Loading...
08-1384-013I WI Z_ J of I Q. Cr a WATER LEGEND 3"@ 1/8" SLOPE 2 "@ 1/4" SLOPE 1 -1/2 "@ 1/4" SLOPE 1 2 "MIN. TANKLESS I W/H LAUND i i i i i i i i i I i - co i i i EXISTING 1 "0 WATER i SERVICE I PLUMBING PLAN SCALE: 1/4" = 1'- 0" S� 3" EXIST. SEPTIC i TANK I 3" i EXIST. TWO WAY C, 0. F_ — — INTERIOR PARTITION WALL CONSTRUCTION CHROME PLATED ACCESS COVER WITH CLEANOUT PLUG JOSAM 58890 SERIES, PIPE SIZE WALL SIZE 2, 4 ........ ... ........... _.. 3 >' 4" . ... CONC. SLAB 4" 6" SANITARY OF WASTE PIPING wall cleanout detail ROUGH IN TO 6" ABOVE PROPOSED FINISHED GRADE do CAP \. FINISHED GRADE FLOW CUT BACK TO FINISHED GRADE do PROVIDE 4" THREADED BRASS CAP N.T.S. 2-Way Clean -Out Detail N.T.S. SILL COCK 3/4" HOSE BIBB. SACK FLOW PRE - VENTOR (NON — REMOVABLE) NATTS MODEL 8A CONTROL VALVE DOMESTIC LID WATER PPLY. hose Bibb detail N.T.S. TANKLESS ELECTR'I_C:___ WATER HEATER SCHEDULE MODEL No. FIXTURE DHC —E 10 TYPE OF FIXTURE PHASE ........................................ FIXTURE 1 SYMBOL ............................. VOLTAGE (V) REMARKS TOTAL . ........ ................... 240 . ........ WATER 4 CLOSET .......... ._........ ......... WATTAGE (kW) ........ ............................... . ......... .......... _ 9.6 4 AMPERAGE (A) ....... 40 LAV. .... .. - - -- ....... .. .......... .... .... .. .................. ....... -- .-- .- .- ........ ............................ . WASHER 4 CIRCUIT BREAKER (A) TOTAL 50 21 . ........ .. WIRE SIZE ........... _ _ .... .. ....... ......... ................................ I, . ........ ........._ ........ 6 MIN.FLOW .(GP.M) . _... ...... ..... ................ 0.45/1.7 2. WEIGHT (LBS.) p ............................................ . z DIMENSIONS r 3. WATER CONNECTIONS 10. .... 1/2" NPT 0 WORKING WATER PRESSURE MAX. m ............ 300 PSI NOTE: PROVIDE ANTI -SCALD VALVES AT SHOWER FIXTURE UNITS PER FIXTURE (DENT. TYPE OF FIXTURE L FIXTURE UNITS SYMBOL FIXTURE UNITS REMARKS TOTAL W.C. . ........ WATER 4 CLOSET 8 NEW SHOWER SHOWER 2 4 JACUZZI 0 LAV. LAVATORY 1 ......... 3 ...... W WASHER 4 4 TOTAL SCHEDULE, OR EQUAL. 21 PLUMBING FIXTURE SCHEDULE REMARKS PROVIDE W. MACH, BOX JACUZZI .......... . .. ....................... LAV. LAVATORY 1 1/2". 112 1 1/2': , 2" 1 1/2":; - ........ W. WASHER 1 112 "' 1/2 2" 2" 2 PROVIDE W. MACH. BOX PLUMBING NOTES: 6. PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND W L DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION 1. ALL PLUMBING SHALL BE DONE IN ACCORDANCE WITH THE OF MATERIALS AND EQUIPMENT. FLORIDA BUILDING CODE, STATE AND LOCAL ORDINANCES, 7. COORDINATE WORK WITH OTHER TRADES. LU A. FIXTURES ARE TO COMPLY WITH FBC 0 _J L 8, FURNISH AND INSTALL PLUMBING FIXTURES AS SPECIFIED IN FIXTURE w SCHEDULE, OR EQUAL. LL B. PROVIDE CLEANOUTS AS PER FBC W 9. EACH PLUMBING FIXTURE SHALL BE PROVIDED WITH AIR CHAMBERS 2. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND p AS PER F.B.C. z CONNECTION CHARGES REQUIRED. r 3. PLUMBING CONTRACTOR SHALL GUARANTEE ALL WORK FREE OF 10. PROVIDE SHUT OFF VALVE FOR EACH FIXTURE. 0 DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE m Z W YEAR FROM DATE OF ACCEPTANCE. 11. WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC �ry UQ �. � FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 4, SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR TO INSTALLATION. 12. PROVIDE PIPING AS FOLLOWS: 5. OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DOMESTIC COLD /HOT WATER PIPING AND EWH P&T RELIEF DRAIN PIPE: DUCTWORK, ETC. AS REQUIRED BY FIELD CONDITIONS. COORDINATE COPPER TUBE TYPE L OR M ABOVEGROUND WITH SOLDER JOINTS, MIN. WITH ALL EXISTING AND NEW WORK. 125 LB. WOG BRONZE VALVES. W, z - rf i LL O W L U.) WLn �.L LLJ LU W 0 _J L M w LL Jw��o W LU �fi p � z r z Cr) � M 0 _3 m Z W LL Q �ry UQ �. � �� o� a U Lo LL O rt, V U.) WLn LLJ W LL W M � Q W z 0 m H N �ry DD �� o� a Drawn ■y. PUERTO /CBS (305) 262 -8075 Checked- M. LOPEZ Date: 11/25/08 Project # 08 -115 Sheet: P_ 1 r } rt, Drawn ■y. PUERTO /CBS (305) 262 -8075 Checked- M. LOPEZ Date: 11/25/08 Project # 08 -115 Sheet: P_ 1 r }