THE SPACE. 2 SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL DEMOLITION WORK INFORMATION. 3 WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TO NORMAL OPERATION OF THE SM HOSPTAL - MAIN BUILDING, SEE ARCHITECTURAL DRAWING PLAN. COORDINATE WITH THE AUTHORIZED BHM REPRESENTATIVE A MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON HVAC SYSTEMS. 4 PROVIDE VISUAL NEGATIVE PRESSURE GAUGE TO MONITOR THE PRESSURE RELATIONSHIP BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT SPACE TO PROVIDE NEGATIVE PRESSURE OF 0.02" W.G. WITHIN THE SPACE. 5. PROVIDE MAGNETIC DRAFT GAUGE ON ANY DOOR OPEN TO OCCUPANCY SPACE INSIDE BLDG. (SEE ARCHITECTURAL PLAN). INFECTION CONTROL RISK ASSESSMENT: 1 TO THE EXTEND THAT IT IS REQUIRED BY ICRA, THE CONTRACTOR SHALL MAINTAIN EXISTING LEVELS OF INDOOR AIR QUALITY IN SURROUNDING AND ADJACENT AREAS TO THE CONSTRUCTION AREA, AND ELSEWHERE IN THE FACILITY. IT SHOULD BE ANTICIPATED THAT THE ICRA REPORT WILL REQUIRE ERECTION OF CONSTRUCTION ZONE BARRIERS AND PROVISION OF NEGATIVE PRESSURE IN CONSTRUCTION ZONE RELATIVE TO SURROUNDING AREAS. 2 IN ADDITION TO MEETING THE REQUIREMENTS OF THE ICRA REPORT, THE CONTRACTOR SHALL PROVIDE THE EQUIPMENT NECESSARY TO CREATE A NEGATIVE PRESSURE IN THE CONSTRUCTION AREA, RELATIVE TO THE ADJACENT AREA. EXISTING HVAC SYSTEM AND COMPONENTS SHALL NOT BE USED FOR THIS FUNCTION, UNLESS SPECIFICALLY APPROVED BY THE OWNERS INFECTION CONTROL OFFICER. THE CONCEPT AND ALL ASPECTS OF THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE ICRA REQUIREMENTS AND AS MINIMUM THE FOLLOWING: A. VERIFY ALL EXISTING DUCTWORK WHICH PASSES THROUGH THE CONSTRUCTION ZONE, AND IS TO REMAIN, IS SEALED AND PROTECTED DURING CONSTRUCTION. B. AIR REMOVED FROM THE CONSTRUCTION ZONE SHALL BE FILTERED AND /OR DISCHARGED AS DIRECTED BY THE ICRA REPORT. C. PRESENT THE NEGATIVE AIR PRESSURE PLAN TO THE OWNER FOR APPROVAL BY THE INFECTION CONTROL OFFICER. D. PROVIDE MEANS TO MONITOR AND VERIFY NEGATIVE PRESSURE IS BEING MAINTAINED IN ACCORDANCE WITH THE ICRA REPORT, AND PROVIDE DOCUMENTS TO THE OWNER AS REQUIRED. CODED NOTES: 1 TEMPORARY FLEXIBLE DUCT. REMOVE FLEXIBLE DUCT AFTER DEMOLITION IS COMPLETED. 2 INSTALL AGAINST AIR DEVICE TEMPORARY BLANKET TYPE, DISPOSABLE 1" THICK SYNTHETIC MEDIA. REMOVE SYNTHETIC MEDIA AFTER DEMOLITION IS COMPLETED. 3 FLOOR MOUNTED UTILITY FAN WITH HEPA FILTER AND SPEED CONTROL TO CLEAN AND EXHAUST THE AIR IN THE CONSTRUCTION AREA, MAINTAINING NEGATIVE PRESSURE OF 0.02" W.G. BETWEEN CONSTRUCTION AREA AND ADJACENT SPACES (SEE DEMOLITION NOTES ON THIS DRAWING) 4 INSTALL TEMPORARY CAP IN SUPPLY, RETURN AND EXHAUST AIR DUCTS AND SEAL AIRTIGHT. REMOVE AT END OF CONSTRUCTION. RELATIVE PRESSURE EQUAL PRESSURE NEGATIVE PRESSURE POSITIVE PRESSURE ARCHITECT: BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers 9150 South Dadeland Blvd. • Suite 900 Miami ® Florida 33156 • E80000924 Telephone 305.670.0141 Facsimile 305.670.0144 www.l jaa ap com Project No.: 22007 F091. No sr 'ad PERMIT SET 4/13/2012 REVISIONS: PROJECT NAME: SMH- HYPERBARIC CHAMBER PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40068 SCALE: AS SHOWN DATE: 04/13/2011 DRAWN: AP CHECKED: CARD FILE: V/22007 -MEP DRAWING TITLE: ICRA FLOOR PLAN HVAC SHEET NO. � TJ 14 RC