08-1384-013I
WI
Z_
J
of
I
Q.
Cr
a
WATER LEGEND
3"@ 1/8" SLOPE
2 "@ 1/4" SLOPE
1 -1/2 "@ 1/4" SLOPE
1 2 "MIN.
TANKLESS
I
W/H
LAUND
i
i
i
i
i
i
i
i
i
I
i -
co
i
i
i
EXISTING
1 "0 WATER
i
SERVICE
I
PLUMBING PLAN
SCALE: 1/4" = 1'- 0"
S�
3"
EXIST.
SEPTIC
i TANK
I
3"
i
EXIST.
TWO WAY
C, 0.
F_ — —
INTERIOR PARTITION WALL CONSTRUCTION
CHROME PLATED ACCESS COVER WITH
CLEANOUT PLUG JOSAM 58890 SERIES,
PIPE SIZE WALL SIZE
2, 4 ........ ...
........... _..
3 >' 4"
. ...
CONC. SLAB 4" 6"
SANITARY OF WASTE PIPING
wall cleanout detail
ROUGH IN TO 6" ABOVE
PROPOSED FINISHED
GRADE do CAP \.
FINISHED GRADE
FLOW
CUT BACK TO FINISHED
GRADE do PROVIDE 4"
THREADED BRASS CAP
N.T.S.
2-Way Clean -Out Detail
N.T.S.
SILL COCK 3/4"
HOSE BIBB.
SACK FLOW PRE -
VENTOR (NON —
REMOVABLE)
NATTS MODEL 8A
CONTROL VALVE
DOMESTIC
LID WATER
PPLY.
hose Bibb detail
N.T.S.
TANKLESS ELECTR'I_C:___
WATER HEATER SCHEDULE
MODEL No.
FIXTURE
DHC —E 10
TYPE OF FIXTURE
PHASE ........................................
FIXTURE
1
SYMBOL
.............................
VOLTAGE (V)
REMARKS
TOTAL
. ........ ...................
240
. ........
WATER 4
CLOSET
.......... ._........ .........
WATTAGE (kW)
........ ............................... .
.........
.......... _
9.6
4
AMPERAGE (A)
.......
40
LAV.
.... .. - - -- ....... .. .......... .... .... .. ..................
....... --
.-- .- .- ........ ............................ .
WASHER 4
CIRCUIT BREAKER (A)
TOTAL
50
21
.
........ ..
WIRE SIZE
........... _ _ .... .. ....... ......... ................................
I, . ........
........._ ........
6
MIN.FLOW .(GP.M) . _...
......
.....
................
0.45/1.7
2.
WEIGHT (LBS.)
p
............................................ .
z
DIMENSIONS
r
3.
WATER CONNECTIONS
10.
....
1/2" NPT
0
WORKING WATER PRESSURE MAX.
m
............
300 PSI
NOTE: PROVIDE ANTI -SCALD VALVES
AT SHOWER
FIXTURE UNITS PER
FIXTURE
(DENT.
TYPE OF FIXTURE
L
FIXTURE
UNITS
SYMBOL
FIXTURE UNITS
REMARKS
TOTAL
W.C.
. ........
WATER 4
CLOSET
8 NEW
SHOWER
SHOWER 2
4
JACUZZI
0
LAV.
LAVATORY 1
.........
3
......
W
WASHER 4
4
TOTAL
SCHEDULE, OR EQUAL.
21
PLUMBING FIXTURE SCHEDULE
REMARKS
PROVIDE W. MACH, BOX
JACUZZI
.......... . .. .......................
LAV. LAVATORY 1 1/2". 112 1 1/2': , 2" 1 1/2":;
- ........
W. WASHER 1 112 "' 1/2 2" 2" 2 PROVIDE W. MACH. BOX
PLUMBING NOTES:
6.
PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND
W
L
DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION
1.
ALL PLUMBING SHALL BE DONE IN ACCORDANCE WITH THE
OF MATERIALS AND EQUIPMENT.
FLORIDA BUILDING CODE, STATE AND LOCAL ORDINANCES,
7.
COORDINATE WORK WITH OTHER TRADES.
LU
A. FIXTURES ARE TO COMPLY WITH FBC
0
_J
L
8,
FURNISH AND INSTALL PLUMBING FIXTURES AS SPECIFIED IN FIXTURE
w
SCHEDULE, OR EQUAL.
LL
B. PROVIDE CLEANOUTS AS PER FBC
W
9.
EACH PLUMBING FIXTURE SHALL BE PROVIDED WITH AIR CHAMBERS
2.
PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND
p
AS PER F.B.C.
z
CONNECTION CHARGES REQUIRED.
r
3.
PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF
10.
PROVIDE SHUT OFF VALVE FOR EACH FIXTURE.
0
DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE
m
Z
W
YEAR FROM DATE OF ACCEPTANCE.
11.
WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC
�ry
UQ
�.
�
FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
4,
SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL
OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR TO INSTALLATION.
12.
PROVIDE PIPING AS FOLLOWS:
5.
OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE,
DOMESTIC COLD /HOT WATER PIPING AND EWH P&T RELIEF DRAIN PIPE:
DUCTWORK, ETC. AS REQUIRED BY FIELD CONDITIONS. COORDINATE
COPPER TUBE TYPE L OR M ABOVEGROUND WITH SOLDER JOINTS, MIN.
WITH ALL EXISTING AND NEW WORK.
125 LB. WOG BRONZE VALVES.
W,
z - rf
i
LL
O
W
L
U.)
WLn
�.L
LLJ
LU
W
0
_J
L
M
w
LL
Jw��o
W
LU
�fi
p
�
z
r
z
Cr)
�
M
0
_3
m
Z
W
LL
Q
�ry
UQ
�.
�
��
o�
a
U
Lo
LL
O
rt,
V
U.)
WLn
LLJ
W
LL
W
M
�
Q
W
z
0
m
H
N
�ry
DD
��
o�
a
Drawn ■y. PUERTO /CBS
(305) 262 -8075
Checked- M. LOPEZ
Date: 11/25/08
Project # 08 -115
Sheet:
P_ 1
r
}
rt,
Drawn ■y. PUERTO /CBS
(305) 262 -8075
Checked- M. LOPEZ
Date: 11/25/08
Project # 08 -115
Sheet:
P_ 1
r
}