12-07-003M ETAL
PIPE OR
CONDUIT
PLUMBING LEGEND
SYMBOL
DESCRIPTION
2.
SANITARY PIPE
PIPE @ 1/4"
- - - - - --
EXIST. SANITARY PIPE
- - - - - - -
VENT LINE
-
COLD WATER LINE
--
HOT WATER LINE
CTG
CLEAN -OUT TO GRADE
WCO � I 0-ii WCO
WALL CLEAN -OUT
'
BALANCING VALVE
® FD
FLOOR DRAIN
JILVTR
VENT THRU ROOF
CD
CONDENSATE DRAINAGE LINE
-♦]o-
GATE VALVE
• F.EX
FIRE EXTINGUISHER ON WALL BRACKET
HB -I D
HOSE BIBB W/TAMPER VACUUM BREAKER
FEC
FIRE EXTINGUISHER IN CABINET
2
PIPE FLOOR PENETRATION
VB
VACUUM BREAKER
VIV
VALVE IN VERTICAL
VTR
VENT THRU ROOF
AFF
ABOVE FINISHED FLOOR LEVEL
0-
FLOOR CLEAN OUT
PT
PRESS. & TEMP. RELIEF LINE
1- 1/2 " @1 /4 " /FT.
GAS PIPE
�-C-
WATER HAMMER ARRESTOR
GAS COCK VALVE
CONSTRUCTION GENERAL NOTES:
1.,
RUN 1-1/2" PIPE ®
1/4" FT. FIXTURE ARM
2.
RUN 2"
PIPE @ 1/4"
FT.
3.
RUN 3"
PIPE 0 1/8"
FT.
4.
RUN 4"
PIPE @ 1/8"
FT.
5.
PROVIDE
CLEANOUT AT
BASE OF EACH SOIL
OF
AND WASTE STACK.
1 "
6.
INSTALL
1 /2 "CW AT RIGHT SIDE OF FIXTURES.
INSTALLATION
PROVIDE
AIR CHAMBER.
TUB
7. INSTALL 1 /2 "HW AT LEFT SIDE OF FIXTURES.
PROVIDE AIR CHAMBER.
8, FLOOR DRAINS
MUST
BE PLACED
WHERE THEY
NOT INTERFERE
WITH
WEEL CHAIR
TRAFFIC.
FILL GAP COMPLETELY
AROUND PIPE WITH
CP -25 S /L/ CAULK
(SEE NOTES 3 -5)
1 2 3 OR 4 J DAMMING MATERIAL:
HOUR FIRE RATED (FIBERGLASS •INSULATION,
CONCRETE FLOOR Lj BACKER ROD OR MINERAL
SLAB WOOL) ENOUGH TO
SUPPORT WEIGHT OF
CP -25 S/L CAULK
SECTION VIEW (SLAB)
1, 2, 3 OR 4
HOUR FIRE RATED
DAMMING BLOCK WALL OR
MATERIAL------------ SOLID CONCRETE
WALL (SEE NOTE 1)
PIPE OR
CONDUIT
CP -25 N/S CAULK
BOTH SIDES OF WALL
(SEE NOTE)
SECTION VIEW (WALL)
PIPE PENETRATION
NTS
11
NOTES:
WATER HAMMER ARRESTER SCHEDULE
MARK
* P.D.I. SIZE
CONN. SIZE
AO
A ( 1 - 11 F.U.)
1/2"
OB
(12 - 32 F.U.)
3/4"
OC
(33 - 60 F.U.)
1 "
OD
(61 - 11.3 F.U.)
1
OE
(114 - 154 F.U.)
1"
OF
(155 - 330 F.U.)
1 "
* PLUMBING AND DRAINAGE INSTITUTE STANDARD WH -201
PLUMBING GENERAL NOTES:
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT
NECESSARY FOR THE INSTAUAT10N OF A COMPLETE PLUMBING SYSTEM IN
ACCORDANCE WITH THESE DRAWINGS, THE APPLICABLE EDITION OF THE
FLORIDA BUILDING CODE 2001, AND ALL OTHER APPLICABLE STATE, COUNTY
AND LOCAL CODES AND ORDINANCES.
2. THE CONTRACTOR SHALL PAY ALL COSTS OF PERMIT, INSPECTIONS AND
ALL OTHER COSTS INCIDENTAL TO THE COMPLETION AND TESTING OF THIS
WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL
INSPECTION AUTHORITY SHALL BE FURNISHED TO THE OWNER.
3. ALL MATERIALS AND EQUIPMENTS SHALL BE NEW, OF U.S. MANUFACTURER
AND OF GOOD QUALITY OF RESPECTIVE KIND AND GRADE, AND MUST BE
FURNISHED SO AS TO PREVENT ANY DELAY IN THE PROGRESS OF THE
WORK. ALL WORK THROUGHOUT SHALL BE PERFORMED IN A WORKMAN-
LIKE MANNER BY SUFFICIENT NUMBER OF SKILLED WORKMEN.
4. CONTRACTOR SHALL VISIT THE SITE AND REVIEW ALL PERTINENT UTILITY
DRAWINGS TO FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING
AND /OR PROPOSED UTILITY STUB OUTS, PIPING, EQUIPMENT, ETC., AND
MAKE DUE ALLOWANCES FOR ANY CONDITION AFFECTING HIS WORK.
5. ALL UNDERGROUND SANITARY & STORM DRAINAGE PIPING AND FITTINGS
SHALL BE PVC -DWV (ASTM D- 2662/D- 3034).
6. ALL ABOVE GROUND SANITARY & STORM DRAINAGE BRANCH & VENT
PIPES AND FITTINGS SHALL BE PVC -DWV (ASTM D- 2662/D- 3034).
7. ALL UNDERGROUND WATER PIPING SHALL BE COPPER TYPE "K" (ASTM
B -306). ALL ABOVE GROUND PIPING SHALL BE COPPER TYPE (ASTM
(ASTM B -306).
8. ALL HOT WATER PRESSURE AND TEMPERATURE RELIEF PIPING SHALL BE
COPPER TYPE "K" (ASTM B -306).
9. ALL AIR CONDITIONING CONDENSATE DRAINAGE PIPING SHALL BE SCH. 40
PVC (ASTM D- 2662), EXCEPT WHEN INSTALLED IN RETURN AIR PLENUM
WHERE COPPER TYPE "DWV" OR EQUIVALENT MUST BE USED.
10. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY
ACCESSORIES SUCH AS STOP VALVES, 'P" TRAPS, SUPPORTS, P & T
VALVES, ETC., AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND
EQUIPMENT SHALL BE CHROME PLATED BRASS PIPE OR TUBE. PROVIDE
SHUT OFF VALVES AND UNIONS TO ALL FIXTURES, ETC., REQUIRING
WATER SUPPLY. PROVIDE DIELECTRIC COUPLINGS AS REQUIRED. FOR
ALL COPPER PIPING CONTRACTOR MUST USE 95/5 SOLDER. PROVIDE
WATER HAMMER ARRESTOR TO EACH FIXTURE AS REQUIRED.
11. PROVIDE CLIANOUTS (WITH CHROME PLATED WALL OR FLOOR ACCESS
FRAMES AND COVERS AS REQUIRED) AT THE BASE OF ALL WASTE
AND /OR VENT STACKS. PROVIDE PITCH PANS & LEADS FLASHING FOR
ALL SANITARY SYSTEM VENTS.
12. ALL HORIZONTAL WASTE PIPING SHALL BE SLOPPED AT 1/8 PER FOOT,
UNLESS OTHERWISE NOTED.
13 CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF
CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES
BEFORE STARTING WORK.
14 E.W.C. SHALL BE INSTALLED BEFORE TENANT OBTAINS HIS OCCUPATIONAL
LICENSE.- PLUMBING CONTRACTOR TO PROVIDE ROUGH -IN FOR FUTURE
INSTALLATION.- (TYPICAL AT ALL BAYS)
PLUMBING FIXTURE CONNECTION SCHEDULE
No.
DESCRIPTION
DRAIN
WATER
RATING
0 & SLOPE
REMARKS
FU
COLD
HOT
WC
WATER CLOSET
4"
1/2"
N/A
3 " &4 " ®1 /8 " /FT.
HOURS
4
L
LAVATORY
1-1/2"
1/2"
1/2"
1-1/2-@1/4"/FT.
INSTALLATION
2
T
TUB
1-1/2"
1/2"
1/2"
1-1/2"@1/4"/FF.
2
SH
SHOWER
2"
1/2"
1/2"
2 " ®1 /4 " /FT.
2
SK
KITCHEN SINK
1 -1/2"
1/2"
1/2"
1- 1/2 " @1 /4 " /FT.
2
WM
WASHING MACHINE
1 -1/2"
1/2"
1/2"
1- 1/2 " @1 /4 " /FT.
4
USE CP -25 S/L SELF - LEVELING
CAULK ON HORIZONTAL SURFACES
WHEN FILLING GAPS FROM ABOVE
THE PENETRATION.
USE CP -25 N/S NO SAG CAULK
ON VERTICAL SURFACES AND ON
HORIZONTAL SURFACES WHEN
FILLING GAPS FROM BELOW
NOTES:
1. FOR SOLID CONCRETE WALLS,
CENTER CP -25 N/S CAULK
WITHIN WALL WITH DAMMING
MATERIAL ON ONE SIDE
2. RECOMMENDATIONS BASED ON
PRODUCT PERFORMANCE PER
ASTM E -814 (UL -1479) FIRE
TEST AND UL CLASSIFICATION
FIRE STOP SYSTEM 49
3. WET INSTALLED DEPTH OF
CP -25 CAULKS DEPENDS ON
TYPE AND SIZE OF PIPE AND
DESIRED RATING
WET
PIPE
FIRE
DEPTH
SIZE
RATING
1/2"
MAX 8"
1 -2
13 mm)
(203mm)
HOURS
1 "
MAX 8"
3 -4
(25mm)
(203mm)
HOURS
4. UP TO
40% SHRINKAGE OF
CP -25
N/S OR S/L
CAULK
IS ACCEPTABLE AFTER INITIAL
WET DEPTH
INSTALLATION
5. MAXIMUM ANNULAR SPACE
TO BE FILLED IS 2 1/2" (64mm)
FIRESTOP DETAIL
g+
LL AZWNALI YAVtMtNI
C.L STREET
PLUMBING SITE PLAN
SCALE 1/32"
SCOPE OF WORK
INTERIOR RENOVATION TO CONVERT EXISTING
BATHROOM INTO TWO SMALL BATHROOMS
AND TO CONVERT EXISTING LAUNDRY ROOM
INTO A BATHROOM AND A LAUNDRY ROOM
LAUNDRY)
REVISIONS: BY
CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AT SITE SHALL ANY DISCREPANCY IS FOUND,
SWILL STOP THE WORK AND NOTIFY THE
ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH THE WORK.
CONTRACTOR SHALL DETERMINE LOCATION OF
ANY AND ALL EXISTING SUBTERRANEAN
UTILITIES OR CONSTRUCTION IN AREA OF
PROPOSED NEW WORK PRIOR TO COMMEN-
CEMENT OF NEW WORK IN ORDER TO AVOID
DAMAGE TO SAID EXISTING UTILITIES OR
CONSTRUCTION
These drawings and copies thereof fumished
z the Architect are his property, they are
t to be used on other work and are to
be returned upon demand at the completion
of work. If this drawing or any port thereof
in used in any manner without the consent
of the Architect, the user thereof becomes
indebted of the Architect for full commission
F-�-1
� A
.) tD .•
� I �
`..J CID
M"•�1 co U a 0 Cq
°o �w� 0
U .o Q)
0 cc
Q V) U
rd Cd
�yw E" f ..7 � Cd
w M o4 1
Cq U P. W
Q
0 mo
C
L ��ED
DATE
e o
12 -14 -2011
O
O
W
z
DRAWN
�
°
I
CDR
>
a
3132
SHEET
�
o
W
2 SHEETS
-.
z
z
o
N
0
DATE
Cl)
�
12 -14 -2011
O
O
W
z
DRAWN
�
°
I
CDR
>
a
3132
SHEET
�
o
W
2 SHEETS
-.
o
N
0
O
N
W
o
o�
O
z
Q
z
o
z
T
Er
W
0
::j
z
W
r7
O
LI-
Q
z
0
J
Oa_j
LL_
W
I_
Q��
>u.Q
z
0
W
LLI
N CN
WZwN
W
z
Q
M�
W
O�
W
+,
C°
�
v
W
J
z
0
NLd
z
DATE
12 -14 -2011
SCALE
AS SHOWN
DRAWN
CDR
JOB
3132
SHEET
P -1
OF
2 SHEETS