12-508-014GENERAL MECHANICAL NOTES: 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATED THE RIGHT OF WAY FOR THE INSTALLATION OF DUCTWORK, PIPING, ELECTRIC LIGHTING CONDUIT WITH ALL TRADES IN ORDER TO AVOID DELAY IN THE PROJECT CONSTRUCTION TIMETABLE, ANY CONFLICT SHALL BE BROUGHT TOT HE ATTENTION OF THE A/E OF THE PROJECT FOR ITS SOLUTION. 2. ALL AIR CONDITIONING DUCTWORK SHALL BE CODE GAGE GALVANIZED SHEET METAL INSULATED WITH 2 INCH THICK AND 1.0 PCF GLASS FIBER FLEXIBLE BLANKET INSULATION WITH ALUMINUM FOIL REINFORCED WITH GLASS FIBER FASING (FSKL) JOHN - MANVILLE MICROLITE (R -6 INSTALLED) OR APPROVED EQUIVALENT, DUCT SIZES SHOWN ARE NET FREE AREA. PROVIDE DOUBLE THICKNESS TURNING VANES AND EXTRACTORS AT ALL ELBOWS AND TAKE -OFFS. 3. EXHAUST AIR DUCTWORK SHALL BE UNINSULATED. 4. ALL CONCEALED SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH DUCT WRAP AS INDICATED IN SPECIFICATIONS. 5. RETURN DUCTS LOCATED IN CEILING SPACE SHALL BE INSULATED THE SAME AS THE SUPPLY AIR DUCTS. 6. EXACT LOCATION OF AIR DISTRIBUTION DEVICES SHALL BE COORDINATED WITH THE LIGHTS, SPRINKLER HEADS AND WITH THE SUSPENDED CEILING TILES. 7. COORDINATE INSTALLATION WITH ALL OTHER INVOLVED TRADES. IN THE CASE OF CONFLICT BETWEEN DRAWINGS AND SPECIFICATION, THE MORE STRINGENT REQUIREMENT AS DETERMINED BY THE ARCHITECT / ENGINEER SHALL TAKE PRECEDENT. 8. REFER TO PLANS FOR ADDITIONAL NOTES. 9. FLEX DUCT: PROVIDE FACTORY ASSEMBLED CLASS 1 AIR DUCT (UL 181) WITH 1 -1/2" THICK 1 PCF FIBERGLASS INSULATION R -6 AND REINFORCED OUTER PROTECTIVE COVER/VAPOR BARRIER. FLEX DUCT SHALL MEET NFPA 90A WITH FLAME SPREAD UNDER 25, SMOKE DEVELOPED UNDER 50, AND SHALL BE RATED FOR 2" W.G. PRESSURE AND 0 TO 250 DEGREES FAHRENHEIT. PROVIDE METAL ADJUSTABLE CLAMPING DEVICES, SCREW OPERATED. USE TWIST -LOCK CONICAL TAP COLLARS AT CONNECTIONS INTO SHEET METAL DUCTWORK. FLEXIBLE DUCTWORK MAY BE USED FOR BRANCHES TO DIFFUSERS AS INDICATED ON DRAWINGS. DO NOT EXCEED EIGHT (8) FEET IN LENGTH FOR ANY FLEX DUCT. ACCEPT MANUFACTURER FLEX MASTER 8M AND THERMOFLEX MKE, NO OTHER MANUFACTURER WILL BE ACCEPTABLE. 10. SPIN COLLARS SHALL BE OF THE INTEGRAL DAMPER TYPE WITH LOCKING WING NUT AND 2 INCH TALL STAND OFF BRACKET. ALL SPIN COLLARS SHALL BE ATTACHED TO THE SIDE OF DUCT WITH THE CONNECTION SEALED WITH MASTIC; CONNECTION TO TOP OR BOTTOM OF DUCT SHALL NOT BE USED UNLESS SPECIFICALLY APPROVED BY THE ENGINEER. SPRAY PAINT DAMPER HANDLES DAY -GLOW ORANGE AND INSTALL A 24 INCH LONG RED RIBBON ON THE HANDLE FOR T.A.B. PURPOSES AFTER INSTALLATION. 11. ELEVATIONS GIVEN: BE = BOTTOM ELEVATION, CE = CENTERLINE ELEVATION, TE = TOP ELEVATION, ARE TAKEN FROM THE CONCRETE FLOOR SLAB. THESE ELEVATIONS ARE APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO FABRICATION OF ANY DUCTWORK OR PIPING. 12. PROVIDE SINGLE THICKNESS METAL TURNING VANES IN ALL SQUARE ELBOWS INCLUDING SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR DUCTS. WHERE UNEQUAL SQUARE ELBOWS ARE SHOWN, TURNING VANES WITH TRAILING EDGE EXTENSIONS SHALL BE USED. 13. PROVIDE ACCESS DOORS AT ALL FIRE DAMPERS, SMOKE DETECTORS, FIRE /SMOKE DAMPERS AND AUTOMATIC TEMPERATURE CONTROL DEVICES WITH MAXIMUM ALLOWABLE STANDARD SIZE PERMITTED B DUCT DIMENSIONS. DOOR SHALL BE REMOVABLE TYPE WITH SAFETY CHAIN AND SHALL HAVE CAM LATCHES AND BE FULLY GASKETED TO THE PERIMETER. PROVIDE ACCESS PANELS IN CEILING WHERE REQUIRED PROVIDING ACCESS TO DAMPERS. 14. DOCUMENTS ARE SCHEMATIC IN NATURE AND DO NOT INDICATE EVERY BEND, ELBOW OR OFFSETS REQUIRED IN DUCTWORK AND PIPING. FIELD VERIFY ALL SIZES AND ELEVATIONS PRIOR TO FABRICATION / INSTALLATION. PROVIDE MODIFICATIONS WHERE REQUIRED FOR COORDINATION IN BASE CONTRACT PRICE AT NO ADDITIONAL COST. 15. ENDS OF DUCTWORK SHALL BE KEPT SEALED USING PLASTIC SHEETING AND DUCT TAPE DURING CONSTRUCTION. 16. LOCATIONS FOR TEMPERATURE AND HUMIDITY SENSOR ARE APPROXIMATE IN NATURE AND SHALL NOT BE SCALED FROM THE DRAWINGS. COORDINATE EXACT LOCATIONS WITH ROOM FURNITURE LAYOUT AND CONFIRM PROPOSED LOCATION WITH THE OWNERS REPRESENTATIVE PRIOR TO ROUGH -IN. 17. EQUIPMENT SHALL BE SUPPLIED AND INSTALLED WITH PROVISION FOR IN -PLACE CLEANING AND SIMILAR MAINTENANCE TASKS IN ACCORDANCE WITH THE REQUIREMENTS OF ASHRAE 62 -1989. 18. PROVIDE MISCELLANEOUS STRUCTURAL STEEL TO SPAN ACROSS BEAMS AND JOIST WHERE REQUIRED FOR INTERMEDIATE SUPPORT. 19. THE LOCATION OF FIRE DAMPERS IN DUCT PENETRATIONS IN RATED WALLS AND PARTITIONS IS BASED ON THE FLORIDA BUILDING CODE -2010 (BUILDING AND MECHANICAL), WHERE EXCEPTIONS ARE ALLOWED BY CODE FOR OMISSION OF DAMPERS. THESE EXCEPTIONS HAVE BEEN EMPLOYED FOR THIS PROJECT. 20. CONTRACTOR SHALL OBTAIN A COMPLETE SET OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS, AND REVIEW TO ENSURE ALL ITEMS INDICATED ON THE DRAWINGS ARE INCLUDED IN HIS BASE BID. ALL ITEMS REQUIRING A MECHANICAL CONNECTION (DUCTWORK, PIPING, ETC.) SHALL BE HOOKED -UP TO PROVIDE A FULLY OPERATIONAL AND FUNCTIONAL SYSTEM, AND INCLUDED IN THE BASE BID. 21. SUBMIT SHOP DRAWINGS OF ALL MATERIALS, DUCTWORK DUCT LAYOUT AND EQUIPMENT FOR REVIEW BY ENGINEER PRIOR TO FABRICATION AND /OR INSTALLATION. 22. ALL NEW CONTROL DEVICES MUST BE COMPATIBLE TO EXISTING CONTROL SYSTEM. 23. EQUIPMENT AND APPLIANCES SHALL BE INSTALLED AS REQUIRED BY THE TERMS OF THEIR APPROVAL, IN ACCORDANCE WITH THE CONDITIONS OF THE LISTING, THE MANUFACTURER'S INSTALLATION INSTRUCTIONS ON FBC -2007 CHAPTER 3 GENERAL REGULATIONS - SECTION 304 INSTALLATION #304.1 GENERAL. MANUFACTURER'S INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE AT THE TIME OF INSPECTION. 24. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF ALL CEILING MOUNTED FIXTURES, OUTLETS, DEVICES AND /OR EQUIPMENT SHOWN IN THESE ENGINEERING DRAWINGS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS AND /OR APPLICABLE DETAIL DRAWINGS. ANY DISCREPANCY AND /OR CONFLICT MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT /ENGINEER PRIOR TO PROCEEDING WITH ANY ROUGH -IN WORK. 25. ALL SERVICE INTERRUPTIONS AS WELL AS REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH AUTHORIZED REPRESENTATIVE OF SOUTH MIAMI HOSPITAL IN ADVANCE. 26. THE CONTRACTOR SHALL COORDINATE WITH THE OWNERS REPRESENTATIVE THE PHASING OF THE DEMOLITION WORK INCLUDED IN THE SCOPE OF WORK. 27. WORK SHALL BE SCHEDULED TO MINIMIZE IMPACT TO NORMAL OPERATION OF THE HOSPITAL. SEE ARCHITECTURAL DRAWING FOR STAGING (PHASING ) PLAN. COORDINATE WITH AUTHORIZED SOUTH MIAMI HOSPITAL REPRESENTATIVE A MINIMUM OF 72 HOURS PRIOR TO ANY SHUTDOWN REQUIRED TO PERFORM WORK ON HVAC SYSTEMS. 28. BALANCING DAMPERS: FABRICATED OF SAME MATERIAL AS DUCT TWO METAL GAUGES HEAVIER THAN DUCT. MOUNT ON 3/8" SQUARE ROD WITH SAW SLOT POSITION INDICATOR. PIVOT AND BEARING, LOCKING POSITION REGULATOR. 29. CONTRACTOR SHALL BE RESPONSIBLE TO TEST AND BALANCE THE HVAC SYSTEM AS PER ASSOCIATED AIR BALANCE COUNCIL STANDARS. AIR CONDITIONING LEGEND SYMBOL DESCRIPTION AHU AIR HANDLING UNIT BD BACKDRAFT DAMPER COND. CONDENSATE CFM CUBIC FEET PER MINUTE CV CONSTANT VOLUME EF EXHAUST FAN EA EACH E/A EXHAUST AIR FD FIRE DAMPER FLA FULL LOAD AMPS FPM FEET PER MINUTE FPS FEET PER SECOND HR HOUR IN. INCH LBS. POUNDS MAX. MAXIMUM NO. NUMBER O/A OUTSIDE AIR RPM. REVOLUTIONS PER MINUTE R/A RETURN AIR S/A SUPPLY AIR TEMP. TEMPERATURE T THERMOSTAT VD MANUAL VOLUME DAMPER (OPPOSED BLADE TYPE) V VELOCITY APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL ORDINANCES, UTILITY COMPANY REGULATIONS AND THE APPLICABLE REQUIREMENTS OF THE FOLLOWING ACCEPTED CODES AND STANDARDS, WITHOUT LIMITING THE NUMBER, AS FOLLOWS: 1. FLORIDA BUILDING CODE - 2010 2. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH DEPARTMENT CARE FACILITIES 2004 (WITH REVISION 2006). 3. AGENCY FOR HEALTH CARE ADMINISTRATION, AHCA, 59A -3. 4. NATIONAL ELECTRIC CODE (NEC 2008). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA). 6. DEPARTMENT OF ENVIRONMENTAL REGULATION MANAGEMENT (DERM). 7. LOCAL ORDINANCES, REGULATIONS OF THE BUILDING DEPARTMENTS AND FIRE DEPARTMENTS. 8. NATIONAL ELECTRICAL SAFETY CODE 2002. 9. OCCUPATIONAL SAFETY AND HEALTH STANDARD. 10. RECOMMENDATION OF NFPA, IN GENERAL AND IN PARTICULAR: A. LIFE SAFETY, NFPA (2006) B. HAVC, NFPA 90A (2002) C. HVAC, NFPA 90B (2006) D. HVAC, NFPA 96 (2004) E. HOSPITALS, NFPA 99 (2002) F. SMOKE CONTROL, NFPA 92A (2000), 92B (2000) G. MEDICAL GAS, NFPA 99 (2002), AND NFPA 50 (2001) H. STANDARD FOR INSTALLATION OF EXHAUST SYSTEMS, NFPA 91 (1999) 1. STANDARD FOR INSTALLATION OF SPRINKLER SYSTEM, NFPA 13 (2002) 11. RECOMMENDATION OF ASHRAE (2001), INCLUDING ASHRAE 90 -75. 12. JOINT COMMISSIONS FIRE ALARM POLICY. 13. FLORIDA WITH DISABILITIES ACCESSIBILITY ACT (2004). 14. SMACNA (2005). AIR DISTRIBUTION LEGEND DUCT: FIRST FIGURE IS SIDE SHOWN 24X12 _ DUCT MTD. SMOKE DETECTOR W /REMOTE & TEST SWITCH - AD ® (PROVIDE ACCESS DOOR. 12x12 min) SD _ /�" V Y V 1 DUCT SECTION: SUPPLY & RETURN OR EXHAUST FLEXIBLE DUCT; FLEXIBLE CONNECTION (FC)Y X FIRE RATED ENCLOSURE U.C. _ ALL ELBOW MUST BE PROVIDED WITH TURNING VANES WHETHER UNDERCUT DOOR OR SHOWN ON DWGS. FIRE STOPPING X THERMOSTAT (SEE NOTE 3) X �T TYP. 450 TAP -OFF WITH HUMIDISTAT (SEE NOTE 3)N VOLUME DAMPER VD �'` _ EXISTING EQUIPMENT OR DUCT TRANSITION RECTANGULAR TO BE REMOVED. TO ROUND NEUTRAL PRESSURE (Q) SPLITTER DAMPER POSSITIVE PRESSURE M NEUTRAL PRESSURE (-) EXISTING EQUIPMENT OR DUCT CAP 61 TO BE REMAIN ------ - FIRE DAMPER WITH ACCESS DOOR =AD POINT OF CONNECTION (12X12 ACCESS DOOR MIN.) BETWEEN NEW WORK AND F EXISTING NOTES 1. 45 TAP -OFFS, SPLITTERS AT EACH TAP -OFF AND TEE, AND ACCESS DOORS SHALL BEE USED WHERE REQUIRED, WHETHER OR NOT INDICATED IN THE DRAWINGS. 2. IN AREAS WHERE NON - REMOVABLE CIELINGS ARE USED, PROVIDE 45 TAP -OFFS OF THE FIXED TYPE, WITH WIDTH PROPORTION TO BRANCH CFM. 3. THERMOSTAT AND HUMIDISTAT MUST BE INSTALLED BETWEEN 48 " -54" MAX. HIGH ABOVE FINISHED FLOOR (FBC 2007 CHAPTER 11) - ------TYPE OF DIFFUSER A 1W DIRECTION OF FLOW 6x6 S O 9 SIZE OF DIFFUSER AMOUNT OF CFM AIR OUTLET TAG N.T.S. HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR X FIRE DAMPER(S) X For SMOKE DAMPER(S) X FIRE RATED ENCLOSURE X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X COORDINATION DRAWINGS 1. THE CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS TO ARCH./ENG AND OWNER'S PROJECT MANAGER FOR APPROVAL PRIOR TO ANY FABRICATION AND INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW PIPING, DUCTWORK, CONDUITS, ECT. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS OF THE BUILDING. VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOBSITE PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIALS. ANY CONFLICTS SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT /ENGINEER PRIOR TO BEGINNING OF CONSTRUCTION. COORDINATION NOTE AS PART OF THIS CONTRACT, THE SUB - CONTRACTOR AND THE CONTRACTOR ARE RESPONSIBLE FOR COORDINATION AND VERIFICATION THAT ALL EQUIPMENT, SHOWN IN THE ARCHITECTURAL DRAWINGS PARTICULARLY, BUT NOT LIMITED TO THE ARCHITECTURAL EQUIPMENT PLAN, INCLUDE ALL SERVICE /UTILITY REQUIRED TO OPERATE THE EQUIPMENT SHOWN. ANY DISCREPANCIES ARE TO BE POINTED OUT DURING THE BIDDING PROCESS. DISCREPANCIES NOT POINTED OUT DURING THE BIDDING PROCESS WILL BE RESOLVED BY THE CONTRACTOR AS PER THE ARCHITECT DETAILS AT NO ADDITIONAL COST TO THE OWNER. F- INFECTION CONTROL NOTE CONTRACTOR SHALL OBTAIN A COPY OF THE INFECTION CONTROL RISK ASSESMENT FOR THIS PROJECT. ALL WORK SHALL BE IN COMPLIANCE WITH THE REPORT. ALL WORK OUTSIDE THE SCOPE OF WORK AREA REQUIRED FOR THIS PROJECT, SHALL BE COORDINATED WITH OWNER AND BE IN COMPLIANCE WITH THE ICRA REPORT AND BE SUPERVISED BY THE OWNER'S REPRESENTATIVE. THE DRAWINGS DO NOT INDICATE EXISTING INSTALLATIONS OTHER THAN TO IDENTIFY MODIFICATIONS OR EXTENSIONS THERETO. VISIT THE SITE AND ASCERTAIN THE EXISTING CONDITIONS. REVIEW CONSTRUCTION DETAILS OF THE EXISTING PORTION OF THE BUILDING DURING THE SITE INSPECTION. INCLUDE ALL WORK REQUIRED TO REMOVE OR MODIFY PORTIONS OF THE EXISTING INSTALLATION IN ORDER TO ACCOMMODATE THE NEW WORK . FAILURE TO COMPLY WITH THIS WILL NOT BE CONSIDERED GROUNDS FOR ADDITIONAL PAYMENT IN CONNECTION WITH REMOVING OR MODIFYING ANY PART OF THE EXISTING INSTALLATION OR INSTALLING ANY NEW OR TEMPORARY WORK. A A ARCHITECT: BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers 9150 South Dadeland Blvd. * Suite 900 Miami * Florida 33156 * EB0000924 Telephone 305.670.0141 Facsimile 305.670.0144 www.liaopa.com Project No.: 22007 PERMIT SET 4/13/2012 REVISIONS: PROJECT NAME: SMH- HYPERBARIC CHAMBER PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 COMM. NO. 40068 SCALE: AS SHOWN DATE: 04/13/2011 DRAWN: AP CHECKED: CADD FILE: V /22007 -MEP DRAWING TITLE: SYMBOLS, LEGEND AND GENERAL NOTES HVAC SHEET NO. [L-Ti-[�IC For PERMIT SET 4/13/2012 REVISIONS: PROJECT NAME: SMH- HYPERBARIC CHAMBER PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 COMM. NO. 40068 SCALE: AS SHOWN DATE: 04/13/2011 DRAWN: AP CHECKED: CADD FILE: V /22007 -MEP DRAWING TITLE: SYMBOLS, LEGEND AND GENERAL NOTES HVAC SHEET NO. [L-Ti-[�IC